The research endeavors to harness the benefits stemming from the integration of constraint theory into construction project management, with the primary goal of mitigating project completion delays. Additionally, it employs fuzzy analysis to determine the relative significance of fundamental constraints within projects by assigning them appropriate weights. The research problem primarily revolves around two key issues. Firstly, the persistent utilization of outdated methodologies and a heavy reliance on workforce experience without embracing modern computerized technologies. Secondly, the recurring problem of project delivery delays. Construction projects typically encompass five fundamental constraint types: cost restrictions, time constraints, administrative and legal limitations, technical and design constraints, and environmental constraints. To address these issues, a field study was conducted, focusing on the development of a housing complex in Qa'imaqamiya, Al-Mada'in district, Bismayah. The researchers propose a three-stage methodology to tackle these challenges. In the initial stage, the theory of accelerated activities is applied to all concurrent implementable tasks. Subsequently, the second stage introduces a hierarchical analysis process, known as FAHP, to quantify the importance of each constraint. Finally, in the third phase, fuzzy logic is employed to calculate the projected duration and associated costs for each activity, ensuring project execution and delivery within agreed-upon timeframes. After applying the proposed methodology, there is a reduction in completion time by up to (23%). Research Type: Research Paper
This research investigated the importance and priorities of the project overhead costs in Iraq via a questionnaire using the fuzzy analytic hierarchy process technique (FAHP). Using this technique is very important in the uncertain circumstances as in our country. The researcher reached to frame an equation through the results of the priorities of weights include the percentages of each of the main items of the project overhead costs. The researcher tested this equation by applying it to one of the completed projects and the results showed suitability for the application. The percentages of the (salaries, grants, and incentives) and (fieldwork requirements) in equation represent approximately two-thirds of project overhe
... Show MoreReconstruction project management in the cities of Mosul, Anbar, and Tikrit, in Iraq still faces major obstacles that impede the comprehensive performance of these projects. It is thus necessary to improve the arising challenge estimation in the implementation of reconstruction projects and evaluate their components: time, cost, quality, and scope. This study used the Analytical Hierarchy Process (AHP) to prioritize major and minor criteria in the influential causes of challenges and formulate a mathematical model to help decision-makers estimate them. Using the Super Decisions software, the final results indicated that changes in scope reached 40.8%, which is the greatest difficulty, followed by changes in cost at 27.6%, changes in
... Show MoreThe aim of this work is to provide an efficient selection technique as a part of planning process to guide the decision makers to decide the preferences of one supplier over another for purchasing lab instruments in education domain. Fuzzy Analytical Hierarchy Process has used as a multi-criteria decision process, as an industrial engineering tool with certain emphasis on the qualitative aspects required to the decision makers. While the concept of degree of possibility for each criterion is used to reach its relative weights, a specific methodology created to reach the final objective decision of supplier selection. A questionnaire form was developed and distributed to five universities located in Baghdad province with a total
... Show MoreThe assignment of suitable sites for water harvesting techniques is a promoted strategy to be introduced to the community, for handling the water scarcity and risk due to floods. In the eastern part of Missan, water is always hampered due to the limited availability during the drought, while floods frequently and intensely occur in the wet season. This study aimed to choose the potential and suitable sites for applied water harvesting system using remote sensing techniques and analytic hierarchy process (AHP). Ali Al-Garbi city is divided into three watersheds (site1, site2, and site3), which have been characterized by flash floods that produce high quantities of runoff. The six parameters: slope, lineament density, drainage den
... Show MoreThe importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers) are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twe
... Show MoreThe process of evaluating business processes, complex, repetition of procurement processes, need for raw materials and frequency of demand, which makes dealing with suppliers in the evaluation process, making the need for a process intervention in the process. Lighter on the other hand.
Many Iraqi companies suffer from problems related to suppliers, and cases of administrative and financial corruption are often raised regarding this type of contract and from this reality the necessity of researching this problem and trying to develop some solutions to reduce its impact on the companies' work, by using a method that works according to the standards adopted in Evaluation and selection of the supplier in the
... Show MoreThe research aims to define the main and subsidiary criteria for evaluating the industrial market sectors and proposing a model for arranging these criteria according to priority and knowing the highest criteria in terms of relative importance in the General Company for Automobile Trade and Machinery, and for the purpose of establishing this model, experiences in the concerned company were approved, and this study proposes a multi-criteria decision model According to the FEAHP, the expanded fuzzy hierarchical analysis method enables the commercial company to develop clear strategic policies on which the company’s management system depends on determining criteria for evaluating and selecting market sectors and making appropriate
... Show MoreThis research involves the application of spectral indices and GIS techniques coupled with the Analytic Hierarchy Process, to assess Baglia site, eastern Missan, as a water harvesting potential site. The AHP and pairwise comparison have been used through select four criteria including TWI, TRI, MNDWI, and NDSI, which were deemed as impact factors for this study. All these criteria have been weighted according to their significance in the water harvesting system. The findings of the AHP analysis method explained that the WH potential zones in Baglia site were divided into three zones, namely, high, medium, and low suitability. The findings demonstrate that Bglia site, where the highly appropriate zone is located in the deep v
... Show MoreThis study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show MoreEffective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul