The Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After that, a survey occurs in two sessions an open and closed questionnaire. The results were analyzed, and their mean, standard deviation, Cronbach's Alpha and developed weight will be found. The second part clears the method of linking these factors with BIM in order to assess the constructability in two different designs’ projects and find their cost. The method applies through a case study of an educational building located in Baghdad, Iraq; Rivet and Microsoft Excel programs are used in this paper. the result approves the success of using BIM technology to assess the constructability of a project in Iraq. Also, it shows how project cost will be affected when applying constructability factors.
Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a
... Show MoreThe management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.
It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co
... Show MoreThe purpose of this paper is to develop a hybrid conceptual model for building information modelling (BIM) adoption in facilities management (FM) through the integration of the technology task fit (TTF) and the unified theory of acceptance and use of technology (UTAUT) theories. The study also aims to identify the influence factors of BIM adoption and usage in FM and identify gaps in the existing literature and to provide a holistic picture of recent research in technology acceptance and adoption in the construction industry and FM sector.
Applying the constructability concept in the construction industry has proven many benefits in different projects; however, this concept still lacks usage in Iraq. Therefore, it is important to encourage usage of the constructability concept in the construction industry in Iraq. The main purpose of this study is to investigate the factors that affect constructability in Iraq and then classify them according to their importance. A total of 37 factors were collected from an intensive literature review, and they were classified under the sub and main categories. A survey was undertaken in two sessions with open questionnaire and close questionnaire. The results were analysed and the mean
The origin of this technique lies in the analysis of François Kenai (1694-1774), the leader of the School of Naturalists, presented in Tableau Economique. This method was developed by Karl Marx in his analysis of the Departmental Relationships and the nature of these relations in the models of " "He said. The current picture of this type of economic analysis is credited to the Russian economist Vasily Leontif. This analytical model is commonly used in developing economic plans in developing countries (p. 1, p. 86). There are several types of input and output models, such as static model, mobile model, regional models, and so on. However, this research will be confined to the open-ended model, which found areas in practical application.
... Show MoreThe theatre costume with the rest of the theatre show elements constitute a system of the meaning relations that produce a visual image that helps the recipient to decipher the theatre scene, let alone the manifestation of time in its levels (past, present, future) through the design construction of the theatre elements among which is the theatre costume. In order to know the way of manifesting time through the formulation of the theatre costumes, the research question has been put as follows: how to manifest time through the design construction for the theatre costumes unit, from which the research objective is derived as follows: Revealing the possibility of the designing unit of the costumes in manifesting the levels of time wit
... Show MoreThis work involves the calculation of the cooling load in Iraqi building constructions taking in account the effect of the convective heat transfer inside the buildings. ASHRAE assumptions are compared with the Fisher and Pedersen model of estimation of internal convective heat transfer coefficient when the high rate of ventilation from ceiling inlet configuration is used. Theoretical calculation of cooling load using the Radiant Time Series Method (RTSM) is implemented on the actual tested spaces. Also the theoretical calculated cooling loads are experimentally compared by measuring the cooling load in these tested spaces. The comparison appears that using the modified Fisher and Pedersen model when large ventilation ra
... Show MoreA digital elevation model (DEM) is a digital representation of ground surface
topography or terrain. It can be represented as a raster (a grid of squares) and it is
commonly estimated by utilizing remote sensing techniques, or from land surveying.
In this research a 3D building of Baghdad university campus have been performed
using DEM, where the easting, northing, and elevation of 400 locations have been
obtained by field survey using global positioning system (GPS). The image of the
investigated area has been extracted from QuickBird satellite sensor (with spatial
resolution of 0.6 m). This image has been geo-referenced by selecting ground
control points of the GPS. The rectification is running, using 1st order