Risks of Design Stage in Iraqi Construction Project
...Show More Authors

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.

It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of completed project meets those requirements.

Therefore it has been necessary to focus in this paper on the design stage also demonstrated and analysis the most important risk facing this stage and their impact on a construction project by introducing a questionnaire to identify the most important risks factors at this stage affecting on the project.

The paper had been shown that the effect of the design stage on Lump sum type of project contract was higher than the unit price, while the most important factor effect on a project its fast response of design team to prepare the design documents in order to facilitate the workflow and sequence of execution with effect level 3.714.

 

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Jul 07 2013
Journal Name
Journal Of Educational And Psychological Researches
Effect of Using Computer in Getting and Remaining Information at Students of First Stage in Biology Subject
...Show More Authors

Effect of Using Computer in Getting and Remaining Information at Students of First Stage in Biology Subject MIAAD NATHIM RASHEED LECTURER Abstract The recent research goal is to know the influence of computer use to earn and fulfillment information for students of first class in biology material and to achieve that put many of the zeroing hypothesis by researcher as follow: There were no differences between statistical signs at level (0,05) between the average students' marks who they were study by using computer and between the average student ' marks who they were study in classical method of earning and fulfillment. The researcher chose the intentional of the medical technical institute that included of two branches the first class (A

... Show More
View Publication Preview PDF
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (2)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Mon Feb 01 2016
Journal Name
Journal Of Engineering
Valuation of Construction Projects Based on of Quantity Scale by using Expert System
...Show More Authors

The subject of an valuation of quality of construction projects is one of the topics which it becomes necessary of the absence of the quantity standards in measuring the control works and the quality valuation standards in constructional projects. In the time being it depends on the experience of the workers which leads to an apparent differences in the valuation.

The idea of this research came to put the standards to evaluate the quality of the projects in a special system depending on quantity scale nor quality specifying in order to prepare an expert system “ Crystal “ to apply this special system to able the engineers to valuate the quality of their projects easily and in more accurate ways.

View Publication Preview PDF
Publication Date
Sat Jun 01 2024
Journal Name
Journal Of Research In Dental And Maxillofacial Sciences
Relationship between Third Molar Impaction and Extraction, and Awareness about the Associated Potential Risks
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Thu Mar 18 2010
Journal Name
Spe Projects, Facilities & Construction
Correlating Optimum Stage Pressure for Sequential Separator Systems
...Show More Authors
Summary<p>A study to find the optimum separators pressures of separation stations has been performed. Stage separation of oil and gas is accomplished with a series of separators operating at sequentially reduced pressures. Liquid is discharged from a higher-pressure separator into the lower-pressure separator. The set of working separator pressures that yields maximum recovery of liquid hydrocarbon from the well fluid is the optimum set of pressures, which is the target of this work.</p><p>A computer model is used to find the optimum separator pressures. The model employs the Peng-Robinson equation of state (Peng and Robinson 1976) for volatile oil. The application of t</p> ... Show More
View Publication
Scopus (17)
Crossref (13)
Scopus Crossref
Publication Date
Thu Mar 10 2022
Journal Name
Alustath Journal For Human And Social Sciences
Cognition Construction of First Language of Translator ‎Education in Iraq: A Correlation Study
...Show More Authors

The majority of Iraqi translator-student have problems at two main levels: the conceptual level and the productive level. From different perspectives, such problems are either related to ‘language’ or to ‘cognition’. This binary view is an indication to the implicit and interchangeable relationship between language and cognition. The relationship between cognition language and translator starts with the first language and its effect on the Iraqi translators. Identifying the effect is the aim of the present study. It is hypothesized that Iraqi students are negatively influenced by the problems and weaknesses of first language schema. This reflects the major claim and later concludes that first language instruction in the Iraq

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Aug 01 2022
Journal Name
Journal Of Engineering
The Causes Influencing the Occurrence of Variation Orders in the Construction of Buildings
...Show More Authors

In the construction of buildings usually, problems occur because of the causes of change orders. The main causer of change orders is the owners, consultants, and contractors. These changes lead to conflicts among them which result in influencing building projects. Therefore, it is necessary to analyze the causes of change orders to reduce them and facilitate management. This paper determines the most critical factors that cause change orders from a different point of view, a consulting owner and a contractor, and a study of the reality of the management of change orders when constructing public buildings. The method employed in this research is a field survey using interviews with experts working in the construction of p

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Mon Jun 30 2025
Journal Name
Medical Journal Of Babylon
Assessment of Six Polymorphic Variants as Genetic Risks for Coronary Artery Disease: A Case–Control Study
...Show More Authors
Abstract<sec> <title>Background:

Coronary artery disease (CAD) is the leading cause of death worldwide. Certain genetic polymorphisms play an important role in this multifactorial disease, being linked with increased risk of early onset CAD.

Objective:

To assess six genetic polymorphisms and clinical risk factors in relation to early onset nondiabetic Iraqi Arab CAD patients compared to controls.

Materials and Methods:

This case–contro

... Show More
View Publication
Scopus Crossref
Publication Date
Mon Feb 04 2019
Journal Name
Iraqi Journal Of Physics
Risks assessment for the retrieval of radioactive waste from the old Russian cemetery Al -Tuwaitha site
...Show More Authors

In this work the radioactive wastes in the Old Russian
Cemetery Al -Tuwaitha site were classified according to risks for
workers who are involved in the retrieval process. The exposure
assessment results expressed as estimates of radionuclide intakes by
inhalation and ingestion, exposure rates and duration for external
exposure pathways, and committed effective dose equivalents to
individuals from all relevant radionuclides and pathways. Results
showed the presence of natural radionuclides Ra-226, Th-234 and K-
40, as well as the produced radionuclide Cs-137 and Eu-152 in the
cemetery wells. The absorbed doses from the waste were classified to
two categories; exempt waste and low level waste according to

... Show More
View Publication Preview PDF
Crossref