Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects
...Show More Authors

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of processing of the required data regarding mechanisms and equipment and problems. It is related to the accuracy of the estimation and the management and documentation of labor wages. Most of the problems are the lack of appropriate systems to implement cost control appropriately.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Management And Enterprise Development
Studying the decision-making state and impact in Iraqi construction projects
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identifying the selection criteria of design consultant for Iraqi construction projects
...Show More Authors
Abstract<p>The quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA</p> ... Show More
View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
The Cost of Technology Transfer in Construction Companies (In Iraq)
...Show More Authors

The construction sector is considered an important and influential pivot in the national economy of any country.  Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Jan 01 2021
Journal Name
E3s Web Of Conferences
Investigation the Opportunity of BIM with Agile Management Approach in Iraqi Construction Projects
...Show More Authors

The construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the tim

... Show More
View Publication
Crossref (4)
Crossref
Publication Date
Wed Jun 01 2022
Journal Name
Res Militaris
The Effect of Internal Control in Supporting the Implementation of Cost Techniques in Iraqi Companies
...Show More Authors

In the last few years, there have been a lot of changes in the economy, society, and the environment. This has led to much competition between companies, directly and indirectly affecting production and marketing processes. Most companies are trying to cut production and manufacturing costs by using modern cost techniques such as product life cycle costing and Continuous Improvement (Kaizen) technology, in the method of measuring production costs or service costs, and the need for internal control to keep an eye on how these technologies are being used and how well they work. And to find out the effect of internal control on the implementation of costing techniques in Iraqi companies, 64 questionnaires were given to people who work in the i

... Show More
Scopus
Publication Date
Sun Jan 01 2023
Journal Name
E3s Web Of Conferences
Comparing the Design Alternatives Using Building Information Model (BIM) and Constructability in Iraqi Construction Projects
...Show More Authors

The Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After tha

... Show More
View Publication
Scopus Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a

... Show More
View Publication Preview PDF
Publication Date
Tue Jul 01 2014
Journal Name
Bulletin Of The Iraq Natural History Museum (p-issn: 1017-8678 , E-issn: 2311-9799)
THE CURRENT STATUS OF THE VERTEBRATE DIVERSITY IN Al-DALMAJ MARSH, Al-DIWANIYA PROVINCE
...Show More Authors

    A survey conducted at Dalmaj marsh, Al-Diwaniya Province during 2013 revealed that the marsh encounters a considerable part of the Iraqi vertebrate fauna including 147 species belonging to five classes; Pisces, Amphibia, Reptilia, Aves and Mammalia. Some species are of globally conservation importance. The present results are discussed with the pertinent literature.

View Publication Preview PDF
Publication Date
Tue Nov 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Evaluation of projects during the trial operation period in accordance with the cost, quality and time - applied research in the Directorate-General for the distribution
...Show More Authors

Research includes evaluation of projects implemented and which entered into trial operation period in accordance with the evaluation criteria and of (cost, quality and time) to determine the size deviations gap for the sample of projects during the years of assessment (2011-2012-2013-2014) of each of the three evaluation criteria, and then followed by a calculation the size of the overall gap to the problem based on the research problem to determine deviations from the specific implementation of each project by answering several questions to answer turns out the reasons for these deviations occur.

The importance of research Focus on the evaluation of received projects from contractors executing the projec

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF