Finding the shortest route in wireless mesh networks is an important aspect. Many techniques are used to solve this problem like dynamic programming, evolutionary algorithms, weighted-sum techniques, and others. In this paper, we use dynamic programming techniques to find the shortest path in wireless mesh networks due to their generality, reduction of complexity and facilitation of numerical computation, simplicity in incorporating constraints, and their onformity to the stochastic nature of some problems. The routing problem is a multi-objective optimization problem with some constraints such as path capacity and end-to-end delay. Single-constraint routing problems and solutions using Dijkstra, Bellman-Ford, and Floyd-Warshall algorithms are proposed in this work with a discussion on the difference between them. These algorithms find the shortest route through finding the optimal rate between two nodes in the wireless networks but with bounded end-to-end delay. The Dijkstra-based algorithm is especially favorable in terms of processing time. We also present a comparison between our proposed single-constraint Dijkstra-based routing algorithm and the mesh routing algorithm (MRA) existing in the literature to clarify the merits of the former.
The research is concerned with studying the characteristics of Sustainable Architecture and Green Architecture, as a general research methodology related to the specific field of architecture, based on the differentiation between two generic concepts, Sustainability and Greening, to form the framework of the research specific methodology, where both concepts seem to be extremely overlapping for research centers, individuals, and relevant organizations. In this regard, the research tend towards searching their characteristics and to clearly differentiates between the two terms, particularly in architecture, where the research seeks understanding sustainable and green architectures, how they are so close or so far, and the
... Show MoreOne of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building pro
... Show MoreBackground: This study was aimed to investigate the effect of three lingual button (Nickel free / rectangular base, Nickel free / round base and Composite) and bonding environment, wet and dry enamel surface, on: the shear bond strength (SBS) of light and self-cured Resin Modified Glass Ionomer Cements, and the debonding failure sites. Materials and method: One hundred twenty no-carious, free of cracks maxillary first premolar teeth were selected. Three types of orthodontic lingual buttons were used in this study: Nickel free / rectangular base, Nickel free / round base and Composite buttons. The teeth were divided into two groups of sixty teeth each. One group was used for testing the chemically cured GC Fuji Ortho Resin modified Glass Io
... Show MoreBackground: Patients requiring renal biopsies have various glomerular diseases according to their demographic characteristics.
Objective: To study types of glomerular disease among adult Iraqi patients in a single center in Baghdad/Iraq
Material and Methods: A total of 120 native kidney biopsies were studied. All biopsies were adequate and were processed for Light Microscopy.
The age range of the study patients was 17-67 years, with a mean of 38.5 years. The mean follow up period was 28 weeks (4-52 weeks)
Indication for biopsy included: Nephrotic syndrome (N=72; 60%), Asymptomatic proteinuria (N=21; 17.5%), acute nephritic presentation (N=17; 14.16%), asymptomatic haematuria (N=10; 8.33%).
Results: Primary glomerulonephrit
Background: Molars and premolars are considered as the most vulnerable teeth of caries attack, which is related to the morphology of their occlusal surfaces along with the difficulty of plaque removal. different methods were used for early caries detection that provide sensitive, accurate preoperative diagnosis of caries depths to establish adequate preventive measures and avoid premature tooth treatment by restoration. The aim of the present study was to evaluate the clinical sensitivity and specificity rates of DIAGNOdent and visual inspection as opposed to the ICDAS for the detection of initial occlusal caries in noncavitated first permanent molars. Materials and Methods: This study examined 139 occlusal surface of the first permanent
... Show MoreThe mediation system is based on settling the dispute amicably through the intervention of a third party by bringing views closer away from the judiciary, which is an amicable way to settle disputes, which disputants resort to voluntarily, but some Western legislation has begun to impose resorting to mediation to settle disputes compulsorily, to take advantage of its advantages, get rid of the disadvantages of resorting to the judiciary in some disputes, and relieve pressure on the courts.
This Paper aims to plan the production of the electrical distribution converter (400 KV/11) for one month at Diyala Public Company and with more than one goal for the decision-maker in a fuzzy environment. The fuzzy demand was forecasting using the fuzzy time series model. The fuzzy lead time for raw materials involved in the production of the electrical distribution converter (400 KV/11) was addressed using the fuzzy inference matrix through the application of the matrix in Matlab, and since the decision-maker has more than one goal, so a mathematical model of goal programming was create, which aims to achieve two goals, the first is to reduce the total production costs of the electrical distribution converter (400 KV/11) and th
... Show MoreIn this paper, a new hybrid algorithm for linear programming model based on Aggregate production planning problems is proposed. The new hybrid algorithm of a simulated annealing (SA) and particle swarm optimization (PSO) algorithms. PSO algorithm employed for a good balance between exploration and exploitation in SA in order to be effective and efficient (speed and quality) for solving linear programming model. Finding results show that the proposed approach is achieving within a reasonable computational time comparing with PSO and SA algorithms.
Integrating Renewable Energy (RE) into Distribution Power Networks (DPNs) is a choice for efficient and sustainable electricity. Controlling the power factor of these sources is one of the techniques employed to manage the power loss of the grid. Capacitor banks have been employed to control phantom power, improving voltage and reducing power losses for several decades. The voltage sag and the significant power losses in the Iraqi DPN make it good evidence to be a case study proving the efficiency enhancement by adjusting the RE power factor. Therefore, this paper studies a part of the Iraqi network in a windy and sunny region, the Badra-Zurbatya-11 kV feeder, in the Wasit governorate. A substation of hybrid RE sources is connected to this
... Show MoreThe inverse kinematics of redundant manipulators has infinite solutions by using conventional methods, so that, this work presents applicability of intelligent tool (artificial neural network ANN) for finding one desired solution from these solutions. The inverse analysis and trajectory planning of a three link redundant planar robot have been studied in this work using a proposed dual neural networks model (DNNM), which shows a predictable time decreasing in the training session. The effect of the number of the training sets on the DNNM output and the number of NN layers have been studied. Several trajectories have been implemented using point to point trajectory planning algorithm with DNNM and the result shows good accuracy of the end
... Show More