Design and construction of video extractor circuit require an understanding of several parameters, which include: Selector circuit, extracting circuit which contains sampling signal and multiplexing. At each radar pulse, the video signal is fed to one of the selector. The fast filter has a pass –band from 190 Hz to 1800 Hz. These frequencies correspond to targets having radial velocities laying between and 10 Kph and 200 Kph.Slow filter: 60 Hz to 230 Hz for radial velocities laying between 3.5 and 13 Kph.The video- extractor is organized in four PCB CG (A-B-C-D) each one having 16 selector. The sampling signal (ADS) (1-2-3-4) control the 4-line-to-16-line decoders. 8 multiplexers of 8 inputs each, are required for the multiplexing of the 64 selectors.
Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreEngineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a
... Show MoreThe purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.
Basketball is a popular game in many parts of the world and many developed countries are making continuous efforts to prepare and develop their emerging players on scientific and clear bases as the basis for reaching high levels The researchers used the descriptive approach in the method of correlative studies to suit the nature of the study The readymade software (IBM SPSS Statistics Version24) was used to perform statistical treatments The researchers concluded that there was a significant relationship between body size indicators (height and weight) with the fitness elements of the emerging basketball players The researchers recommended conducting a similar study to determine the type of relationship to the indicators of the physical str
... Show MoreThe relationship between the vision of the scenario and the director is represented in the second search for new mechanisms and possibilities that possess the direct effect and synonyms of the vision of the scenario, so he works on investing them in achieving his ideas and visions with more effectiveness and flexibility to achieve creative potentials, without resorting to the installations and expressive structures themselves that have exhausted their meaning, and lost their luster due to Its prevalence and familiarity on the one hand, and its activation on the other hand to achieve modernity at the level of aromas, after the director takes a method or approach that has privacy and exclusivity, and based on the foregoing, getting
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen