Irrigation scheduling techniques is one of the suggested solutions for water scarcity problem. The study aims to show the possibility of using practical and applicable irrigation scheduling program which was designed by Water Resources Department at the University of Baghdad by using Spreadsheet Formulas for Microsoft Excel program, version 2007, with some modification to generalize it and made it applicable to various climatic zone and different soil types, as a salvation for the shortage of irrigation water inside the irrigation projects. Irrigation projects which incidence of Tigris River basin will be taken as an applicable example. This program was based on water budgeting and programmed depending on scientific concepts which facilitate irrigation structures operation and ease the use by farmers. By using the abilities of this program, the monthly and annually water requirements and drainage water were estimated. Finally a comparison is made between the calculated discharges with the designers suggested ones. This comparisons showed that the use of this type of irrigation scheduling (i.e. predicted irrigation scheduling) with itsapplicable constrains require high attention when choosing the cropping pattern for each climate zone. Also it found that this irrigation program is a useful tool for saving water if cropping pattern has been chosen carefully.
The present study aimed to investigate the effects of cages of fish farming of Mussayyib district,The fish farming have been selected at Euphrates river with in Mussayyib districtBabylon province the area of study extend 3 Km at the river and includes 541 cages in water with in 46 fish farming . Water samples were taken from 3 stations three times within one month for each two of them were taken from two water purification stations in mussayyib ,physical and chemical examination of water quality were taken ,The results for samples from the fish farming indicated that PH and salinity of water within acceptable levels, high proporation of dissolved oxygen and vital oxygen required were very high while the turbidity was more t
... Show MoreIn this study water quality was indicated in terms of Water Quality Index that was determined through summarizing multiple parameters of water test results. This index offers a useful representation of the overall quality of water for public or any intended use as well as indicating pollution, water quality management and decision making. The application of Water Quality Index (WQI) with sixteen physicochemical water quality parameters was performed to evaluate the quality of Tigris River water for drinking usage. This was done by subjecting the water samples collected from eight stations in Baghdad city during the period 2004-2010 to comprehensive physicochemical analysis. The sixteen physicochemical parameters included: Turbidity,
... Show MoreIn this study water quality was indicated in terms of Water Quality Index that was determined through summarizing multiple parameters of water test results. This index offers a useful representation of the overall quality of water for public or any intended use as well as indicating pollution, water quality management and decision making. The application of Water Quality Index
(WQI) with sixteen physicochemical water quality parameters was performed to evaluate the quality of Tigris River water for drinking usage. This was done by subjecting the water samples collected from eight stations in Baghdad city during the period 2004-2010 to comprehensive physicochemical analysis. The sixteen physicochemical parameters included: Turbidity, A
Through the last decade, Integrated Project Delivery (IPD) methodology considers one of the new contractual relations that are also on the way to further integrate the process of combining design and instruction. On the other hand, Building Information Modeling (BIM) made significant advancements in coordinating the planning and construction processes. It is being used more often in conjunction with traditional delivery methods. In this paper, the researcher will present the achievement of IPD methodology by using BIM through applying on the design of the financial commission building in Mayssan Oil Company in Iraq. The building has not been constructed yet and it was designed by usin
Flow-production systems whose pieces are connected in a row may not have maintenance scheduling procedures fixed because problems occur at different times (electricity plants, cement plants, water desalination plants). Contemporary software and artificial intelligence (AI) technologies are used to fulfill the research objectives by developing a predictive maintenance program. The data of the fifth thermal unit of the power station for the electricity of Al Dora/Baghdad are used in this study. Three stages of research were conducted. First, missing data without temporal sequences were processed. The data were filled using time series hour after hour and the times were filled as system working hours, making the volume of the data relativel
... Show MoreFlexible job-shop scheduling problem (FJSP) is one of the instances in flexible manufacturing systems. It is considered as a very complex to control. Hence generating a control system for this problem domain is difficult. FJSP inherits the job-shop scheduling problem characteristics. It has an additional decision level to the sequencing one which allows the operations to be processed on any machine among a set of available machines at a facility. In this article, we present Artificial Fish Swarm Algorithm with Harmony Search for solving the flexible job shop scheduling problem. It is based on the new harmony improvised from results obtained by artificial fish swarm algorithm. This improvised solution is sent to comparison to an overall best
... Show MoreIn this paper, the effects of subsurface water retention technology (SWRT) on crop coefficient (kc) and crop evapotranspiration (ETc) of eggplant were investigated in sandy loam soil. For this purpose, two treatments plot (with SWRT and without using SWRT) were adopted during 93 days of cultivation. The study was conducted in open field within Al-Fahamah Township, Baghdad, Iraq during summer growing season 2017. The accumulated ETc of eggplant was 403.3 and 515.2 mm for SWRT treatment and control plot, respectively by reduction percentage 21.7 %. The average values of ETc during the growing season were 4.3 and 5.5 mm/day, respectively. The crop coefficients value during the gro
... Show More