The AlAdhaim Dam is located 133 kilometers northeast of Baghdad. It is a multipurpose dam and joints the Iraqi dam system in 2000. It has a storage capacity of 1.5 billion m3. The dam has an ogee spillway with a length of 562 m, a crest level of 131.5 m.a.m.s.l. and a maximum discharge capacity of 1150 m3/s at its maximum storage height of 143 m.a.m.s.l. This research aimed to investigate the hydrodynamics performance of the spillway and the stilling basin of AlAdhiam Dam by using numerical simulation models under gated situations. It was suggested to modify the dam capacity by increasing the dam's storage capacity by installing gates on the crest of the dam spillway. The FLUENT program was used to simulate the flow over the spillway. The free surface was calculated using the volume of fluid (VOF) method. To deal with turbulence, the SST k-ω turbulence model was used. The study showed that the spillway is capable of carrying the designed flood discharge and the modified conditions with negative pressure behind the gate and at some points along the spillway. Hydraulic jumps occur at various distances throughout the plunge pool depending on the incoming velocity in the flip bucket.
This research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing i
... Show MoreThis research represents a practical attempt applied to calibrate and verify a hydraulic model for the Blue Nile River. The calibration procedures are performed using the observed data for a previous period and comparing them with the calibration results while verification requirements are achieved with the application of the observed data for another future period and comparing them with the verification results. The study objective covered a relationship of the river terrain with the distance between the assumed points of the dam failures along the river length. The computed model values and the observed data should conform to the theoretical analysis and the overall verification performance of the model by comparing it with anothe
... Show MoreThis study aims at suggesting flow as a strategy for training female EFL student-teachers in the teaching training course and finding out the effect of this strategy on their performance and their flow state. The training course syllabuses will be constructed according to the flow nine factors and the teaching skills. The measurement tools are the student-teacher performance checklist that has already been used by the department of English language and SHORT Flow State Scale (S FSS-2). The study population is represented with the (60) female student-teachers/ fourth stage/ evening studies at theEnglish department /college of education for women/the University of Baghdad. The study is used the experimental design in that (30) of the student-
... Show MoreThe accounting system of government is considered an important tool to follow up the financial transactions that reflect the activities of governmental units and by which the useful information for estimating governmental annual revenues and expenditures are provided through the state public budget because it is an information system that provides detailed past performance, as well as measures the efficiency of the governmental agencies performance in implementing the budget, and the of success governmental units is measured through the type of services and programs offered, their size and the possibility of achieving the objectives assigned to them. The medical evacuation program is one of the medical and curative health services provid
... Show MorePlane cubics curves may be classified up to isomorphism or projective equivalence. In this paper, the inequivalent elliptic cubic curves which are non-singular plane cubic curves have been classified projectively over the finite field of order nineteen, and determined if they are complete or incomplete as arcs of degree three. Also, the maximum size of a complete elliptic curve that can be constructed from each incomplete elliptic curve are given.
Five sites were chosen to the north of Babil Governorate in order to identify the limnological features and the impact of the Hindiya Dam during 2019. Site2 was located near the dam to reflect the ecological features of this site, whereas other sites, S1 was located at the upstream of the dam as a control site. Moreover, the two other sites S3 and S4 were located down the dam. The results of the study showed a close correlation between air and water temperature at all sites. Also there were significant differences in average of thirteen out of eighteen water parameters.Water temperature, total alkalinity, bicarbonate, DO, POS, TH and Mg+2 ions decreased from 22.76˚C, 203.33 mg/L,
... Show MoreThe Halabja earthquake occurred on 12/11/2017 in Iraq, with a magnitude of 7.3 Mw, which happened in the Iraqi-Iranian borders. This earthquake killed and injured many people in the Kurdish region in the north of the country. There is no natural disaster more dangerous than earthquake, especially it occurs without warning, great attention must be paid to the impact of earthquakes on the soil and preparing for a wave of earthquakes. Numerical modeling using specific elements is considered a powerful tool to investigate the required behavior of structures in Geotechnical engineering, and the main objective of this is to assess the response of the Al-Wand dam to the Halabja earthquake, as this dam is located in an area that has been su
... Show MoreWe claim that a proper subact Ṅ have been compactly packed (c.P) in generalization idea of c.P modules to S Acts. whether for all family of prime subact {Pα}(α∈λ) for some β∈λ Pβ ⊇ Ṅ when ∪(α∈λ)Pα, ⊇ N. We refer to an S-Act Ṁ as c.P. if every subact is compactly packed. We study various properties of c.P S-Acts.
MDS code is a linear code that achieves equality in the Singleton bound, and projective MDS (PG-MDS) is MDS code with independents property of any two columns of its generator matrix. In this paper, elementary methods for modifying a PG-MDS code of dimensions 2, 3, as extending and lengthening, in order to find new incomplete PG-MDS codes have been used over . Also, two complete PG-MDS codes over of length and 28 have been found.
ABSTRACT In dam construction stages when an earth embankment has retained a reservoir with constant water surface elevation for a long time, seepage conditions within the embankment will be reach a steady state. If it is necessary to drain the reservoir quickly, the pore-water pressures in the embankment may remain relatively high while the stabling effect of the reservoir's weight along the upstream (U/S) side for the embankment has removed. This process is referring to as "Rapid Drawdown" and may be cause instability in the upstream (U/S) face of the embankment. Kongele dam is one of the proposed earth dams to be implement within the current plan in Iraq. The authors study pore water pressure and the effect of rapid drawdown for the dam d
... Show More