One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of processing of the required data regarding mechanisms and equipment and problems. It is related to the accuracy of the estimation and the management and documentation of labor wages. Most of the problems are the lack of appropriate systems to implement cost control appropriately.
Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at cr
... Show MoreThe aim of the research is to determine the impact of evaluating the investment projects in the development and preparation of investment budgets prepared by the economic units, since the investment projects are of an important and vital nature of the economic units, because these projects include the length of time for preparation and implementation and the accompanying period of this risk and uncertainties as well as need To the many funds to complete the project , The process of evaluating the implemented projects, which have been prepared an investment budget previously will contribute to the extent of matching the estimated data with the actual results or deviations, which is a step to avoid these errors in future p
... Show MoreThe paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show MoreAfter 2003 Iraq witnessed a rapid development in the number and kind of non-governmental organizations in addition to the increase in their sources.A lot of obstacles and constraints hinder the development of the said organizations and one of the most important and prominent obstacles is their administrative and accounting structure that affect directly on the existence, continuity and survival of these organizations.This research discussed the concept the non-governmental organizations and reaching the assessment of internal control System in these organizations. Therefore, the researcher has assessed the internal control System applied National Olympic Committee of Iraq. The study showed vulnerabilities in the internal control the said
... Show More
The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five
... Show MoreThe flexibility of interaction between the movement of macroeconomic variables that affect and are affected by the balance of payments, especially the movement of the current account, implies a perception of the maturity of economic development and what the theory assumes from the launch of a wide range of economic movement that varies in the degree of its influence according to the level of economic development and the vitality of the internal/external overlap relations through the assumed response to the movement of the macroeconomic variables. On this basis, it is possible to estimate the soundness and rationality of the economic decision taken that takes into account the required reciprocal repercussions between the current a
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc