Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology
...Show More Authors

In this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive measures to prevent threats from resulting in corruption and were examined for each threat.

Scopus Clarivate Crossref
View Publication
Publication Date
Sat Jun 26 2021
Journal Name
Asian Journal Of Civil Engineering
Using AHP to prioritize the corruption risk practices in the Iraqi construction sector
...Show More Authors

View Publication
Scopus (5)
Crossref (5)
Scopus Crossref
Publication Date
Thu Mar 01 2018
Journal Name
Journal Of Engineering
Risks of Design Stage in Iraqi Construction Project
...Show More Authors

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.

It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu Apr 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
Using Project Management Maturity Model to Evaluate Construction Sector -Organizations. Case Study at the Department of buildings - Karkh first
...Show More Authors

The education sector suffers from many problems, including the scarcity of schools that can absorb the increasing number of students in light of the increasing population growth rate, as some regions suffer from a lack of opening of new schools or the expansion of existing schools to increase their capacity so that attention is required. The research sought to identify the level of maturity of project management at the research site (Building Department in Al-Karkh I/ Ministry of Education) Being responsible for educational projects and their implementation and to know that, the ten areas of the knowledge guide to project management PMBOK have been adopted according to the PM3 model (one of the models of maturity

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Evaluating the Knowledge for Integrating RM and VM Using BIM in the Iraqi Construction Sector
...Show More Authors

The construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Apr 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
Risk Analysis of Projects Accordance with the Professional Project Management System: A case- Study Mansur Construction Contracting Company here
...Show More Authors

The research aims to identify the risks faced by projects and work on the administration, such as those risks by using professional Project Management System (Project Management Professional) by identifying those risks and their impact on the objectives of the project, if they occur and to provide appropriate responses to Ha.autam search application on the draft Law Faculty port by the General Mansour Construction Contracting company has been using a method personal interview with the heads of departments and project managers in the Al-Mansour and tools descriptive and quantitative analysis as was used (likelihood and impact of risk analysis, Ai_kaoa scheme Sbb- effect, analysis of probability and impact, risk matrix (probability

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Oct 30 2018
Journal Name
Journal Of Engineering
Evaluation of the Project Overhead Costs in Iraqi Construction Industry using Fuzzy Analytic Hierarchy Process (FAHP)
...Show More Authors

This research investigated the importance and priorities of the project overhead costs in Iraq via a questionnaire using the fuzzy analytic hierarchy process technique (FAHP). Using this technique is very important in the uncertain circumstances as in our country. The researcher reached to frame an equation through the results of the priorities of weights include the percentages of each of the main items of the project overhead costs. The researcher tested this equation by applying it to one of the completed projects and the results showed suitability for the application. The percentages of the (salaries, grants, and incentives) and (fieldwork requirements) in equation represent approximately two-thirds of project overhe

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jun 01 2023
Journal Name
Journal Of Engineering
Integration Building Information Modeling and Lean Construction Technologies in the Iraqi Construction Sector: Benefits and Constraints
...Show More Authors

Building Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.

According to the study's findings, the benefits include ensuring the most ef

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (1)
Crossref