Design and construction of video extractor circuit require an understanding of several parameters, which include: Selector circuit, extracting circuit which contains sampling signal and multiplexing. At each radar pulse, the video signal is fed to one of the selector. The fast filter has a pass –band from 190 Hz to 1800 Hz. These frequencies correspond to targets having radial velocities laying between and 10 Kph and 200 Kph.Slow filter: 60 Hz to 230 Hz for radial velocities laying between 3.5 and 13 Kph.The video- extractor is organized in four PCB CG (A-B-C-D) each one having 16 selector. The sampling signal (ADS) (1-2-3-4) control the 4-line-to-16-line decoders. 8 multiplexers of 8 inputs each, are required for the multiplexing of the 64 selectors.
The research problem is that most of the construction projects exceed the planned value, due to the failure to implement the plans on time. The current study aims to monitor the implementation of the project and for each of the executed tasks of the table of quantities in order to detect deviations at the time they occur, evaluate the time and cost performance, and then identify the areas of waste and analyze the implementation of each task in order to diagnose the underlying problems and find possible and applicable solutions in the environment Iraqi. The research was applied in one of the companies specialized in the field of construction projects, and one of the most important conclusions reached is the possibility of applying
... Show MoreIn this study, the effect of construction joints on the performance of reinforced concrete beams was experimentally investigated. Seven beam specimens, with dimensions of 200×100×1000 mm, were fabricated. The variables were considered including; the location and configuration of the joints. One beam was cast without a joint (Reference specimen), two specimens were fabricated with a one horizontal joint located either at tension, or compression zone. The fourth
beam had two horizontal joints placed at tension, and compression area. The remaining specimens were with one or two inclined joints positioned at the shear span or beam’s mid-span. The specimens were subjected to a monotonic central concentrated loading until the failure. T
There is a continuous and massive need for newer cephalosporins that should have resistance against β-lactamases and can be used orally. An approach of using cephalexin, as a well-studied and potent antibacterial compound is considered to prepare new designed derivatives. These derivatives include the incorporation of amino acid moiety linked through an amide bond with the α-amino group of cephalexin. Certain aliphatic amino acids were used, such as glycine, alanine, valine and proline. The chemical structures of these derivatives were confirmed by IR spectroscopy and elemental analyses. All the synthesized compounds were subjected for preliminary evaluation of antimicrobial activity using well diffusion method, against certa
... Show MoreVideo copyright protection is the most generally acknowledged method of preventing data piracy. This paper proposes a blind video copyright protection technique based on the Fast Walsh Hadamard Transform (FWHT), Discrete Wavelet Transform (DWT), and Arnold Map. The proposed method chooses only frames with maximum and minimum energy features to host the watermark. It also exploits the advantages of both the fast Walsh Hadamard transform (FWHT) and discrete wavelet transforms (DWT) for watermark embedding. The Arnold map encrypts watermarks before the embedding process and decrypts watermarks after extraction. The results show that the proposed method can achieve a fast embedding time, good transparency, and robustness against various
... Show MoreA Mini-TEA CO2 laser system was designed and operated to obtain a pulse at 10.6 μm. Output energy of 30 mJ, with preionization pins, and pulse duration of 100ns were obtained. While an output energy of 6mJ and pulse duration of 100 ns in absence of pre-ionization were obtained. The system was operated with Ernest profile main-discharge electrodes. Dependencies of supply voltage and output laser energy on the pressure inside laser cavity were investigated as well as dependencies of supply voltage and output energy on the main capacitor(8CO2 : 8N2 : 82He :2CO). Efficiency of was calculated to be 4.4%.
Lately great interests have emerged to find educational alternatives to teach and improve motor skills according to modern educational methods that take into account individual differences and speed in learning for the learner through individual learning that the learner adopts by teaching himself by passing through various educational situations to acquire skills and information in the way he is The learner is the focus of the educational process and among these alternatives the interactive video, the researchers noted through the educational training units at the Model Squash School of the Central Union, and that most of the methods and methods used in learning basic skills take a lot of time in the educational program and do not involve
... Show MoreThis study looks into the many methods that are used in the risk assessment procedure that is used in the construction industry nowadays. As a result of the slow adoption of novel assessment methods, professionals frequently resort to strategies that have previously been validated as being successful. When it comes to risk assessment, having a precise analytical tool that uses the cost of risk as a measurement and draws on the knowledge of professionals could potentially assist bridge the gap between theory and practice. This step will examine relevant literature, sort articles according to their published year, and identify domains and qualities. Consequently, the most significant findings have been presented in a manne
... Show MoreThis research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.
... Show More