Integration Building Information Modeling and Lean Construction Technologies in the Iraqi Construction Sector: Benefits and Constraints
...Show More Authors

Building Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.

According to the study's findings, the benefits include ensuring the most effective project delivery method and shortening the design project life cycle. The building industry's procedures will incorporate suppliers. In contrast, the main constraints include the government rules and industry standards for BIM and LC are not obligatory, the absence of government funding and participation, and the industry's resistance to changing from customary operating methods. The study strategies and recommendations will enhance BIM-LC-LC implementation. It allows project partners to focus on addressing the challenges identified in this study and understand the benefits of BIM-LC to be an incentive to adopt them.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at cr

... Show More
View Publication
Crossref (6)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Ssrn Electronic Journal
Diagnoses of Delay Causes in Construction Projects During Disaster
...Show More Authors

Purpose: The aim of this study was to gain insight into causes of time delays and cost overruns in a selection of thirty case projects in Iraq. Delay factors have been studied in many countries/contexts, but not much data exists from countries under the conditions characterizing Iraq during the last 10-15 years.Design/methodology/approach: A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. For the case of the study, the participants in the projects provided data about the projects through the data collection tool distributed through the questionnaire directed to them. Statistical data analysis was used to build statistical relationships between time and cost d

... Show More
View Publication
Crossref
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Laboratory Investigation on Roller Compaction Technique in Concrete Construction
...Show More Authors

Roller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg a

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Apr 01 2016
Journal Name
Journal Of Engineering
A Program Applying Professional Safety Basics in Construction Projects
...Show More Authors

When industrial and  constructional renaissance started in the world, the great interest was going on towards the equipment’s,  which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry.

     The professional safety is concerned as restrict which

... Show More
View Publication Preview PDF
Publication Date
Fri Sep 01 2017
Journal Name
Journal Of Construction Engineering And Management
Integrating Worker Health and Safety into Sustainable Design and Construction: Designer and Constructor Perspectives
...Show More Authors

View Publication
Scopus (65)
Crossref (45)
Scopus Clarivate Crossref
Publication Date
Mon Aug 01 2022
Journal Name
Journal Of Engineering
The Causes Influencing the Occurrence of Variation Orders in the Construction of Buildings
...Show More Authors

In the construction of buildings usually, problems occur because of the causes of change orders. The main causer of change orders is the owners, consultants, and contractors. These changes lead to conflicts among them which result in influencing building projects. Therefore, it is necessary to analyze the causes of change orders to reduce them and facilitate management. This paper determines the most critical factors that cause change orders from a different point of view, a consulting owner and a contractor, and a study of the reality of the management of change orders when constructing public buildings. The method employed in this research is a field survey using interviews with experts working in the construction of p

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Tue Feb 05 2019
Journal Name
Journal Of The College Of Education For Women
The value of work to the Elits of prophets and its influence on cultural construction
...Show More Authors

Praise be to Allah and peace and blessings be upon our Prophet Muhammad and on his family and companions
Yet,
The prophets (peace be upon them) urged all thevalues and one of these is the value of work which is of a great importance, that all nations have gathered against us as the eaters gather at a bowl. One of the reasons of our weakness and the strength of our enemy is that we have neglected the value of work. And rather a large number of ignorant and uneducatedpeople started to believe that the means of living, triumph, gaining power, and establishing a civilization are given by Allah with neithergainingnoreffort from us. While we find in the past that Allah the Almighty narrated to us the story of Mary (Peace be upon her) and

... Show More
View Publication Preview PDF
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Engineering
Development of a Blueprint Impact System of the risks on construction projects Implementation
...Show More Authors

In Production and Operations Management the specialists  have  tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization.

     The research aims to develop a blu

... Show More
View Publication Preview PDF
Publication Date
Wed Mar 01 2023
Journal Name
Journal Of Engineering
Design, Construction, and Control Tracking of Solar Thermal Concentrator by Using PLC in Erbil
...Show More Authors

This paper demonstrates the construction designing analysis and control strategies for fully tracking concentrated solar thermal by using programmable logic control in the city of Erbil-Iraq. This work used the parabolic dish as a concentrated solar thermal. At the focal point, the collected form of energy is used for heating a (water) in the receiver, analyzing this prototype in real-time with two different shapes of the receiver and comparing the results. For tracking the parabolic dish, four light-dependent resistors are used to detect the sun's position in the sky so that the tracking system follows it to make the beam radiation perpendicular to the collector surface all of the time during the day for maximum solar p

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Feb 29 2012
Journal Name
Al-khwarizmi Engineering Journal
Effect of Construction Joints on Performance of Reinforced Concrete Beams
...Show More Authors

Construction joints are stopping places in the process of placing concrete, and they are required because in many structures it is impractical to place concrete in one continuous operation. The amount of concrete that can be placed at one time is governed by the batching and mixing capacity and by the strength of the formwork. A good construction joint should provide adequate flexural and shear continuity through the interface.

In this study, the effect of location of construction joints on the performance of reinforced concrete structural elements is experimentally investigated.

Nineteen beam specimens with dimensions of 200×200×950 mm were tested. The variables investigated are the location of the construction joints

... Show More
View Publication Preview PDF