The presented study investigated the scheduling regarding jobs on a single machine. Each job will be processed with no interruptions and becomes available for the processing at time 0. The aim is finding a processing order with regard to jobs, minimizing total completion time , total late work , and maximal tardiness which is an NP-hard problem. In the theoretical part of the present work, the mathematical formula for the examined problem will be presented, and a sub-problem of the original problem of minimizing the multi-objective functions is introduced. Also, then the importance regarding the dominance rule (DR) that could be applied to the problem to improve good solutions will be shown. While in the practical part, two exact methods are important; a Branch and Bound algorithm (BAB) and a complete enumeration (CEM) method are applied to solve the three proposed MSP criteria by finding a set of efficient solutions. The experimental results showed that CEM can solve problems for up to jobs. Two approaches of the BAB method were applied: the first approach was BAB without dominance rule (DR), and the BAB method used dominance rules to reduce the number of sequences that need to be considered. Also, this method can solve problems for up to , and the second approach BAB with dominance rule (DR), can solve problems for up to jobs in a reasonable time to find efficient solutions to this problem. In addition, to find good approximate solutions, two heuristic methods for solving the problem are proposed, the first heuristic method can solve up to jobs, while the second heuristic method can solve up to jobs. Practical experiments prove the good performance regarding the two suggested approaches for the original problem. While for a sub-problem the experimental results showed that CEM can solve problems for up to jobs, the BAB without dominance rule (DR) can solve problems for up to , and the second approach BAB with dominance rule (DR), can solve problems for up to jobs in a reasonable time to find efficient solutions to this problem. Finally, the heuristic method can solve up to jobs. Arithmetic results are calculated by coding (programming) algorithms using (MATLAB 2019a)
In the present work usedNd:YAG laser systems of different output characteristic were employed to study the drilling process of material used in scientific and industrial fields. This material include Manganese hard steel. Our study went into the affecting parameters in drilling of Manganese hard steel by laser. Drilling process is achieved through material absorption of part of the incident laser beam. It is the resultant of interfering both, laser beam and material properties and the focusing conditions of the beam. The results as shown that the increase in the laser pulse energy over the used level has raised the hole diameter, depth and increased the hole taper. In addition to that a hole taper was affected by the laser energy, the fo
... Show MoreIn this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.
Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.
Introduction
Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi
... Show MoreDue to the need for controlling and regulating of feed pellet. Pellet that is imported or locally manufactured is accompanied by cracking and crumbling percentage that occur during transporting and distributing to animals, using conveyors and mechanical feeders. This study aimed to determine the effect of particle size and die holes diameter in the machine on broiler feed pellets quality in pellet durability, pellet direct measurement, pellet expansion, and pellet length. Three particle size 2, 4, and 6 mm, and three diameters of die holes in the machine 3, 4, and 5 mm, have been used. The results showed that changing the particle size from 2 to 4 then to 6 mm led to a significant decrease in pellet durability and pellet lengths, pe
... Show MoreThe availability of different processing levels for satellite images makes it important to measure their suitability for classification tasks. This study investigates the impact of the Landsat data processing level on the accuracy of land cover classification using a support vector machine (SVM) classifier. The classification accuracy values of Landsat 8 (LS8) and Landsat 9 (LS9) data at different processing levels vary notably. For LS9, Collection 2 Level 2 (C2L2) achieved the highest accuracy of (86.55%) with the polynomial kernel of the SVM classifier, surpassing the Fast Line-of-Sight Atmospheric Analysis of Spectral Hypercubes (FLAASH) at (85.31%) and Collection 2 Level 1 (C2L1) at (84.93%). The LS8 data exhibits similar behavior. Conv
... Show MoreThe Beggar (1965) is a story of isolation and depression which is written by the Egyptian novelist Naguib Mahfouz who is considered the father of Arabic Literature in the modern era. Specifically, he refers in his great novel called The Beggar that the man unable to achieve psychological revival after Nasser’s revolution, the man sacrificed his own job and his family for a desire that increases his feelings of alienation and depression which leads him to an emotional outcry against the indifferent. The main aim of the study highlights the concept of existential dilemma as a philosophical problem and personality crisis by the protagonist of The Beggar novel, Omer Al-Hamzawi who had acc
... Show MoreThe permeability is the most important parameter that indicates how efficient the reservoir fluids flow through the rock pores to the wellbore. Well-log evaluation and core measurements techniques are typically used to estimate it. In this paper, the permeability has been predicted by using classical and Flow zone indicator methods. A comparison between the two methods shows the superiority of the FZI method correlations, these correlations can be used to estimate permeability in un-cored wells with a good approximation.
Curing of concrete is the maintenance of a satisfactory moisture content and temperature for a
period of time immediately following placing so the desired properties are developed. Accelerated
curing is advantages where early strength gain in concrete is important. The expose of concrete
specimens to the accelerated curing conditions which permit the specimens to develop a significant
portion of their ultimate strength within a period of time (1-2 days), depends on the method of the
curing cycle.Three accelerated curing test methods are adopted in this study. These are warm water,
autogenous and proposed test methods. The results of this study has shown good correlation
between the accelerated strength especially for