Design and construction of video extractor circuit require an understanding of several parameters, which include: Selector circuit, extracting circuit which contains sampling signal and multiplexing. At each radar pulse, the video signal is fed to one of the selector. The fast filter has a pass –band from 190 Hz to 1800 Hz. These frequencies correspond to targets having radial velocities laying between and 10 Kph and 200 Kph.Slow filter: 60 Hz to 230 Hz for radial velocities laying between 3.5 and 13 Kph.The video- extractor is organized in four PCB CG (A-B-C-D) each one having 16 selector. The sampling signal (ADS) (1-2-3-4) control the 4-line-to-16-line decoders. 8 multiplexers of 8 inputs each, are required for the multiplexing of the 64 selectors.
The article includes the concept of aesthetics through what has been dealt with in the literature by philosophers and researchers who have addressed this concept in an attempt to derive indicators of aesthetics. The article adopted a descriptive and analytical methodology by reviewing recent literature on the concept of aesthetics and its relation to urban planning and design issues. Many subjective and objective aesthetics indicators have been identified, some of which are classified under real aesthetics, and some under fake aesthetics. The indicators were applied to the Kufa Mosque complex and Sahla Mosque complex as a comparative case study. It was found that the indicators of real aesthetics have a higher weight in determining
... Show MoreEngineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a
... Show MoreThe purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.
The relationship between the vision of the scenario and the director is represented in the second search for new mechanisms and possibilities that possess the direct effect and synonyms of the vision of the scenario, so he works on investing them in achieving his ideas and visions with more effectiveness and flexibility to achieve creative potentials, without resorting to the installations and expressive structures themselves that have exhausted their meaning, and lost their luster due to Its prevalence and familiarity on the one hand, and its activation on the other hand to achieve modernity at the level of aromas, after the director takes a method or approach that has privacy and exclusivity, and based on the foregoing, getting
... Show MoreBasketball is a popular game in many parts of the world and many developed countries are making continuous efforts to prepare and develop their emerging players on scientific and clear bases as the basis for reaching high levels The researchers used the descriptive approach in the method of correlative studies to suit the nature of the study The readymade software (IBM SPSS Statistics Version24) was used to perform statistical treatments The researchers concluded that there was a significant relationship between body size indicators (height and weight) with the fitness elements of the emerging basketball players The researchers recommended conducting a similar study to determine the type of relationship to the indicators of the physical str
... Show MoreThe formal integration of the interior spaces in general and the commercial spaces of the watch shops in the large commercial centers in particular is the goal that the designers aim to reach in order for the interior space to become successful in terms of the design idea and its characteristics. Implementation mechanism. One of the reasons for achieving formal integration in the interior spaces of watch shops is the requirements of the design that must be available in these spaces to reach a state of formal integration between the interior and the exterior so that the space becomes fully integrated in all respects. Because of the aforementioned reasons for dealing with the research, through four chapters: The first chapter included the
... Show MoreThe interior spaces represent a true reflection of the concepts and values of humanity and requirements; were interested in current research ongoing changes that have occurred in those human values and requirements over time, even pat each time warp its values and its own requirements. Those changes, which receive Bdilalha the spaces linked by a renewal which guarantees the interior design of the spaces of sustainability and bio-coordinated. Launched search from an initial perception that those associated with the changes of the spaces through time that have not been subject to examination and supervision, they will constitute a continuing threat of losing the ties with the past under the pretext of modernization and mo
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show More