Highway embankments stability during its service period represents an important factor for the safety of highway users and vehicles. Consequently, the cost of construction of these embankments should be adequate to maintain the safety and durability during this period through proper estimation of the loading on asphalt pavement, slope stability, horizontal and vertical deformation, etc. Slope stability of the embankment mainly depends on the shear strength of the soil layers materials; this shear strength is affected by the water table level through the contribution of the capillary water. Negative pore water pressure above the water table level evolves matric suction in the unsaturated zone above water table; this matric suction increases the shear strength of the soil depending on the soil type, void ratio, etc. This paper studies the slope stability of highway embankment using finite element method analysis to show the effect of the presence of water table and the contribution of the matric suction. A trial slope is shown to have same factor of safety with reduced cross section due to increasing the shear strength hence, reducing the cross-sectional cost is determined.
In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat
... Show MoreConstruction projects have become a changing dramatically in recent decades and that the goal of the beneficiaries of the implementation of structural project is to complete the work with less time and within the cost of the specific and the best possible quality may sometimes happen that highlights the importance of time on the rest of the items at the implementation of projects for various reasons, including the need to use the project as soon as possible possible change rapidly to customer's requests, but the high cost of the project represents the biggest obstacle for entrepreneurs with its effects on the quality and the time workers, and is a measure of those elements in monetary terms is the key to integration between them, so the
... Show MoreEngineering geological study of rock slope stability in two stations lying in the SW of Haibat Sultan mountain, along the Kalksmaq - Koisanjaq road was carried out. At each station, rock slopes and discontinuities were comprehensively surveyed and the relationships with failures were determined. The limestone rock was described in engineering terms, the types of failures recorded during field study were rock roll and toppling whiles the probable failures were sliding, toppling, and rock roll. The study also revealed that the factors affecting slope stability in the study area were slope angle, height, dip of strata, and discontinuities (which are almost perpendicular to the bedding plane). The laboratory test, of the rock samples (point-
... Show MoreIn this research, a geotechnical assessment was conducted for clay of the Gercus Formation to determine its suitability for embankment dams. The selected area is located in the north of Iraq. Six samples were collected from two sites in Dokan (Sulaimaniyah) and Haibat Sultan mountain (Koysinjaq), three samples each. Various geotechnical (physical, mechanical and chemical) tests were conducted based on standard specifications.
The results of the grain size test of clay samples showed their conformity with Zone C curves and their suitability for the construction of embankment dams, according to the Iraqi standard for roads and bridges. The results of the
... Show MoreThis study examined the effects of water scarcity on rural household economy in El Fashir Rural Council / North Darfur State- western Sudan. Both quantitative and qualitative methods were used as to get a deeper understanding of the impact of water scarcity on the rural house economy in the study area. 174 households out of 2017 were selected from 45 villages which were distributed in eight village councils forming the study area. Statistical methods were used to manipulate the data of the study. The obtained results revealed that water scarcity negatively affected the rural household economy in the study area in many features. These include the followings: much family efforts and time were directed to fetch for water consequentl
... Show MoreSawa Lake is considered one of the distinct closed water systems located in the southwestern part of Iraq. In last years, the lake has suffered from a significant decrease in the water depth reached 1.5 m, thus the current study aims to monitor and analyse the change in water level, and identify causes and effect of this change on the lake hydrochemical properties by using analyzing cations and anions with the assistance of sub bottom profilers technique as well as obtained information from scientific diving.
The results revealed that the lake had an equilibrium state between feed up and withdrawal water as well as evaporation during history. In spite of the high evaporation rates in the region, thi
... Show MoreConstruction and operation of (2 m) parabolic solar dish for hot water application were illustrated. The heater was designed to supply hot water up to 100 oC using the clean solar thermal energy. The system includes the design and construction of solar tracking unit in order to increase system performance. Experimental test results, which obtained from clear and sunny day, refer to highly energy-conversion efficiency and promising a well-performed water heating system.