Flexible job-shop scheduling problem (FJSP) is one of the instances in flexible manufacturing systems. It is considered as a very complex to control. Hence generating a control system for this problem domain is difficult. FJSP inherits the job-shop scheduling problem characteristics. It has an additional decision level to the sequencing one which allows the operations to be processed on any machine among a set of available machines at a facility. In this article, we present Artificial Fish Swarm Algorithm with Harmony Search for solving the flexible job shop scheduling problem. It is based on the new harmony improvised from results obtained by artificial fish swarm algorithm. This improvised solution is sent to comparison to an overall best solution. When it is the better one, it replaces with the artificial fish swarm solution from which this solution was improvised. Meanwhile the best improvised solutions are carried over to the Harmony Memory. The objective is to minimize a total completion time (makespan) and to make the proposed approach as a portion of the expert and the intelligent scheduling system for remanufacturing decision support. Harmony search algorithm has demonstrated to be efficient, simple and strong optimization algorithm. The ability of exploration in any optimization algorithm is one of the key points. The obtained optimization results show that the proposed algorithm provides better exploitation ability and enjoys fast convergence to the optimum solution. As well, comparisons with the original artificial fish swarm algorithm demonstrate improved efficiency.
This study uses an Artificial Neural Network (ANN) to examine the constitutive relationships of the Glass Fiber Reinforced Polymer (GFRP) residual tensile strength at elevated temperatures. The objective is to develop an effective model and establish fire performance criteria for concrete structures in fire scenarios. Multilayer networks that employ reactive error distribution approaches can determine the residual tensile strength of GFRP using six input parameters, in contrast to previous mathematical models that utilized one or two inputs while disregarding the others. Multilayered networks employing reactive error distribution technology assign weights to each variable influencing the residual tensile strength of GFRP. Temperatur
... Show MoreFlexible joint robot (FJR) manipulators can offer many attractive features over rigid manipulators, including light weight, safe operation, and high power efficiency. However, the tracking control of the FJR is challenging due to its inherent problems, such as underactuation, coupling, nonlinearities, uncertainties, and unknown external disturbances. In this article, a terminal sliding mode control (TSMC) is proposed for the FJR system to guarantee the finite-time convergence of the systems output, and to achieve the total robustness against the lumped disturbance and estimation error. By using two coordinate transformations, the FJR dynamics is turned into a canonical form. A cascaded finite-time sliding mode observer (CFTSMO) is construct
... Show Morein this article, we present a definition of k-generalized map independent of non-expansive map and give infinite families of non-expansive and k-generalized maps new iterative algorithms. Such algorithms are also studied in the Hilbert spaces as the potential to exist for asymptotic common fixed point.
This study tackles a fourth-order inverse problem involving a cantilever beam with nonlocal conditions to simultaneously calculate the beam’s displacement and an unknown time-dependent coefficient. A finite difference approach is suggested to discretize the hyperbolic fourth-order equation. A stability analysis for the proposed scheme is also provided. The indirect problem is the minimization of the misfit function. The goal of the minimization algorithm is to reduce the gap between the measured (noisy) data and the numerical computed solution provided by the model. To achieve stable results, Tikhonov’s regularization technique is employed, and two numerical test examples are shown to illustrate the suggested scheme's reliabilit
... Show MoreIn this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.
Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.
Introduction
Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi
... Show MoreIn this work, mesoporous silica SBA-15 was prepared and functionalized with amine groups (i.e., NH2) to form NH2/SBA-15. The curcumin (CUR) was encapsulated into the surface and pore of NH2/SBA-15 to create CUR@NH2/SBA-15 as an efficient carrier in drug delivery systems (DDSs). The three samples (i.e., SBA-15, NH2/SBA-15, and CUR@NH2/SBA-15) were characterized. The study investigated the effect of the carrier dose, initial CUR concentration, pH, and contact time on the CUR loading efficiency (DLE%) via adsorption. The best DLE% for the SBA-15 and NH2/SBA-15 were found to be 45% and 89.7%, respectively. The Langmuir isotherm had a greater correlation coefficient (R2) of 0.998 for SBA-15. A pseudo-secondorder kinetic model seemed to fit well
... Show MoreAbstract
Objective(s): To assess the job satisfaction during of covid-19 among the nurses in respiratory isolation units of coronavirus disease.
Methodology: A descriptive cross-sectional design was carried out in four hospitals at isolation units of coronavirus disease from the period (21th December, 2021 to 27th January, 2022). A non-probability (convenience) sampling method consists of (300) nurse was selected convenience based on the study criteria. The tool used to measure the job satisfaction is Job satisfaction scale for clinical nursing (JSS-CN). This tool consists of two parts, the first part is for demographic information and consists of 8 items, and the second
... Show More