Abstract Political power in Lebanon is a fundamental objective of any political organization, whether political party or political group. Thus, there is a conflict of power. There are two kinds of political conflict that are differentiated by the idea of legitimacy. The competition is in the political system when the agreement between the social forces is considered legitimate, and the conflict is on the political system when the agreement between these forces ceases to be legitimate and Are working to topple it and seek to establish an alternative system. Therefore, the succession of power in Lebanon is a result of the competition and political conflict, which is in turn a result of the large number of regional and international players on the Lebanesearena.
This study discussed a biased estimator of the Negative Binomial Regression model known as (Liu Estimator), This estimate was used to reduce variance and overcome the problem Multicollinearity between explanatory variables, Some estimates were used such as Ridge Regression and Maximum Likelihood Estimators, This research aims at the theoretical comparisons between the new estimator (Liu Estimator) and the estimators
لقد مثلت عملية التحول من النظام الشمولي الى مشروع اقامة نظام جديد ومغاير نقلة نوعية شهده المجتمع العراقي بعد 9/4/ 2003 القت بظلالها على مختلف الاصعدة السياسية والاقتصادية والاجتماعية، ولعل من بين ابرز تلك التحولات ذلك الذي تبلور على حول مفهوم الهوية الوطنية واعادة تشكيلها من خلال صياغة جديدة لمفهوم المواطنة الذي يفترض ان تكون القاعدة الراسخة التي يتأسس عليها المشروع الوطني الجديد الرامي الى إقامة او إعادة تأسي
... Show Moreلقد مثلت عملية التحول من النظام الشمولي الى مشروع اقامة نظام جديد ومغاير نقلة نوعية شهده المجتمع العراقي بعد 9/4/ 2003 القت بظلالها على مختلف الاصعدة السياسية والاقتصادية والاجتماعية، ولعل من بين ابرز تلك التحولات ذلك الذي تبلور على حول مفهوم الهوية الوطنية واعادة تشكيلها من خلال صياغة جديدة لمفهوم المواطنة الذي يفترض ان تكون القاعدة الراسخة التي يتأسس عليها المشروع الوطني الجديد الرامي الى إقامة او إعادة تأسي
... Show MoreThe research aims to know the impact of the innovative matrix strategy and the problem tree strategy in teaching mathematics to intermediate grade female students on mathematical proficiency. To achieve the research objectives, an experimental approach and a quasi-experimental design were used for two equivalent experimental groups. The first is studied according to the innovative matrix strategy, the second group is studied according to the problem tree strategy. The research sample consisted of (32) female students of the first intermediate grade, who were intentionally chosen after ensuring their equivalence, taking into several factors, most notably (chronological age, previous achievement, and intelligence test). The research tools con
... Show MoreThis paper proposes a new algorithm (F2SE) and algorithm (Alg(n – 1)) for solving the
two-machine flow shop problem with the objective of minimizing total earliness. This
complexity result leads us to use an enumeration solution approach for the algorithm (F2SE)
and (DM) is more effective than algorithm Alg( n – 1) to obtain approximate solution.
Machine scheduling problems (MSP) are considered as one of the most important classes of combinatorial optimization problems. In this paper, the problem of job scheduling on a single machine is studied to minimize the multiobjective and multiobjective objective function. This objective function is: total completion time, total lead time and maximum tardiness time, respectively, which are formulated as are formulated. In this study, a mathematical model is created to solve the research problem. This problem can be divided into several sub-problems and simple algorithms have been found to find the solutions to these sub-problems and compare them with efficient solutions. For this problem, some rules that provide efficient solutio
... Show MoreWithin this research, The problem of scheduling jobs on a single machine is the subject of study to minimize the multi-criteria and multi-objective functions. The first problem, minimizing the multi-criteria, which include Total Completion Time, Total Late Work, and Maximum Earliness Time (∑𝐶𝑗, ∑𝑉𝑗, 𝐸𝑚𝑎𝑥), and the second problem, minimizing the multi-objective functions ∑𝐶𝑗 + ∑𝑉𝑗 +𝐸𝑚𝑎𝑥 are the problems at hand in this paper. In this study, a mathematical model is created to address the research problems, and some rules provide efficient (optimal) solutions to these problems. It has also been proven that each optimal solution for ∑𝐶𝑗 + ∑𝑉𝑗 + 𝐸𝑚𝑎𝑥 is an effic
... Show MoreIn this paper, a computational method for solving optimal problem is presented, using indirect method (spectral methodtechnique) which is based on Boubaker polynomial. By this method the state and the adjoint variables are approximated by Boubaker polynomial with unknown coefficients, thus an optimal control problem is transformed to algebraic equations which can be solved easily, and then the numerical value of the performance index is obtained. Also the operational matrices of differentiation and integration have been deduced for the same polynomial to help solving the problems easier. A numerical example was given to show the applicability and efficiency of the method. Some characteristics of this polynomial which can be used for solvin
... Show MoreGiven the importance of increasing economic openness transport companies’ face various issues arising at present time, this required importing different types of goods with different means of transport. Therefore, these companies pay great attention to reducing total costs of transporting commodities by using numbers means of transport methods from their sources to the destinations. The majority of private companies do not acquire the knowledge of using operations research methods, especially transport models, through which the total costs can be reduced, resulting in the importance and need to solve such a problem. This research presents a proposed method for the sum of Total Costs (Tc) of rows and columns, in order to arrive at the init
... Show More