Preferred Language
Articles
/
bsj-7716
Almost Projective Semimodules
...Show More Authors

       The basis of this paper is to study the concept of almost projective semimodules as a generalization of projective semimodules. Some of its characteristics have been discussed, as well as some results have been generalized from projective semimodules.

Scopus Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Jan 01 2016
Journal Name
Journal Of The College Of Languages (jcl)
Linguistic contast between bilateral and trilateral roots in Semitics languages (Arabic and Syriac as a model)
...Show More Authors

The present study investigates the relation between the biliteral and triliteral roots which is the introduction to comprehend the nature of the Semitic roots during its early stage of development being unconfirmed to a single pattern. The present research is not meant to decide on the question of the biliteral roots in the Semitic languages, rather it is meant to confirm the predominance of the triliteral roots on these languages which refers, partially, to analogy adopted by the majority of linguists. This tendency is frequently seen in the languages which incline to over generalize the triliteral phenomenon, i. e., to transfer the biliteral roots to the triliteral room, that is, to subject it to the predominant pattern regarding the r

... Show More
View Publication Preview PDF
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Quick Response Manufacturing (QRM) and Impacts on the Scheduling Operations Applied Research in the general company for vegetable oil product/ Al-Farab factory
...Show More Authors

 

He research specifies subjects which may contribute in improve productivity of the General Company for vegetable oil product/ Al-Farab factory and aims to release the relationship between system Quick Response Manufacturing (QRM) and scheduling operations.

The Implementation was in the general company for vegetable oil product (Al-Farab factory), Universe Factory It suffers from a failure to follow Scheduling in its operations And not taking into account the lead times And delays in product delivery dates, Here are drawing the attention of the administration in the factory to use Quick Response Manufacturing (QRM) to control the energy and inventory, machin

... Show More
View Publication Preview PDF
Crossref