The tourism services provided in the hotel organizations are a set of material and moral elements that represent tourist attractions that are offered to the guests in order to satisfy their needs and desires are accommodation, food, drink and other facilities to reach the satisfaction and satisfaction of guests.Where these tourist services need a mechanism to ensure their quality by working to identify and calculate the costs of these services properly and accurately with the attempt to referendum and reduce the waste and loss to reduce these costs while providing the finest types of tourism services by calculating the cost of production and the administration seeks to reduce Non-essential activities through hotel activities that add value and where the guest is willing to pay and this activity cannot be canceled because it affects the quality of tourist services.The second axis tackled the concepts of quality costs, levels, types and methods of determining them. The third axis dealt with the relationship between quality control and cost reduction. The fourth axis dealt with the characteristics of the quality, Tourism services, and in the fifth poplar was presented the most important conclusions and recommendations reached by the researchers
Agile methodologies are adopted extensively by many of the software industries as it is flexible in nature as well as can address the required changes in any phase of development. Authentic estimation of the software products is not an easy task as it requires continuous attention of the product owner. Effort and cost can be estimated in a proper manner to ensure the success of the project. In this article, we considered the Scrum-based Agile projects that are developed into several Sprints. We proposed an extension to an existing algorithm, based on a total of 36 success factors; that estimate the development cost and effort required to complete the project. For estimation and computations, we have taken a dataset of 12 project
... Show MoreVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
The disposal of the waste material is the main goal of this investigation by transformation to high-fineness powder and producing self-consolidation concrete (SCC) with less cost and more eco-friendly by reducing the cement weight, taking into consideration the fresh and strength properties. The reference mix design was prepared by adopting the European guide. Five waste materials (clay brick, ceramic, granite tiles, marble tiles, and thermostone blocks) were converted to high-fine particle size distribution and then used as 5, 10, and 15% weight replacements of cement. The improvement in strength properties is more significant when using clay bricks compared to other activated waste
A high sensitivity, low power and low cost sensor has been developed for photoplethysmography (PPG) measurement. The PPG principle was applied to follow the dilatation and contraction of skin blood vessels during the cardiac cycle. A standard light emitting diodes (LEDs) has been used as a light emitter and detector, and in order to reduce the space, cost and power, the classical analogue-to-digital converters (ADCs) replaced by the pulse-based signal conversion techniques. A general purpose microcontroller has been used for the implementation of measurement protocol. The proposed approach leads to better spectral sensitivity, increased resolution, reduction in cost, dimensions and power consumption. The basic sensing configuration prese
... Show MoreThe disposal of the waste material is the main goal of this investigation by transformation to high-fineness powder and producing self-consolidation concrete (SCC) with less cost and more eco-friendly by reducing the cement weight, taking into consideration the fresh and strength properties. The reference mix design was prepared by adopting the European guide. Five waste materials (clay brick, ceramic, granite tiles, marble tiles, and thermostone blocks) were converted to high-fine particle size distribution and then used as 5, 10, and 15% weight replacements of cement. The improvement in strength properties is more significant when using clay bricks compared to other activated waste
The research aimed to modeling a structural equation for tourist attraction factors in Asir Region. The research population is the people in the region, and a simple random sample of 332 individuals were selected. The factor analysis as a reliable statistical method in this phenomenon was used to modeling and testing the structural model of tourism, and analyzing the data by using SPSS and AMOS statistical computerized programs. The study reached a number of results, the most important of them are: the tourist attraction factors model consists of five factors which explain 69.3% of the total variance. These are: the provision of tourist services, social and historic factors, mountains, weather and natural parks. And the differenc
... Show MoreA numerical and experimentally investigation for two types of winglets (spiroid and blended), which are used to reduce the induced drag caused by the trailing vortices were presented and discussed in this work. The SOLIDWORK 2016 was used to model a rectangular wing geometry of NACA2415 cross-sectional airfoil with blended and spiroid airfoils (2415 and 0012). The steady, incompressible N.S equations with standard (
This research provides a study of the virtual museums features and characteristics and contributes to the recognition of the diversity of visual presentation methods, as the virtual museums give the act of participation and visual communication with programs at an open time, so that it would contribute to reflection, thinking and recording notes, developing the actual and innovative skills through seeing the environments. The study has been divided into two sections the first one is virtual museum techniques. The techniques were studied to reach the public and are used remotely by the services of personal computers or smart phones being virtual libraries that store images and information that was formed and built in a digital way and how
... Show More