Preferred Language
Articles
/
joe-1834
Integration Building Information Modeling and Lean Construction Technologies in the Iraqi Construction Sector: Benefits and Constraints
...Show More Authors

Building Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.

According to the study's findings, the benefits include ensuring the most effective project delivery method and shortening the design project life cycle. The building industry's procedures will incorporate suppliers. In contrast, the main constraints include the government rules and industry standards for BIM and LC are not obligatory, the absence of government funding and participation, and the industry's resistance to changing from customary operating methods. The study strategies and recommendations will enhance BIM-LC-LC implementation. It allows project partners to focus on addressing the challenges identified in this study and understand the benefits of BIM-LC to be an incentive to adopt them.

Scopus Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Sep 30 2019
Journal Name
Engineering Journal
Effects of Water Table Level on Slope Stability and Construction Cost of Highway Embankment
...Show More Authors

Highway embankments stability during its service period represents an important factor for the safety of highway users and vehicles. Consequently, the cost of construction of these embankments should be adequate to maintain the safety and durability during this period through proper estimation of the loading on asphalt pavement, slope stability, horizontal and vertical deformation, etc. Slope stability of the embankment mainly depends on the shear strength of the soil layers materials; this shear strength is affected by the water table level through the contribution of the capillary water. Negative pore water pressure above the water table level evolves matric suction in the unsaturated zone above water table; this matric suction increases

... Show More
Crossref (8)
Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
Scopus (8)
Crossref (10)
Scopus Clarivate Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
View Publication
Scopus (8)
Crossref (10)
Scopus Clarivate Crossref
Publication Date
Wed Jan 01 2020
Journal Name
Construction Research Congress
Risk Perception of Construction Personnel: A Social Construct Outlook
...Show More Authors

Scopus (1)
Scopus
Publication Date
Sun Jul 14 2024
Journal Name
مجلة دراسات وبحوث التربية الرياضية
Construction and Validation of a Cognitive Engagement Scale and Its Relationship with Ball Movement Sequence Performance in Rhythmic Gymnastics
...Show More Authors

The research aims to: build and record a measure of cognitive participation among second-year female students at the College of Physical Education and Sports Sciences, University of Baghdad. The researchers used the descriptive approach in the survey style for the research sample. The sample was selected from female students and divided into: (10) female students for the survey sample, and (80) female students for the construction and codification sample. The data were statistically analyzed by the researchers using SPSS, the T-test for independent and correlated samples, Pearson's simple correlation coefficient, Cronbach's alpha, Chi-square, and Spearman-Brown. They were recruited for the samples. The study concluded that constr

... Show More
Preview PDF
Publication Date
Fri Aug 02 2024
Journal Name
Engineering, Technology & Applied Science Research
The Effect of Construction Joints on the Behavior of Reinforced Concrete Deep Beams
...Show More Authors

The main objective of the present research is to conduct a thorough investigation into the impact of construction joints on the structural performance of reinforced concrete deep beams. This study involves a series of experimental tests and the use of advanced numerical analysis techniques to gain a deeper understanding of the behavior of these beams in the presence of construction joints. The experimental component incorporates analysis findings from both previous and current research. Specifically, six reinforced concrete deep beam specimens featuring horizontal and inclined construction joints were utilized as simply being supported with two-point loading. The test findings indicate that the presence of a horizontal construction

... Show More
View Publication
Crossref (3)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (4)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Thu Oct 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
The Impact of Strategic Intelligence In Decision Making Styles An Analytical research in the Construction& Housing ministry
...Show More Authors

            This research aims to explore the impact of strategic  intelligence by his dimensions (Foresight , system thinking, vision, motivation and partnership) on decision making styles which represented by ( rational, intuitive, dependent, Spontaneous and  Avoidant style) for a sample of the administrative leaders in the center of  Reconstruction &Housing Ministry and Some its formations which are companies of (Sa'ad, Al Mansour, al Farouq, Assyria, al-Mu'tasim, al- Rasheed, and Public Authority for Housing).  So to achieve the  research objectives and to test hypotheses, it has been relying

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Jul 01 2015
Journal Name
Journal Of Educational And Psychological Researches
Reality and constraints of the use of computers in public schools in the governorate of Ma'an From the standpoint of teachers
...Show More Authors

 This study aims to recognize the process of using computer in    publicschools in Ma`an governorate in terms of hardware, capabilities, and teachers usage. It also aims to identify the most important obstacles those schools face from a teachers perspective.

            The study sample consists of (150) teachers from different disciplines. The researcher prepared two questionnaires related to the research pivotal, then presented to a group of arbitrators to be used in this final form. The data was analyzed statistically and the study concluded that there is a shortage in the computer services provided to teachers, and there is a w

... Show More
View Publication Preview PDF