Comparing the Design Alternatives Using Building Information Model (BIM) and Constructability in Iraqi Construction Projects
...Show More Authors

The Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After that, a survey occurs in two sessions an open and closed questionnaire. The results were analyzed, and their mean, standard deviation, Cronbach's Alpha and developed weight will be found. The second part clears the method of linking these factors with BIM in order to assess the constructability in two different designs’ projects and find their cost. The method applies through a case study of an educational building located in Baghdad, Iraq; Rivet and Microsoft Excel programs are used in this paper. the result approves the success of using BIM technology to assess the constructability of a project in Iraq. Also, it shows how project cost will be affected when applying constructability factors.

Scopus Crossref
View Publication
Publication Date
Fri Sep 11 2020
Journal Name
Iop Conference Series: Materials Science And Engineering
Application of Nanotechnology in Iraqi Construction Projects
...Show More Authors

View Publication
Scopus (4)
Crossref (3)
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying The Decision-Making State and Impact in Iraqi Construction Projects
...Show More Authors

View Publication
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying the decision-making state and impact in Iraqi construction projects
...Show More Authors

View Publication
Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology & Applied Science Research
Investigating the Causes of Poor Cost Control in Iraqi Construction Projects
...Show More Authors

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat

... Show More
View Publication
Crossref (6)
Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Journal Of Engineering
Significant Safety Factors Affecting the Safety Performance in Iraqi Construction Projects
...Show More Authors

Despite recent attempts to improve safety in the construction sector, this sector is considered dangerous and unsafe. Iraq is one of the emerging nations that suffers from a lack of construction safety management. In 2018, the construction sector in Iraq was responsible for 38% of all industrial accidents. Creating a safety program minimizes this problem by making safety an intrinsic part of construction projects. As a result, this article aims to identify the crucial safety factors that affect the safety performance in Iraqi construction projects. After conducting a critical literature review of the related literature, a list of 35 sub-factors classified into nine categories of main factors was chosen to rank each facto

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Application of Geographic Information System for Preparing the Bill of Quantities of Construction Projects
...Show More Authors

The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Mar 16 2022
Journal Name
2022 Muthanna International Conference On Engineering Science And Technology (micest)
Virtual Performance Evaluation of Net-Zero Energy Building (NZEB) Using BIM Analysis
...Show More Authors

View Publication
Scopus (3)
Crossref (2)
Scopus Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Organization, Technology And Management In Construction: An International Journal
Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul</p> ... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (3)
Clarivate Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects
...Show More Authors

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc