Using modified earned value for cost control in construction projects

Scopus
Publication Date
Fri Mar 19 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Scopus (3)
Crossref (1)
Scopus Crossref
View Publication
Publication Date
Mon Dec 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Using Earned Value Method in Project Control Applied research

   There is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.

Earned Value Method is used in the project o

... Show More
Crossref
View Publication Preview PDF
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology & Applied Science Research
Investigating the Causes of Poor Cost Control in Iraqi Construction Projects

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat

... Show More
Crossref (6)
Crossref
View Publication
Publication Date
Tue Nov 09 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The role of integration between the earned value management model and the value flow map in rationalizing the costs of construction projects: applied research in Al-Rasheed General Company for Construction Contracting

The research problem is that most of the construction projects exceed the planned value, due to the failure to implement the plans on time. The current study aims to monitor the implementation of the project and for each of the executed tasks of the table of quantities in order to detect deviations at the time they occur, evaluate the time and cost performance, and then identify the areas of waste and analyze the implementation of each task in order to diagnose the underlying problems and find possible and applicable solutions in the environment Iraqi. The research was applied in one of the companies specialized in the field of construction projects, and one of the most important conclusions reached is the possibility of applying

... Show More
View Publication Preview PDF
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc

... Show More
Crossref (2)
Crossref
View Publication Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Archives Of Civil Engineeringthis Link Is Disabled
Scopus (3)
Scopus
Publication Date
Sun May 02 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The effect of applying lean construction tools to improving the results of the earned value management model: Applied research in Al-Rasheed General Company for Construction Contracting

Contracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag

... Show More
View Publication Preview PDF
Publication Date
Sun Jan 01 2023
Journal Name
Organization, Technology And Management In Construction: An International Journal
Using the ordinal priority approach for selecting the contractor in construction projects
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul</p> ... Show More
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
View Publication
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
Crossref (6)
Crossref
View Publication Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Time and finance optimization model for multiple construction projects using genetic algorithm
Abstract<p>Construction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w</p> ... Show More
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref