Identify the main factors affecting labor productivity within different organizational structures in the Iraqi construction sector
Abstract<p>The construction sector in Iraq has faced many challenges. One of the major challenges is the lack of productivity of laborers who are working construction sites. Although research studies have been conducted to investigate, explore, and identify factors influencing labor productivity in the Middle-east region, the lack of such research studies to address these challenges in Iraq. This motivates the researcher to explore and identify the key factors affecting labor productivity in construction sites across different organizational structures (Matrix, Projectized, and functional). A survey questionnaire has been conducted using Delphi technique in order to achieve a concrete and reliable view of the major factors influencing labor productivity in Iraq. Twenty-four experts from different construction sectors have participated in Delphi rounds. In addition, a total of 110 factors affecting labor productivity is considered in this study. The main findings of this study show a correlation between some of the identified factors and characteristics of the organizational structures. The poor communication and management of the construction site, lack of communication and coordination between construction parties, size and arrangement of the construction crew, on-time payment, and motivational program factors were found to be highly correlated with the characteristics of the selected organizational structures. Also, the study shows that explosive remnants and dangerous construction sites due to terrorist attacks are very influential factors on labor productivity.</p>
Scopus Crossref
View Publication
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Factors Affecting Labor Productivity on Construction in Kurdistan of Iraq: Web Survey

This study was set out to investigate factors affecting labor productivity on construction in the north of Iraq (Kurdistan) and to rank all the factors based on engineers, contractors, and designer’s opinions. 76 factors were analyzed based on previous literature and a pilot study. Next, by using online Google Form, a questionnaire form was created and sent to people who have experience in the construction industry. Afterward, the questionnaire form was sent to targeted people by email and social media apps. Factors were divided into nine groups “Management, Technical and Technology, Human and Workforce, Leadership, Motivation, Safety, Time, Material and Equipment, and External”. However, 202 respondents participated in this study,

... Show More
Crossref (1)
Crossref
View Publication Preview PDF
Publication Date
Sat Jun 27 2020
Journal Name
Asian Journal Of Civil Engineering
Scopus (4)
Crossref (5)
Scopus Crossref
View Publication
Publication Date
Mon Jan 01 2024
Journal Name
Journal Of Engineering
Significant Safety Factors Affecting the Safety Performance in Iraqi Construction Projects

Despite recent attempts to improve safety in the construction sector, this sector is considered dangerous and unsafe. Iraq is one of the emerging nations that suffers from a lack of construction safety management. In 2018, the construction sector in Iraq was responsible for 38% of all industrial accidents. Creating a safety program minimizes this problem by making safety an intrinsic part of construction projects. As a result, this article aims to identify the crucial safety factors that affect the safety performance in Iraqi construction projects. After conducting a critical literature review of the related literature, a list of 35 sub-factors classified into nine categories of main factors was chosen to rank each facto

... Show More
Crossref
View Publication Preview PDF
Publication Date
Mon Oct 02 2023
Journal Name
Journal Of Engineering
Main Delay Factors of Implementation EPC Construction Projects in Iraq

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.

... Show More
Crossref (2)
Crossref
View Publication Preview PDF
Publication Date
Sat Dec 25 2021
Journal Name
International Journal Of Drug Delivery Technology
Study of Main Factors Affecting the Leakage of Aluminum into the Food Wrapped in Aluminum Foil During Cooking

Different cooking conditions were examined for aluminum content in food cooked while wrapped with aluminum foil. The influence of each anticipated factor (the acidity of the cooking medium, type of acids normally used in cuisines namely acetic and tartaric acids, various cooking temperatures, influence of the presence of sodium chloride salt, the effect of cooking oil, and the length of time of cooking) was studied thoroughly as a function of aluminum degraded out of the aluminum foils to the medium. The experimental samples were digested with nitric acid upon fulfillment of examining each factor separately before quantifying aluminum with the sensitive technique of atomic absorption spectroscopy. The outcomes of the study have shown that t

... Show More
Scopus
View Publication Preview PDF
Publication Date
Thu Jan 01 2015
Journal Name
Journal Of Engineering
Performance Improvement of the Implementation of Concrete Structures in the Construction Sector In Iraq Using The Modern Management Technique “Six Sigma”

The reality of the field of construction projects in Iraq refers to needing for the development of performance in order to improve quality and reduce defects and errors and to control the time and cost, so there is needing for the application of effective methods in this area, one of the methods that can be applied in this area is the manner of Six Sigma. This research aims to enhance the performance and quality improvement for the construction projects by improving performance in the work of the implementation of the concrete structure depending on the Six Sigma methodology, and for the purpose of achieving the aim of the research, the researcher firstly depends on the theoretical study that include the concepts of qual

... Show More
View Publication
Publication Date
Sat Jan 01 2022
Journal Name
Archives Of Civil Engineeringthis Link Is Disabled
Scopus (3)
Scopus
Publication Date
Sat Jun 26 2021
Journal Name
Asian Journal Of Civil Engineering
Scopus (5)
Crossref (5)
Scopus Crossref
View Publication
Publication Date
Thu Dec 31 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Creative accounting and the factors affecting its practice in Iraqi companies

The research aims at introducing accountability creative and the factors influencing or helping to Do in Iraqi companies, was launched two assumptions first that he was effect with significance to a number of factors in the direction of departments in Iraqi companies to practice creative accounting , were selected (9) factors believed to researchers it's most influential, and second that there importance of significance for a number of ways or methods to prevent or combat creative accounting , and the purpose of testing hypotheses have been designed questionnaire was distributed to a sample of 48 individual practitioners accountable in Iraqi companies and auditors in charge of auditing the accounts of those companies , after anal

... Show More
View Publication Preview PDF
Publication Date
Thu Jun 01 2023
Journal Name
Journal Of Engineering
Integration Building Information Modeling and Lean Construction Technologies in the Iraqi Construction Sector: Benefits and Constraints

Building Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.

According to the study's findings, the benefits include ensuring the most ef

... Show More
Crossref (1)
Crossref
View Publication Preview PDF