Preferred Language
Articles
/
xhedJZIBVTCNdQwCEJ6q
Solving tri-criteria: total completion time, total late work, and maximum earliness by using exact, and heuristic methods on single machine scheduling problem
...Show More Authors

The presented study investigated the scheduling regarding  jobs on a single machine. Each  job will be processed with no interruptions and becomes available for the processing at time 0. The aim is finding a processing order with regard to jobs, minimizing total completion time , total late work , and maximal tardiness  which is an NP-hard problem. In the theoretical part of the present work, the mathematical formula for the examined problem will be presented, and a sub-problem of the original problem of minimizing the multi-objective functions  is introduced. Also, then the importance regarding the dominance rule (DR) that could be applied to the problem to improve good solutions will be shown. While in the practical part, two exact methods are important; a Branch and Bound algorithm (BAB) and a complete enumeration (CEM) method are applied to solve the three proposed MSP criteria by finding a set of efficient solutions. The experimental results showed that CEM can solve problems for up to  jobs. Two approaches of the BAB method were applied: the first approach was BAB without dominance rule (DR), and the BAB method used dominance rules to reduce the number of sequences that need to be considered. Also, this method can solve problems for up to , and the second approach BAB with dominance rule (DR), can solve problems for up to  jobs in a reasonable time to find efficient solutions to this problem. In addition, to find good approximate solutions, two heuristic methods for solving the problem are proposed, the first heuristic method can solve up to  jobs, while the second heuristic method can solve up to  jobs. Practical experiments prove the good performance regarding the two suggested approaches for the original problem. While for a sub-problem the experimental results showed that CEM can solve problems for up to  jobs, the BAB without dominance rule (DR) can solve problems for up to , and the second approach BAB with dominance rule (DR), can solve problems for up to  jobs in a reasonable time to find efficient solutions to this problem. Finally, the heuristic method can solve up to jobs. Arithmetic results are calculated by coding (programming) algorithms using (MATLAB 2019a)  

Scopus Crossref
View Publication
Publication Date
Wed Feb 29 2012
Journal Name
Al-khwarizmi Engineering Journal
Effect of Laser Cutting Methods on Hole Deviation and Surface Integrity
...Show More Authors

In the present work usedNd:YAG laser systems of different output characteristic were employed to study the drilling process of material used in scientific and industrial fields. This material include Manganese hard steel. Our study went into the affecting parameters in drilling of Manganese hard steel by laser. Drilling process is achieved through material absorption of part of the incident laser beam. It is the resultant of interfering both, laser beam and material properties and the focusing conditions of the beam. The results as shown that the increase in the laser pulse energy over the used level has raised the hole diameter, depth and increased the hole taper. In addition to that a hole taper was affected by the laser energy, the fo

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling Critical Activities of Stochastic Projects Management
...Show More Authors

In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.

Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.    

Introduction

   Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Dec 31 2023
Journal Name
Iraqi Journal Of Market Research And Consumer Protection
EFFECT OF PARTICLE SIZE AND DIE HOLES DIAMETER IN THE MACHINE ON BROILER FEED PELLETS QUALITY
...Show More Authors

Due to the need for controlling and regulating of feed pellet. Pellet that is imported or locally manufactured is accompanied by cracking and crumbling percentage that occur during transporting and distributing to animals, using conveyors and mechanical feeders. This study aimed to determine the effect of particle size and die holes diameter in the machine on broiler feed pellets quality in pellet durability, pellet direct measurement, pellet expansion, and pellet length. Three particle size 2, 4, and 6 mm, and three diameters of die holes in the machine 3, 4, and 5 mm, have been used. The results showed that changing the particle size from 2 to 4 then to 6 mm led to a significant decrease in pellet durability and pellet lengths, pe

... Show More
View Publication
Crossref
Publication Date
Mon Jan 20 2025
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Assessing Landsat Processing Levels and Support Vector Machine Classification
...Show More Authors

The availability of different processing levels for satellite images makes it important to measure their suitability for classification tasks. This study investigates the impact of the Landsat data processing level on the accuracy of land cover classification using a support vector machine (SVM) classifier. The classification accuracy values of Landsat 8 (LS8) and Landsat 9 (LS9) data at different processing levels vary notably. For LS9, Collection 2 Level 2 (C2L2) achieved the highest accuracy of (86.55%) with the polynomial kernel of the SVM classifier, surpassing the Fast Line-of-Sight Atmospheric Analysis of Spectral Hypercubes (FLAASH) at (85.31%) and Collection 2 Level 1 (C2L1) at (84.93%). The LS8 data exhibits similar behavior. Conv

... Show More
View Publication
Publication Date
Mon Jan 01 2024
Journal Name
Results In Nonlinear Analysis
Numerical solutions for the time fractional Black-Scholes model governing European option by using double integral transform decomposition method
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Fri Jan 01 2021
Journal Name
International Journal Of Nonlinear Analysis And Applications
Big data analysis by using one covariate at a time multiple testing (Ocmt) method: Early school dropout in iraq
...Show More Authors

Scopus (7)
Scopus
Publication Date
Wed Jun 01 2022
Journal Name
Journal Of The College Of Languages (jcl)
The Existential Dilemma as a Philosophical Problem in The Beggar by Naguib Mahfouz
...Show More Authors

     The Beggar (1965) is a story of isolation and depression which is written by the Egyptian novelist Naguib Mahfouz who is considered the father of Arabic Literature in the modern era. Specifically, he refers in his great novel called The Beggar that the man unable to achieve psychological revival after Nasser’s revolution, the man sacrificed his own job and his family for a desire that increases his feelings of alienation and depression which leads him to an emotional outcry against the indifferent. The main aim of the study highlights the concept of existential dilemma as a philosophical problem and personality crisis by the protagonist of The Beggar novel, Omer Al-Hamzawi who had acc

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Sep 30 2017
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Permeability Prediction By Classical and Flow Zone Indictor (FZI) Methods for an Iraqi Gas Field
...Show More Authors

The permeability is the most important parameter that indicates how efficient the reservoir fluids flow through the rock pores to the wellbore. Well-log evaluation and core measurements techniques are typically used to estimate it. In this paper, the permeability has been predicted by using classical and Flow zone indicator methods. A comparison between the two methods shows the superiority of the FZI method correlations, these correlations can be used to estimate permeability in un-cored wells with a good approximation.

View Publication Preview PDF
Publication Date
Thu Dec 01 2011
Journal Name
Journal Of Engineering
ESTIMATION THE 7 AND 28- DAY NORMAL COMPRESSIVE STRENGTH BY ACCELERATED TEST METHODS IN CONCRETE
...Show More Authors

Curing of concrete is the maintenance of a satisfactory moisture content and temperature for a
period of time immediately following placing so the desired properties are developed. Accelerated
curing is advantages where early strength gain in concrete is important. The expose of concrete
specimens to the accelerated curing conditions which permit the specimens to develop a significant
portion of their ultimate strength within a period of time (1-2 days), depends on the method of the
curing cycle.Three accelerated curing test methods are adopted in this study. These are warm water,
autogenous and proposed test methods. The results of this study has shown good correlation
between the accelerated strength especially for

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Tue May 21 2019
Journal Name
The Journal Of Engineering
Performance of a tubular machine driven by an external‐combustion free‐piston engine
...Show More Authors

Crossref (2)
Clarivate Crossref