Design and construction of video extractor circuit require an understanding of several parameters, which include: Selector circuit, extracting circuit which contains sampling signal and multiplexing. At each radar pulse, the video signal is fed to one of the selector. The fast filter has a pass –band from 190 Hz to 1800 Hz. These frequencies correspond to targets having radial velocities laying between and 10 Kph and 200 Kph.Slow filter: 60 Hz to 230 Hz for radial velocities laying between 3.5 and 13 Kph.The video- extractor is organized in four PCB CG (A-B-C-D) each one having 16 selector. The sampling signal (ADS) (1-2-3-4) control the 4-line-to-16-line decoders. 8 multiplexers of 8 inputs each, are required for the multiplexing of the 64 selectors.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
The Cost of Technology Transfer in Construction Companies (In Iraq)
...Show More Authors

The construction sector is considered an important and influential pivot in the national economy of any country.  Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2012
Journal Name
Conference
Identifying Causes of Variation in Construction Industry Based on Questionnaire
...Show More Authors

Publication Date
Mon Oct 02 2023
Journal Name
Journal Of Engineering
Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Wed Apr 01 2015
Journal Name
Al–bahith Al–a'alami
The Functional Construction of Advertisements in the Iraqi Press Websites
...Show More Authors

Communication and media technologies have seen several changes in the last two decades. These changes put the basis for the emergence of communicative and media practices on several levels including political, economic, technological and artistic. And these, in turn, led to the emergence of new media trends and phenomena in various areas of media worthily to be studied and researched for example online advertisings.                                                                                          Online advert

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Financing Cost Optimization in Construction Sector: A Review
...Show More Authors

The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Professional Safety
How Technology Can Improve OSH Management in Construction
...Show More Authors

Publication Date
Fri Mar 19 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
New cost control techniques in mega construction projects
...Show More Authors

View Publication
Scopus (5)
Crossref (4)
Scopus Crossref
Publication Date
Mon Apr 05 2021
Journal Name
Solid State Technology
Genetic Algorithms in Construction Project Management: A Review
...Show More Authors

Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem

... Show More
View Publication Preview PDF
Publication Date
Fri May 01 2020
Journal Name
Practice Periodical On Structural Design And Construction