The Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After that, a survey occurs in two sessions an open and closed questionnaire. The results were analyzed, and their mean, standard deviation, Cronbach's Alpha and developed weight will be found. The second part clears the method of linking these factors with BIM in order to assess the constructability in two different designs’ projects and find their cost. The method applies through a case study of an educational building located in Baghdad, Iraq; Rivet and Microsoft Excel programs are used in this paper. the result approves the success of using BIM technology to assess the constructability of a project in Iraq. Also, it shows how project cost will be affected when applying constructability factors.
Building Information Modeling (BIM) is extensively used in the construction industry due to its benefits throughout the Project Life Cycle (PLC). BIM can simulate buildings throughout PLC, detect and resolve problems, and improve building visualization that contributes to the representation of actual project details in the construction stage. BIM contributes to project management promotion by detecting problems that lead to conflicts, cost overruns, and time delays. This work aims to implement an effective BIM for the Iraqi construction projects’ life cycle. The methodology used is a literature review to collect the most important factors contributing to the success of BIM implementation, interview the team of the Cent
... Show MoreThe construction industry in Iraq suffers from many problems, perhaps the most important of which is the delay in time and the increase in costs. Therefore, it was necessary to try to adopt a new methodology that would help in overcoming these problems. It was suggested to combine building information modeling with the agile management approach because this technique and methodology is modern and helps in reducing time and cost and improving quality. This paper aims to know the status of using Building Information Modeling (BIM) and Agile Project management (APM) in Iraq and to shed light on the merging of this integration, explaining the benefits, difficulties, and workflow practices, finding the most influencing factors on the tim
... Show MoreBuilding Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.
According to the study's findings, the benefits include ensuring the most ef
... Show MoreThe construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire
... Show MoreThe quality and cost of constructed buildings are heavily influenced by the performance of design/auditing consultants. Thus, selecting the right design consultant and design auditing consultants is of utmost importance and not an easy task for any construction client. so, the client should specify the efficiency criteria and assess the performance levels of the design and design auditing consultant firm. The study aims to identify the selection criteria of the design consultant in construction projects and also identify the selection criteria of the design auditing consultant for the construction projects by using the Delphi survey with applying the principal components analysis (PCA
The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identi
... Show MoreConstruction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w
Building Information Modeling (BIM) is becoming a great known established collaboration process in Architecture, Engineering, and Construction (AEC) industry. In various cases in many countries, potential benefits and competitive advantages have been reported. However, despite the potentials and benefits of BIM technologies, it is not applied in the construction sector in Iraq just like many other countries of the world. The purpose of this research is to understand the uses and benefits of BIM for construction projects in Iraq. This purpose has been done by establishing a fr |