The presented study investigated the scheduling regarding jobs on a single machine. Each job will be processed with no interruptions and becomes available for the processing at time 0. The aim is finding a processing order with regard to jobs, minimizing total completion time , total late work , and maximal tardiness which is an NP-hard problem. In the theoretical part of the present work, the mathematical formula for the examined problem will be presented, and a sub-problem of the original problem of minimizing the multi-objective functions is introduced. Also, then the importance regarding the dominance rule (DR) that could be applied to the problem to improve good solutions will be shown. While in the practical part, two exact methods are important; a Branch and Bound algorithm (BAB) and a complete enumeration (CEM) method are applied to solve the three proposed MSP criteria by finding a set of efficient solutions. The experimental results showed that CEM can solve problems for up to jobs. Two approaches of the BAB method were applied: the first approach was BAB without dominance rule (DR), and the BAB method used dominance rules to reduce the number of sequences that need to be considered. Also, this method can solve problems for up to , and the second approach BAB with dominance rule (DR), can solve problems for up to jobs in a reasonable time to find efficient solutions to this problem. In addition, to find good approximate solutions, two heuristic methods for solving the problem are proposed, the first heuristic method can solve up to jobs, while the second heuristic method can solve up to jobs. Practical experiments prove the good performance regarding the two suggested approaches for the original problem. While for a sub-problem the experimental results showed that CEM can solve problems for up to jobs, the BAB without dominance rule (DR) can solve problems for up to , and the second approach BAB with dominance rule (DR), can solve problems for up to jobs in a reasonable time to find efficient solutions to this problem. Finally, the heuristic method can solve up to jobs. Arithmetic results are calculated by coding (programming) algorithms using (MATLAB 2019a)
Quality is the key to success in today's world, which is based mainly on competition in the provision of high quality services through the application of the modern management method which is called total quality management in organizations. This includes describing the provision of health services and satisfaction of patients . .  
... Show MoreThe research aims to determine the role of functional alienation and its impact on Job Satisfaction in General Motors Company, that were selected to apply the field side being an important company in Iraq, the problem was research with difficulty in employees adapt and their sense of alienation in their work which is reflected negatively on the level of satisfaction with work in company searched. A questionnaire was adopted as the main tool for data collection research which included (31) items distributed on (50) employees in the company selected, on a randomly chosen and based on the statistical program ready by (SPSS). Sample of this study was the most important findings of the research are the weak management of the company i
... Show MoreThis study was designed to evaluate the role of single session autologous facial fat grafting in correcting facial asymmetries after mixing it with platelet-rich fibrin (PRF) and injecting them into rich vascular facial muscular plane.
Fifteen patients (12 females and 3 males) with age ranging from 18 years to 40 years were included in this study and followed up during 6 months, all the patients were treated in the Al-Shaheed Ghazi Al-Hariri for specialized surgeries hospital (Medical City, Baghdad, Iraq).
Auto
To determine the potential of gingival crevicular fluid (GCF) volume, E‐cadherin and total antioxidant capacity (TAC) levels to predict the outcomes of nonsurgical periodontal therapy (NSPT) for periodontitis patients.
NSPT is the gold‐standard treatment for periodontal pockets < 6 mm in depth, however, successful outcomes are not always guaranteed due to several factors. Periodontitis‐associated tissue destruction is evidenced by the increased level of soluble E‐cadherin and reduced antioxidants in oral fluids which could be used as predictors for success/failure of N
This study investigates the requirements of total quality management (TQM) and the determinants affecting its application in Al-Zaman newspaper, one of Iraq’s leading private press institutions. The research employed a survey methodology, using a structured questionnaire administered to 30 participants representing journalistic, administrative, and technical staff. Five TQM dimensions, each measured through four indicators, were assessed to capture the perceptions of employees regarding the availability and effectiveness of quality practices. Data were analyzed using the Statistical Package for the Social Sciences (SPSS). The results revealed that while senior management at Al-Zaman demonstrates formal support for TQM, there is a
... Show MoreBack ground: Chronic total occlusion (CTO) of coronary arteries remains one of the most challenging lesion subsets in interventional cardiology even with the development of medical devices and operator expertise. Successful revascularization results in improved in angina status ,increased exercise capacity and reduces the need for lat CABG surgery .
Objectives: This study sought to determine the overall procedural success rate of percutaneous coronary intervention (PCI) for CTOs and to examine the relation between variables such as; patients’ characteristics, risk factors, lesion characteristics and procedural success rate.
Methods: In this study ,clinical and coronary angiography data of (80) patients with CTO who underwent PCI
This paper introduces a relation between resultant and the Jacobian determinant
by generalizing Sakkalis theorem from two polynomials in two variables to the case of (n) polynomials in (n) variables. This leads us to study the results of the type: , and use this relation to attack the Jacobian problem. The last section shows our contribution to proving the conjecture.
Tin oxide was deposited by using vacuum thermal method on silicon wafer engraved by Computer Numerical Controlled (CNC) Machine. The inscription was engraved by diamond-made brine. Deep 0.05 mm in the form of concentric squares. Electrical results in the dark were shown high value of forward current and the high value of the detection factor from 6.42 before engraving to 10.41 after engraving. (I-V) characters in illumination with powers (50, 100, 150, 200, 250) mW/cm2 show Improved properties of the detector, Especially at power (150, 200, 250) mW/cm2. Response improved in rise time from 2.4 μs to 0.72 μs and time of inactivity improved 515.2 μs to 44.2 μs. Sensitivity angle increased at zone from 40o to 65o.
Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent