Integration Building Information Modeling and Lean Construction Technologies in the Iraqi Construction Sector: Benefits and Constraints
...Show More Authors

Building Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.

According to the study's findings, the benefits include ensuring the most effective project delivery method and shortening the design project life cycle. The building industry's procedures will incorporate suppliers. In contrast, the main constraints include the government rules and industry standards for BIM and LC are not obligatory, the absence of government funding and participation, and the industry's resistance to changing from customary operating methods. The study strategies and recommendations will enhance BIM-LC-LC implementation. It allows project partners to focus on addressing the challenges identified in this study and understand the benefits of BIM-LC to be an incentive to adopt them.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri May 01 2020
Journal Name
Practice Periodical On Structural Design And Construction
Utilizing Emerging Technologies for Construction Safety Risk Mitigation
...Show More Authors

View Publication
Scopus (90)
Crossref (74)
Scopus Clarivate Crossref
Publication Date
Tue Oct 12 2021
Journal Name
Innovative Infrastructure Solutions
Facilitating claims settlement using building information modeling in the school building projects
...Show More Authors

View Publication
Scopus (9)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Financing Cost Optimization in Construction Sector: A Review
...Show More Authors

The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Mar 01 2020
Journal Name
Iop Conference Series: Materials Science And Engineering
Identify the main factors affecting labor productivity within different organizational structures in the Iraqi construction sector
...Show More Authors
Abstract<p>The construction sector in Iraq has faced many challenges. One of the major challenges is the lack of productivity of laborers who are working construction sites. Although research studies have been conducted to investigate, explore, and identify factors influencing labor productivity in the Middle-east region, the lack of such research studies to address these challenges in Iraq. This motivates the researcher to explore and identify the key factors affecting labor productivity in construction sites across different organizational structures (Matrix, Projectized, and functional). A survey questionnaire has been conducted using Delphi technique in order to achieve a concrete and reliab</p> ... Show More
View Publication
Scopus (8)
Crossref (7)
Scopus Crossref
Publication Date
Sat Aug 01 2020
Journal Name
Practice Periodical On Structural Design And Construction
Case Study to Evaluate Work-Zone Safety Technologies in Highway Construction
...Show More Authors

View Publication
Scopus (10)
Crossref (9)
Scopus Clarivate Crossref
Publication Date
Thu Jun 10 2021
Journal Name
Engineering, Technology &amp; Applied Science Research
Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology
...Show More Authors

In this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive meas

... Show More
View Publication
Scopus (5)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Proceedings Of The International Conference On Research Advances In Engineering And Technology - Itechcet 2022
Suitability of Iraqi legal system for building operation transfer contract in infrastructure construction projects
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Wed Jul 05 2017
Journal Name
International Journal Of Science And Research (ijsr)
Assessing BIM Integration with Sustainable Requirement for Buildings Construction
...Show More Authors

View Publication
Crossref (4)
Crossref
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and