Calibration and Verification of the Hydraulic Model for Blue Nile River from Roseires Dam to Khartoum City
...Show More Authors

This research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing it with another set of data. The model was calibrated using data from gauging stations (Khartoum, Wad Medani, downstream Sennar, and downstream Roseires) during the period from the 1st of May to 31 of October 1988 and the verification was done using the data of the same gauging stations for years 2003 and 2010 for the same period. The required available data from these stations were collected, processed and used in the model calibration. The geometry input files for the HEC-RAS models were created using a combination of ArcGIS and HEC-GeoRAS. The results revealed high correlation (R2 ˃ 0.9) between the observed and calibrated water levels in all gauging stations during 1988 and also high correlation between the observed and verification water levels was obtained in years 2003 and 2010. Verification results with the equation and degree of correlation can be used to predict future data of any expected data for the same stations.

 

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Calibration and verification of the hydraulic model for Blue Nile river from Roseires dam to Khartoum city
...Show More Authors

This research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing it with anothe

... Show More
Publication Date
Sun Mar 01 2015
Journal Name
Sust Journal Of Engineering And Computer Science (jecs)
Virtual failure influence of Roseires dam on Khartoum city using HEC-RAS Hydraulic simulation modeling
...Show More Authors

Dam break is series phenomenon that can result in fatal consequences and loss of properties. Unfortunately, the observed consequences can only be available after the dam breaks. Therefore, it is important to anticipate what will happen prior to dam break to issue suitable warning and locate the possible risk areas. This study attempts to simulate the case of dam break in Blue Nile at Roseires dam and see its consequences downstream. Roseires dam lies at a distance of 630 km south of Khartoum, Sennar dam lies at about 260 km downstream of Roseires dam. In this study hydraulic model is developed based of Hydraulic Engineering Centre (HEC), River Analysis System (RAS), and HEC- RAS. The HEC-RAS based model is calibrated and validated usi

... Show More
Publication Date
Mon Sep 01 2014
Journal Name
Paripex-indian Journal Of Research
Inundation Map Development by Using HEC-RAS Hydraulic Simulation Modeling from Roseires to Khartoum Cities
...Show More Authors

Inundation floodingmap aimedto find outearly warningsto avoidenvironmental damageandhumanin terms of theheight ofthe wave ofwater, speed time arrival, effects of inundation sideanddepth of the water/ distanceand reduce the impact of the flood wave after obtaining the process of collapse of the dam in the lower part of the river to the dam area. The study has been using a numerical model one-dimensional depends on the development of equations (Saint-Venant) so that parts of the river, any river channel main banks of the right and left treated as separate parts, that’s the difference in the characteristics of the hydraulic and engineering, along the line of the flow will take into account in each section of the sections and flow in the riv

... Show More
Publication Date
Sun Jun 01 2014
Journal Name
Journal Of Water Resource And Hydraulic Engineering (jwrhe)
Large Scale Field Physical Model Simulation of Roseires Dam-Break, Sudan
...Show More Authors

Physically based modeling approach has been widely developed in recent years for the simulation of dam failure process due to the lack of field data. This paper provides and describes a physically-based model depending on dimensional analysis and hydraulic simulation methods for estimating the maximum water level and the wave propagation time from breaching of field test dams. The field physical model has been constructed in Dabbah city to represent the collapse of the Roseires dam in Sudan. Five cases of a dam failure were studied to simulate water flood conditions by changing initial water height in the reservoir (0.8, 1.0, 1.2, 1.4 and 1.5 m respectively).The physical model working under five cases, case 5 had the greatest influence of t

... Show More
Publication Date
Sun May 26 2019
Journal Name
Iraqi Journal Of Science
Hydraulic Characteristics of the Aquifer up Al-Khassa Dam Sub-Basin Kirkuk/NE Iraq
...Show More Authors

The aim of this study is to the evaluation of the general hydrogeology condition of the Al-Khassa sub-basin area. Pumping test has been done for five wells in the area. The hydrogeological characteristics (transmissivity, hydraulic conductivity and storage coefficient) were determined in the area by input data which obtained from the pumping test process into the (AquiferWin32, Version 5) software program. The data were analyzed using Copper-Jacob, Theis and Hantuosh methods for pumping, the values of hydraulic characteristics range from: transmissivity (0.98 to 19.57) m²/day in (W7-W9-W10-W12) sites and 416 m²/day in W1, hydraulic conductivity (0.051 to 0.305) m/day in (W7-W9-W10-W12) sites and 5.012 m/day in W1, storage coefficie

... Show More
View Publication Preview PDF
Scopus (2)
Scopus Crossref
Publication Date
Wed Mar 01 2023
Journal Name
Journal Of Engineering
The Roughness Coefficient in Euphrates River Reach between Haditha Dam to Ramadi Barrage
...Show More Authors

Accurate computation of the roughness coefficient is important in the studies of open channel flow. To measure and identify the hydraulic characteristics of the flow system, the model simulation is necessary to study and get the results of the hydraulic properties to specify Manning coefficient of the Euphrates River. In this study, the reach is extended along the Euphrates River from Haditha Dam to Ramadi Barrage with a distance of 169km. The HEC-RAS model was implemented to simulate the flow within the study reach. The geometry of the river was represented by more than two hundred cross-sections surveyed in 2013 and 2021. The model was calibrated using some observed discharges at the Heet gage station for records of th

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Jun 01 2021
Journal Name
Iop Conference Series: Materials Science And Engineering
Hydraulic characteristics of the lower part of Diyala River
...Show More Authors
Abstract<p>A one-dimensional hydraulic model was conducted to simulate the flow in Diyala River. The research aims to study the flow capacity along Diyala River and especially concerning on reach of the river within Baqubah City during flood seasons by using HEC-RAS, 5.07 software. Moreover, specifying the hydraulic problems and then the necessary treatments to overcome them were suggested. A 190 km length of the reach of Diyala River was included in this study, starts from Diyala submerged weir to the confluence of Diyala-Tigris River south of Baghdad City. Good agreement resulted between the measured and the simulation results with a determination coefficient (R2) value of 0.84 with Manning Co</p> ... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Wed Jun 01 2022
Journal Name
Baghdad Science Journal
Impact of Hindiya Dam on the Limnological Features of Euphrates River to the North of Babil Governorate, Iraq
...Show More Authors

          Five sites were chosen to the north of Babil Governorate in   order to identify the limnological features and the impact of the Hindiya Dam during 2019. Site2 was located near the dam to reflect the ecological features of this site, whereas other sites, S1 was located at the upstream of the dam as a control site. Moreover, the two other sites S3 and S4 were located down the dam. The results of  the  study  showed  a  close  correlation  between air and water temperature at all sites. Also there were significant differences in average of thirteen out of eighteen water parameters.Water temperature, total alkalinity, bicarbonate, DO, POS, TH and Mg+2  ions  decreased from 22.76˚C, 203.33 mg/L,

... Show More
View Publication Preview PDF
Scopus (8)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Wed Jul 01 2020
Journal Name
Journal Of Engineering
One and Two-Dimensional Hydraulic Simulation of a Reach in Al-Gharraf River
...Show More Authors

       

One and two-dimensional hydraulic models simulations are important to specify the hydraulic characteristics of unsteady flow in Al-Gharraf River in order to define the locations that facing problems and suggesting the necessary treatments. The reach in the present study is 58200m long and lies between Kut and Hai Cities. Both numerical models were simulated using HEC-RAS software, 5.0.4, with flow rates ranging from 100 to 350 m3/s. Multi-scenarios of gates openings of Hai Regulator were applied. While the openings of Al-Gharraf Head Regulator were ranged between 60cm to fully opened. The suitable manning roughness for the unsteady state was

... Show More
View Publication Preview PDF
Crossref (8)
Crossref
Publication Date
Mon Dec 10 2018
Journal Name
Indian Journal Of Natural Sciences
Verification the Pollution of Tigris River in South of Baghdad using Remote Sensing Techniques
...Show More Authors

This paper describes the use of remote sensing techniques in verification of the polluted area in Diyala River and Tigris River and the effected of AL-Rustamiyah wastewater treatment plant, which is located on Diyala River, one of the branches of Tigris River in south of Baghdad. SPOT-5 a French satellite image of Baghdad, Iraq was used with ground resolution of 2.5 m in May 2016. ENVI 5.1 software programming was utilized for Image processing to assess the water pollution of Diyala and Tigris River’s water. Five regions were selected from a study area and then classified using the unsupervised ISODATA method. The results indicated that four classes of water quality which are successful in assessing and mapping water pollution which confi