One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of processing of the required data regarding mechanisms and equipment and problems. It is related to the accuracy of the estimation and the management and documentation of labor wages. Most of the problems are the lack of appropriate systems to implement cost control appropriately.
This research analyzes the level of the short circuit effect of the Iraqi super network and decides the suitable location for the High Voltage Direct Current (HVDC) connections in order to obtain the best short circuit reduction of the total currents of the buses in the network. The proposed method depends on choosing the transmission lines for Alternating current (AC) system that suffers from high Short Circuit Levels (SCLs) in order to reduce its impact on the transmission system and on the lines adjacent to it and this after replacing the alternating current (AC) line by direct current (DC) line. In this paper, Power System Simulator for Engineering (PSS/E) is used to model two types of HVDC lines in an effective regi
... Show MoreConstruction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w
The problem of the study was to identify the possibility of benefiting from the application of the target cost system as a modern cost system to activate the environmental cost management instead of the traditional systems used in the company due to the great transformations witnessed by the business environment in all fields, which have resulted in the search for modern systems to provide more accurate and more appropriate information to reduce Costs, because accurate information makes the company have a complete vision to achieve the company’s goals. To solve this problem, the research was based on the following hypothesis (that the role of the target cost system leads to the activation of environmental cost management). Target c
... Show MoreForm of investment in infrastructure important factor to drive economic growth in any country, with the dwindling ability of governments to provide the necessary funds for such investments, emerged as a rising trend for private sector involvement in public projects and infrastructure, and one of these trends is the build-operate-transfer system (BOT), which commonly used in various developed and developing countries as one of the tools used in the implementation of these investments, as the private sector under this system design, finance, build and operate the project, and are re-administration of the state after a certain period under a contractual agreement between the parties of the contract. As this system provides majo
... Show MoreAbstract:
The current research aims to demonstrate the relationship of correlation and influence between the independent variable strategic control through its dimensions represented by (organizational structure, human resources management, commitment to specialization, defining powers and responsibilities, values and integrity) and the dependent variable the performance of the insurance company, and the degree of arrangement of these dimensions according to their importance, as well as Detection of significant differences in the sample's response to the questionnaire paragraphs in the researched company, and the research problem
... Show MoreThe research aims to measure the impact of knowledge management processes individually and in total in the innovative marketing.
We depart search of a problem expressed in a number of intellectual and practical questions, the application of this research in the General Company for Vegetable Oil Industry, represented composed a sample of (63) (Director General and Deputy Director General and Director of the Department and the Division) in the company researched, it has been designed measuring instrument to collect the necessary data either statistical means they are the percentage and the arithmetic mean and standard deviation and coefficient of variation and the coefficient of simple correlation and model
... Show MoreThe construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire
... Show MoreThe important factor in the success of construction projects is its ability to objective estimate of the cost of the project and adapt to the changes of the external environment, which is affected by a lot of elements and the requirements of the competitive environment. The faces of those projects are several problems in order to achieve particular goals. To overcome these difficulties has been the development of research in the last two decades and turn the focus on the role of the cost of project management, by providing information and assist management in planning and control of the budget among the main elements of the project, namely, (time-cost-quality),The research aims at the possibility of developing and implementing mechanisms
... Show More