Highway embankments stability during its service period represents an important factor for the safety of highway users and vehicles. Consequently, the cost of construction of these embankments should be adequate to maintain the safety and durability during this period through proper estimation of the loading on asphalt pavement, slope stability, horizontal and vertical deformation, etc. Slope stability of the embankment mainly depends on the shear strength of the soil layers materials; this shear strength is affected by the water table level through the contribution of the capillary water. Negative pore water pressure above the water table level evolves matric suction in the unsaturated zone above water table; this matric suction increases the shear strength of the soil depending on the soil type, void ratio, etc. This paper studies the slope stability of highway embankment using finite element method analysis to show the effect of the presence of water table and the contribution of the matric suction. A trial slope is shown to have same factor of safety with reduced cross section due to increasing the shear strength hence, reducing the cross-sectional cost is determined.
Gypseous soil is considered as a problematic soil for embankment construction, however, implementation of emulsified asphalt as a stabilization agent could be a proper solution for enhancing its properties as a subgrade soil. In this work, the sustainability of asphalt stabilized soil has been assessed in terms of its resistance to cyclic (freezing-thawing) and (heating-cooling) processes. Specimens have been prepared at optimum fluid content (moisture and emulsion) and tested under direct shear stresses while subjected to 30 cycles of (freezing-thawing) and (heating-cooling). Both of dry and soaked testing conditions have been implemented. Data have been observed after each 10 cycles, and compared with that of reference mix. It was conclud
... Show MoreA structural and engineering geological study of rock slope stability was carried out in six stations that lie in the Southwest of Baranan mountain, along Sirwan road. The rock slopes and discontinuities were surveyed at each of these stations, and the relationships with failures were determined. The slopes were classified on the basis of (Al-Saadi, 1981), and the rocks were described in engineering terms according to (Anon, 1972) and (Hawkins, 1986), Stereographic projection was made using software (GEOrient 9.5.0) to represent the field data that were recorded in order to understand the situation in the six stations (sites) that were chosen along Sirwan road near Darbandikhan dam, the failures' types were recorded during field study we
... Show MoreThis Study aims to engineering geological evaluation of Fatha and Injana Formations in northern Hamrin anticline throughout geological and engineering geological Survey including Preparing engineering geological map (Scale1:90000) and Studying rock Slopes Stability in (6) Stations ,representing all types of failures (taken place and possible).General Survey for rock Slopes included Classification and engineering description according to [1], [2]. The slopes in the area are Classified based on the direction of the Strike Slopes and Strike of beds into Parallel, Oblique Lateral and orthogonal Slopes according to [3].Classification and the Slope Types are Concordant Slope and discordant Slope . The rocks in the area consists of two engineer
... Show MoreThis paper presents the results of the slope failure analyses from fracture distributions and their relation to tectonic activity; the analytical results have indicated that the phenomena of plane failure, wedge failure and toppling failure can occur at almost of the survey sites within the study area.
The statistical data show that the fracture orientation mainly develop in the E-W, N-S and NW-SE due to the influence of tectonic activity. The occurrence of them together with the rock slope surface orientation has formed plane failure on the slope surface of the 3B highway in the E-W direction and the types of wedge failure and toppling failure on the slope surface of the highw
... Show MoreWhen embankment is constructed on very soft soil, special construction methods are adopted. One of the techniques is a piled embankment. Piled (stone columns) embankments provide an economic and effective solution to the problem of constructing embankments over soft soils. This method can reduce settlements, construction time and cost. Stone columns provide an effective improvement method for soft soils under light structures such as rail or road embankments. The present work investigates the behavior of the embankment models resting on soft soil reinforced with stone columns. Model tests were performed with different spacing distances between stone columns and two lengths to diameter ratios of the stone columns, in addition to different
... Show MoreThe road network in Surdash anticline is considered as an important road network connecting lower Dukan town with the touristic upper Dukan town. Dukan lake plays an important role in the social and economic activities of Dukan town and the surrounding areas.
For assessing the stability of the rock slopes in the area, 9 stations were selected along the upper Dukan road on both sides of Surdash anticline, and their stability was evaluated by the kinematic analysis using DIPS V6.008 software.
Kinematic analysis of the studied stations shows thatplanar sliding is possible in stations No. 1, 2, 3 and 8, while wedge sliding is possible in station No. 5, 6, 7 and 9b. The other stations (No. 4and 9a) are stable. Tectonic structures
Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show More