Risks of Design Stage in Iraqi Construction Project
...Show More Authors

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.

It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of completed project meets those requirements.

Therefore it has been necessary to focus in this paper on the design stage also demonstrated and analysis the most important risk facing this stage and their impact on a construction project by introducing a questionnaire to identify the most important risks factors at this stage affecting on the project.

The paper had been shown that the effect of the design stage on Lump sum type of project contract was higher than the unit price, while the most important factor effect on a project its fast response of design team to prepare the design documents in order to facilitate the workflow and sequence of execution with effect level 3.714.

 

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Apr 09 2018
Journal Name
Al-khwarizmi Engineering Journal
Construction and Evaluation of a Uniaxial Mechanical Actuated Vibration Shaker
...Show More Authors

In the present paper a low cost mechanical vibration shaker of rotating unbalanced type with uniaxial shaking table was designed and constructed in an attempt to provide opportunities for experimental testing and application of vibration in experimental modal analysis, stress relief of weldments, effect of vibration on heat transfer and seismic testing of civil engineering structures. Also, it provides unexpressive solution to enhance the knowledge and technical skills of students in mechanical vibration laboratory. The shaker consists of a five main parts shaker frame, shaker table, flexible support, drive motor, and eccentricity mechanism. The experimental results show that the amplitude of the shaker is increased with increasing the f

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Feb 07 2022
Journal Name
Innovative Infrastructure Solutions
Evaluation of construction and demolition waste recycling sites within Iraq
...Show More Authors

View Publication
Crossref (2)
Clarivate Crossref
Publication Date
Sat Feb 01 2025
Journal Name
Journal Of Engineering
Construction of a General-Purpose Infrastructure for Rfid – Based Applications
...Show More Authors

View Publication
Publication Date
Sun Dec 03 2017
Journal Name
Baghdad Science Journal
Construction and Operation of Solar Energy Dish for Water Heating
...Show More Authors

Construction and operation of (2 m) parabolic solar dish for hot water application were illustrated. The heater was designed to supply hot water up to 100 oC using the clean solar thermal energy. The system includes the design and construction of solar tracking unit in order to increase system performance. Experimental test results, which obtained from clear and sunny day, refer to highly energy-conversion efficiency and promising a well-performed water heating system.

View Publication Preview PDF
Scopus (1)
Scopus Crossref
Publication Date
Mon Mar 07 2022
Journal Name
Construction Research Congress 2022
Annual Revenue’s Influence on the Safety Performance of Construction Firms
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Oct 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
The Impact of Strategic Intelligence In Decision Making Styles An Analytical research in the Construction& Housing ministry
...Show More Authors

            This research aims to explore the impact of strategic  intelligence by his dimensions (Foresight , system thinking, vision, motivation and partnership) on decision making styles which represented by ( rational, intuitive, dependent, Spontaneous and  Avoidant style) for a sample of the administrative leaders in the center of  Reconstruction &Housing Ministry and Some its formations which are companies of (Sa'ad, Al Mansour, al Farouq, Assyria, al-Mu'tasim, al- Rasheed, and Public Authority for Housing).  So to achieve the  research objectives and to test hypotheses, it has been relying

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a

... Show More
View Publication Preview PDF
Publication Date
Sat Nov 03 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Construction of an Initial Assessment Documentation Tool for Nursing Recording System in Coronary Care Units
...Show More Authors

Objective : The study was carried out to construct an initial assessment documentation tool for nursing
recording system in Coronary Care Unit.
Methodology : A descriptive, purposive sample of (65) nurses was selected from CCU of main
teaching hospitals (Al Karama, Al Kindy, Al Kadimia, Al Yarmmok, Baghdad teaching hospital, Ibn
Al Naffis hospital) and Ibn-Al betar hospital in Baghdad city from the 15th of April 2004 to the 15th of
April 2006.
The instrument was constructed and comprised of two sections: section one included the
nurses' demographic characteristic; section two was the initial assessment documentation tool that
contained (2) parts including: General information form and the initial assessment form.

... Show More
View Publication Preview PDF
Publication Date
Tue May 01 2018
Journal Name
Practice Periodical On Structural Design And Construction
Hazards and Risk in Construction and the Impact of Incentives and Rewards on Safety Outcomes
...Show More Authors

View Publication
Scopus (27)
Crossref (21)
Scopus Clarivate Crossref