The Karolinka earth-fill dam was constructed between 1977 and 1984 on the Stanovnice river above the town of Karolinka in the region of Vsetínsko in Czech Republic. Because of leakage on the downstream dam face due to technological indiscipline when filling dam layers during the dam construction stage, there were some steps to improve state dam safety. The final rehabilitation is to construct the diaphragm walls from self-hardening cement-bentonite suspension along the length of the dam. In addition to connecting the gallery and abutment (2 × 25 m long) by using jet piles. The article presents numerical modeling of safety factor evaluation associated with the state of the dam body and foundation; before, and after sealing. Also, studying the effect of dam height on its stability by using finite element method is performed by the Plaxis 3D program in the case study of Karolinka dam. It is concluded that measured data shows good agreement with the computed result.
Accurate computation of the roughness coefficient is important in the studies of open channel flow. To measure and identify the hydraulic characteristics of the flow system, the model simulation is necessary to study and get the results of the hydraulic properties to specify Manning coefficient of the Euphrates River. In this study, the reach is extended along the Euphrates River from Haditha Dam to Ramadi Barrage with a distance of 169km. The HEC-RAS model was implemented to simulate the flow within the study reach. The geometry of the river was represented by more than two hundred cross-sections surveyed in 2013 and 2021. The model was calibrated using some observed discharges at the Heet gage station for records of th
... Show MoreDiverting river flow during construction of a main dam involves the construction of cofferdams, and tunnels, channels or other temporary passages. Diversion channels are commonly used in wide valleys where the high flow makes tunnels or culverts uneconomic. The diversion works must form part of the overall project design since it will have a major impact on its cost, as well as on the design, construction program and overall cost of the permanent works. Construction costs contain of excavation, lining of the channel, and construction of upstream and downstream cofferdams. The optimization model was applied to obtain optimalchannel cross section, height of upstream cofferdam, and height of downstream cofferdamwith minimum construction cost
... Show MoreThis research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing i
... Show MoreThis research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing it with anothe
... Show MoreFloods caused by dam failures can cause huge losses of life and property, especially in estuarine areas and valleys. In spite of all the capabilities and great improvements reached by man in the construction of dams and their structures, they will remain helpless before the powerful forces of nature, especially those related to tectonic activation, and the occurrence of earthquakes of different intensities.
The region extending from the Ilisu Dam in Turkey to the Mosul Dam in Iraq was chosen as an area for this study, and the HEC-RAS application was used to simulate the collapse of the Ilisu Dam due to a major earthquake, to know the magnitude of the risks and losses that could result
A total of 48 experiments were conducted to investigate the impact of slit weir dimensions and locations on the maximum scour depth and scour area created upstream. The slit weir model was a 110 mm slit opening, and it was installed at the end of the working section in a laboratory flume. The flume was 10.0 m long, 30 cm wide, 30 cm deep, and almost middle. It includes a 2 m working section with a mobile bed with 110 mm in thickness. In the mobile bed, two types of nonuniform sand (with a geometric standard deviation of 1.58 and 1.6) were tested separately. The weir dimensions and location were changed with flow rates. Then dimensions of the slit weir were changed from 60 x 110 mm to 60 x 70 mm (width x height), while th
... Show MoreThis paper presents a three-dimensional Dynamic analysis of a rockfill dam with different foundation depths by considering the dam connection with both the reservoir bed and water. ANSYS was used to develop the three-dimensional Finite Element (FE) model of the rockfill dam. The essential objective of this study is the discussion of the effects of different foundation depths on the Dynamic behaviour of an embanked dam. Four foundation depths were investigated. They are the dam without foundation (fixed base), and three different depths of the foundation. Taking into consideration the changing of upstream water level, the empty, minimum, and maximum water levels, the results of the three-dimensional F
Extreme conditions will cause the water level of high fill canal segment to change suddenly, which will affect the velocity and pore pressure of the slope. A 9 km irrigation earth canal in the city of Alsyahy, 15 km away from Al-Hilla city, and branching off from the left side of Shatt Al-Hilla at 57 km, was studied. The aim of this work is to study and analyze the effect of rationing system on the Birmana earthen canal during rapid drawdown case. Finite element modeling with Geo-Studio software was used in the present study to analyze the combined seepage and slope stability for three cycles. The resulting minimum safety factor obtained from the analysis using the saturated and