Using Earned Value Method in Project Control Applied research
...Show More Authors

   There is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.

Earned Value Method is used in the project of building of Superior Judgment Council which executed by Al Mansour Company of construction contracts, long for about three years from 2010 to 2011 .Schedule of planned value, actual cost, and earned value have done to reach the control indices of Earned Value Method that are; Cost Variance, Cost Performance Index, Schedule Variance, Schedule Performance Index. Then monitor and analysis the performance of the project in aspect of cost and time ,thus the control of cost and time integrated to achieve the goals of project management .The study has reached several conclusions such as:

In Al Mansour Company the cost control separated from time control of the project. The estimated cost and time have to be accurate in using  Earned Value Method , and it's important to identify the percentage of executing work accurately .So as the results of control indices would be correct.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun May 02 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The effect of applying lean construction tools to improving the results of the earned value management model: Applied research in Al-Rasheed General Company for Construction Contracting
...Show More Authors

Contracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag

... Show More
View Publication Preview PDF
Publication Date
Wed Jan 01 2020
Journal Name
Periodicals Of Engineering And Natural Sciences
Using modified earned value for cost control in construction projects
...Show More Authors

Scopus (7)
Scopus
Publication Date
Thu Oct 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
Project Scheduling By using Goals Programming – An Applied Research In Modern Village Project (Residential Building Aspectin In Wasit Governorate)
...Show More Authors

One of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit  governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building pro

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Feb 18 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Evaluation of Proceedings External Oversight on Investment Budget Projects for local Governments: "Applied Research in The Government of The Province of Dhi Qar local"
...Show More Authors

The investment budget represents a stage of the investment decision in service units, and the preparation and implementation needs to be a complement of the same planning part, because the planning does not end with the development of the plan, but includes a follow-up implementation, so it has to be effective and efficient oversight of the estimates and procedures for disbursement of funds approved for investment projects, The problem with research in that local governments suffer from the presence of Allkaat and problems facing the implementation of the investment budget projects due to the adoption budget items which can not be measured the efficiency of the performance of these units of government by, and shortcomings in the control

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Nov 27 2022
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The effect of value stream costs in rationalizing quality costs: applied research in taji mill
...Show More Authors

The research aims to study the importance of applying lean accounting techniques and the tools and methods they contain, the most important of which is the “value path costs” technique and its impact on rationalizing and controlling costs, as well as reducing production costs in general and reducing quality costs in a way Special by reducing or eliminating waste and waste in both time and resources and meeting customer requirements. In order to achieve this goal, the researcher relied on the application of lean accounting tools by obtaining data related to the mill, in addition to that, the information obtained as a result of field coexistence in the mill and being able to view the records of the mill in the research sample. From the

... Show More
View Publication Preview PDF
Publication Date
Thu Feb 24 2022
Journal Name
Journal Of Educational And Psychological Researches
The Effect of using Project - Based Learning method in development intensive reading skills at middle school students
...Show More Authors

The purpose of this research is to identify the effect of the use of project-based learning in the development of intensive reading skills at middle school students. The experimental design was chosen from one group to suit the nature of the research and its objectives. The research group consisted of 35 students. For the purpose of the research, the following materials and tools were prepared: (List of intensive reading skills, intensive reading skills test, teacher's guide, student book). The results of the study showed that there were statistically significant differences at (0.05) in favor of the post-test performance of intensive reading skills. The statistical analysis also showed that the project-based learning approach has a high

... Show More
View Publication Preview PDF
Publication Date
Sun Mar 01 2009
Journal Name
Journal Of Economics And Administrative Sciences
Use the method of parsing anomalous valueIn estimating the character parameter
...Show More Authors

In this paper the method of singular value decomposition  is used to estimate the ridge parameter of ridge regression estimator which is an alternative to ordinary least squares estimator when the general linear regression model suffer from near multicollinearity.

View Publication Preview PDF
Crossref
Publication Date
Sat Mar 26 2022
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Applying Total Value Management to Improve Process Design: An Applied Research in the General Company of Food Industry –Al Mammon Factory
...Show More Authors

The aim of this research is to apply the concept of total value management to improve the process design of producing the toothpaste in Al Mammon factory one of the in the general company of food industry. The concept of total value management is concerning with achieve more than one values which are important for the customers as these values are related to the customers satisfaction. The research problem is that the factory did not measure the effectiveness of process design as this company has weakness in analyzing this effectiveness in synchronies with total value management. On the other side, the company did not give more attention to the cost of products and selling prices within the value cost/ profit which is one of the

... Show More
View Publication Preview PDF
Publication Date
Wed Nov 01 2017
Journal Name
Journal Of Economics And Administrative Sciences
Estimate missing value by use analyses of covariance method for split block-design
...Show More Authors

The research aims to estimate missing values using covariance analysis method Coons way to the variable response or dependent variable that represents the main character studied in a type of multi-factor designs experiments called split block-design (SBED) so as to increase the accuracy of the analysis results and the accuracy of statistical tests based on this type of designs. as it was noted in the theoretical aspect to the design of dissident sectors and statistical analysis have to analyze the variation in the experience of experiment )SBED) and the use of covariance way coons analysis according to two methods to estimate the missing value, either in the practical side of it has been implemented field experiment wheat crop in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (4)
Crossref