Risks of Design Stage in Iraqi Construction Project
...Show More Authors

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.

It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of completed project meets those requirements.

Therefore it has been necessary to focus in this paper on the design stage also demonstrated and analysis the most important risk facing this stage and their impact on a construction project by introducing a questionnaire to identify the most important risks factors at this stage affecting on the project.

The paper had been shown that the effect of the design stage on Lump sum type of project contract was higher than the unit price, while the most important factor effect on a project its fast response of design team to prepare the design documents in order to facilitate the workflow and sequence of execution with effect level 3.714.

 

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue May 09 2023
Journal Name
Buildings
Identification of Desired Qualifications for Construction Safety Personnel in the United States
...Show More Authors

Construction is a hazardous industry with a high number of injuries. Prior research found that many industry injuries can be prevented by implementing an effective safety plan if prepared and maintained by qualified safety personnel. However, there are no specific guidelines on how to select qualified construction safety personnel and what criteria should be used to select an individual for a safety position in the United States (US) construction industry. To fill this gap in knowledge, the study goal was to identify the desired qualifications of safety personnel in the US construction industry. To achieve the study goal, the Delphi technique was used as the main methodology for determining the desired qualifications for constructio

... Show More
View Publication
Scopus (5)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Sun Jul 07 2013
Journal Name
Journal Of Educational And Psychological Researches
Effect of Using Computer in Getting and Remaining Information at Students of First Stage in Biology Subject
...Show More Authors

Effect of Using Computer in Getting and Remaining Information at Students of First Stage in Biology Subject MIAAD NATHIM RASHEED LECTURER Abstract The recent research goal is to know the influence of computer use to earn and fulfillment information for students of first class in biology material and to achieve that put many of the zeroing hypothesis by researcher as follow: There were no differences between statistical signs at level (0,05) between the average students' marks who they were study by using computer and between the average student ' marks who they were study in classical method of earning and fulfillment. The researcher chose the intentional of the medical technical institute that included of two branches the first class (A

... Show More
View Publication Preview PDF
Publication Date
Tue Mar 01 2011
Journal Name
Journal Of Economics And Administrative Sciences
The role of strategic leadership in knowledge management processes "Diagnostic Study in the Office of the Ministry of Oil - Project Department"
...Show More Authors

The research deals with the important and modern two subjects, strategic leadership which have six demotions and knowledge management
(four demotions') . the gools & the research is to know the relation & the effect them in the oil ministry (project department) , the sample was (50) persons who works in the department the questionnaire was the tool of data gathering .

The research divided to four parties, the first  to the theotical review of the research variables, the second to the research methrology, the third to analysis and discoed the empirical results the last to the conclusions and recommendations .

View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Sep 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The role of risk management programs in Dealing With risks at international airports: An Applied research at Baghdad International Airport
...Show More Authors

The objective of the research is to identify the efficiency of risk management in various names at Baghdad International Airport in the face of various risks (financial - technical - human - natural ..) facing the sample of the search of the General Establishment of Civil Aviation and the Iraqi Airways Company where the researcher identified the hypothesis that summarizes There is a significant significant correlation between risk management, risk management and risk review and assessment. The researcher used the means of research from observation and interviews with the relevant officials in this field, as well as used the questionnaire and distributed a sample of 170 employees in the field of risk management (SMS Department) in Iraqi A

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Ten Years of OpenStreetMap Project: Have We Addressed Data Quality Appropriately? – Review Paper
...Show More Authors

It has increasingly been recognised that the future developments in geospatial data handling will centre on geospatial data on the web: Volunteered Geographic Information (VGI). The evaluation of VGI data quality, including positional and shape similarity, has become a recurrent subject in the scientific literature in the last ten years. The OpenStreetMap (OSM) project is the most popular one of the leading platforms of VGI datasets. It is an online geospatial database to produce and supply free editable geospatial datasets for a worldwide. The goal of this paper is to present a comprehensive overview of the quality assurance of OSM data. In addition, the credibility of open source geospatial data is discussed, highlight

... Show More
View Publication Preview PDF
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Ten Years of OpenStreetMap Project: Have We Addressed Data Quality Appropriately? – Review Paper
...Show More Authors

It has increasingly been recognised that the future developments in geospatial data handling will centre on geospatial data on the web: Volunteered Geographic Information (VGI). The evaluation of VGI data quality, including positional and shape similarity, has become a recurrent subject in the scientific literature in the last ten years. The OpenStreetMap (OSM) project is the most popular one of the leading platforms of VGI datasets. It is an online geospatial database to produce and supply free editable geospatial datasets for a worldwide. The goal of this paper is to present a comprehensive overview of the quality assurance of OSM data. In addition, the credibility of open source geospatial data is discussed, highlighting the diff

... Show More
Crossref (3)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (2)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Mon Feb 01 2016
Journal Name
Journal Of Engineering
Valuation of Construction Projects Based on of Quantity Scale by using Expert System
...Show More Authors

The subject of an valuation of quality of construction projects is one of the topics which it becomes necessary of the absence of the quantity standards in measuring the control works and the quality valuation standards in constructional projects. In the time being it depends on the experience of the workers which leads to an apparent differences in the valuation.

The idea of this research came to put the standards to evaluate the quality of the projects in a special system depending on quantity scale nor quality specifying in order to prepare an expert system “ Crystal “ to apply this special system to able the engineers to valuate the quality of their projects easily and in more accurate ways.

View Publication Preview PDF
Publication Date
Thu Mar 18 2010
Journal Name
Spe Projects, Facilities & Construction
Correlating Optimum Stage Pressure for Sequential Separator Systems
...Show More Authors
Summary<p>A study to find the optimum separators pressures of separation stations has been performed. Stage separation of oil and gas is accomplished with a series of separators operating at sequentially reduced pressures. Liquid is discharged from a higher-pressure separator into the lower-pressure separator. The set of working separator pressures that yields maximum recovery of liquid hydrocarbon from the well fluid is the optimum set of pressures, which is the target of this work.</p><p>A computer model is used to find the optimum separator pressures. The model employs the Peng-Robinson equation of state (Peng and Robinson 1976) for volatile oil. The application of t</p> ... Show More
View Publication
Scopus (16)
Crossref (14)
Scopus Crossref