Preferred Language
Articles
/
joe-1847
Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years. After conducting a descriptive statistical analysis of the data obtained through a field survey and interviews with individuals working in the construction sector with experience in their field. The most important 10 factors were identified from a list of 51 delay factors (distributed according to the questionnaire forms) with a high RII. These factors were related to the delay in the payment of the contractor's dues, the delay in processing materials, the issuance of new instructions and regulations, the delay in obtaining official approvals from the relevant authorities, Errors in designs or contracting documents, lack of cooperation between the contracting parties, and multiple spare orders for reasons belonging to the employer. The article also included the most important suggestions that contribute to reducing the delay in completing projects.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology & Applied Science Research
Investigating the Causes of Poor Cost Control in Iraqi Construction Projects
...Show More Authors

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat

... Show More
View Publication
Crossref (6)
Crossref
Publication Date
Sat Oct 01 2016
Journal Name
Journal Of Theoretical And Applied Information Technology
Factors affecting global virtual teams’ performance in software projects
...Show More Authors

Scopus (23)
Scopus
Publication Date
Wed Nov 07 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Assessment of Factors Associated with Prehospital Delay of Patients with Acute Myocardial Infarction
...Show More Authors

Objective(s): to assess the factors which are associated with the prolonged prehospital delay of patients with
acute myocardial infarction.
Methodology: A descriptive study was conducted at the Coronary Care unit (CCU) in Al-Yarmok Teaching
Hospital, Ibn AL-Nafis Hospital for Cardiovascular Diseases, AL-Kadumia Teaching Hospital, Baghdad Teaching
Hospital, and AL-Kindy Teaching Hospital during the period of the study from February 2
nd
, 2009 to October 30th
,
2009. A random sample of (160) paƟent who were admiƩed to the hospitals were selected one by one. A
questionnaire was constructed for the purpose of the study, which is comprised of four parts that include (1)
sociodemographic data; (2) prehospital d

... Show More
View Publication Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Research In Social Sciences & Humanities
The ROLE OF THE CLEANER PRODUCTION STRATEGY IN ENHANCING THE MAIN SUCCESS FACTORS
...Show More Authors

The business environment is witnessing tremendous developments in the field of production and technology, which requires the development of production methods to go in line with these developments and the increasing competition, which has gone beyond the economic aspects to extend to the environmental aspects, as economic units tended to adopt a cleaner production strategy and through what they achieve by producing environmentally friendly products and achieving economic efficiency. Reducing costs, providing a safe and clean environment for workers, and reducing waste from production operations.

View Publication Preview PDF
Crossref
Publication Date
Thu Feb 28 2019
Journal Name
Journal Of Engineering
Economic Benefits for the Application of Standards of Sustainability in Construction Projects
...Show More Authors

In this research, that been focused on the most important economic benefits expected when applying the three standards of sustainability in construction projects (economic, environmental and social). Fuzzy AHP, a multi-decision decision-making technique for evaluating construction projects. Which when used we get the speed and accuracy in the results. Using this technique will reduce uncertainties decisions significantly (fuzzy environment), that found in most projects .The results of the data analysis showed  that the economic standards take the greatest relative importance (60%) among the three sustainability standards. Therefore, the implementation of any standards need a cost so the economic benefit of any proje

... Show More
View Publication Preview PDF
Crossref (7)
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects
...Show More Authors

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying the decision-making state and impact in Iraqi construction projects
...Show More Authors

View Publication
Scopus (2)
Crossref (1)
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying The Decision-Making State and Impact in Iraqi Construction Projects
...Show More Authors

View Publication
Crossref
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Thu Jan 01 2015
Journal Name
Journal Of Engineering
Performance Improvement of the Implementation of Concrete Structures in the Construction Sector In Iraq Using The Modern Management Technique “Six Sigma”
...Show More Authors

The reality of the field of construction projects in Iraq refers to needing for the development of performance in order to improve quality and reduce defects and errors and to control the time and cost, so there is needing for the application of effective methods in this area, one of the methods that can be applied in this area is the manner of Six Sigma. This research aims to enhance the performance and quality improvement for the construction projects by improving performance in the work of the implementation of the concrete structure depending on the Six Sigma methodology, and for the purpose of achieving the aim of the research, the researcher firstly depends on the theoretical study that include the concepts of qual

... Show More
View Publication