The designer must find the optimum match between the object's technical and economic needs and the performance and production requirements of the various material options when choosing material for an engineering application. This study proposes an integrated (hybrid) strategy for selecting the optimal material for an engineering design depending on design requirements. The primary objective is to determine the best candidate material for the drone wings based on Ashby's performance indices and then rank the result using a grey relational technique with the entropy weight method. Aluminum alloys, titanium alloys, composites, and wood have been suggested as suitable materials for manufacturing drone wings. The requirement
... Show MoreThis study was aimed to investigat integrated system for in vitro growth of paulownia plants by assessing the efficacy of chlorine dioxide (ClO2) as an alternative to autoclave in sterilizing culture medium. Therefore, this study was devised to compare autoclave sterilization at three different times (5, 10, and 15) minutes and three different concentrations of ClO2 (0, 0.4, 0,8, 1) mg/L. The results showed that, compared with (0.4) mg/L concentration, concentrations of (0.8 and 1) mg/L are more effective at sterilizing the culture medium. ClO2 sterilization improved individual single node growth more than autoclave sterilization. Since ClO2 is non-toxic, it could be used as a safe alternative to autoclave when propagating paulown
... Show MoreIn this paper, a new equivalent lumped parameter model is proposed for describing the vibration of beams under the moving load effect. Also, an analytical formula for calculating such vibration for low-speed loads is presented. Furthermore, a MATLAB/Simulink model is introduced to give a simple and accurate solution that can be used to design beams subjected to any moving loads, i.e., loads of any magnitude and speed. In general, the proposed Simulink model can be used much easier than the alternative FEM software, which is usually used in designing such beams. The obtained results from the analytical formula and the proposed Simulink model were compared with those obtained from Ansys R19.0, and very good agreement has been shown. I
... Show MoreBACKGROUND: Mental health problems are reflected and linked to human behavior in many aspects. Medical students are susceptible to a wide variety of events that compromise their mental well-being, social life as well as their academic achievements. AIM: This study aimed to find the impact of social support on medical students’ behavior in Iraq via assessing their depression, anxiety, and stress status. METHODS: A cross-sectional online survey-based study targeted all medical students in Iraq. The employed questionnaires covered mental health status of participants by evaluating their perceptions of depression, anxiety, and stress using. Data were analyzed using the Statistical Analysis System. RESULTS: The study revealed a signifi
... Show MoreThe availability of different processing levels for satellite images makes it important to measure their suitability for classification tasks. This study investigates the impact of the Landsat data processing level on the accuracy of land cover classification using a support vector machine (SVM) classifier. The classification accuracy values of Landsat 8 (LS8) and Landsat 9 (LS9) data at different processing levels vary notably. For LS9, Collection 2 Level 2 (C2L2) achieved the highest accuracy of (86.55%) with the polynomial kernel of the SVM classifier, surpassing the Fast Line-of-Sight Atmospheric Analysis of Spectral Hypercubes (FLAASH) at (85.31%) and Collection 2 Level 1 (C2L1) at (84.93%). The LS8 data exhibits similar behavior. Conv
... Show MoreThe implementation of the concept of project scheduling in the organizations generally requires a set of procedures and requirements, So, most important of all is the understanding and knowledge of the tools and techniques which are called the methods of scheduling projects. Consequently, the projects of the municipality administration in the holy governorate of Karbala suffer from the problem of delaying their projects and chaos in the ways of implementation. To provide assistance to this directorate and to demonstrate how to schedule projects using one of the advanced scientific methods that proved their ability to schedule any project and its potential to accelerate the time of completion, as well as ease of use and effectiven
... Show MoreScheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show More