The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in their models or included a schedule of borrowed money and a repayment schedule with interest rates. The aim of this study is not only to eliminate the shortcomings of previous studies but also to incorporate a financing optimization model for various funding alternatives available to contractors in terms of funding sources and forms, cash provision times, interest rates and repayment options. This work proposes a financing optimization model, not only to remove the limitations but also to find optimal financing costs while offering the financing schedule without increasing the project duration and adjusting the starting times of the activities.
In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
Optimization of gas lift plays a substantial role in production and maximizing the net present value of the investment of oil field projects. However, the application of the optimization techniques in gas lift project is so complex because many decision variables, objective functions and constraints are involved in the gas lift optimization problem. In addition, many computational ways; traditional and modern, have been employed to optimize gas lift processes. This research aims to present the developing of the optimization techniques applied in the gas lift. Accordingly, the research classifies the applied optimization techniques, and it presents the limitations and the range of applications of each one to get an acceptable level of accura
... Show More
The research aims to study and analysis of concurrent engineering (CE) and cost optimization (CO), and the use of concurrent engineering inputs to outputs to improve the cost, and the statement of the role of concurrent engineering in improving the quality of the product, and achieve savings in the design and manufacturing time and assembly and reduce costs, as well as employing some models to determine how much the savings in time, including the model (Lexmark) model (Pert) to determine the savings in design time for manufacturing and assembly time.
To achieve the search objectives, the General Company for Electrical and Electronic Industries \ Refrigerated Engine
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreTraditionally, path selection within routing is formulated as a shortest path optimization problem. The objective function for optimization could be any one variety of parameters such as number of hops, delay, cost...etc. The problem of least cost delay constraint routing is studied in this paper since delay constraint is very common requirement of many multimedia applications and cost minimization captures the need to
distribute the network. So an iterative algorithm is proposed in this paper to solve this problem. It is appeared from the results of applying this algorithm that it gave the optimal path (optimal solution) from among multiple feasible paths (feasible solutions).
Drilling well design optimization reduces total Authorization for Expenditures (AFE) by decreasing well constructing time and expense. Well design is not a constant pattern during the life cycle of the field. It should be optimized by continuous improvements for all aspects of redesigning the well depending on the actual field conditions and problems. The core objective of this study is to deliver a general review of the well design optimization processes and the available studies and applications to employ the well design optimization to solve problems encountered with well design so that cost effectiveness and perfect drilling well performance are achievable. Well design optimization processes include unconventional design(slimhole) co
... Show MoreThe construction sector is considered an important and influential pivot in the national economy of any country. Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during
... Show MoreFor the duration of the last few many years many improvement in computer technology, software program programming and application production had been followed with the aid of diverse engineering disciplines. Those trends are on the whole focusing on synthetic intelligence strategies. Therefore, a number of definitions are supplied, which recognition at the concept of artificial intelligence from exclusive viewpoints. This paper shows current applications of artificial intelligence (AI) that facilitate cost management in civil engineering tasks. An evaluation of the artificial intelligence in its precise partial branches is supplied. These branches or strategies contributed to the creation of a sizable group of fashions s
... Show MoreOne of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc
... Show More