The Causes Influencing the Occurrence of Variation Orders in the Construction of Buildings
...Show More Authors

In the construction of buildings usually, problems occur because of the causes of change orders. The main causer of change orders is the owners, consultants, and contractors. These changes lead to conflicts among them which result in influencing building projects. Therefore, it is necessary to analyze the causes of change orders to reduce them and facilitate management. This paper determines the most critical factors that cause change orders from a different point of view, a consulting owner and a contractor, and a study of the reality of the management of change orders when constructing public buildings. The method employed in this research is a field survey using interviews with experts working in the construction of public buildings. Furthermore, the questionnaire was distributed manually and electronically.

In conclusion, it would appear that the causes of change orders have been hierarchically according to the viewpoint of the owner, contractor, and consultant. The analysis leads to the following conclusions: Agreement of viewpoints owners, contractors, and consultants on the critical causes of variation orders were: ( the difficult financial situation - change material specifications to benefit the project - technical necessity  - the nature of the site). Moreover, the point of view (owners and contractors) on the essential factors that cause change orders were: (preparing a bill of quantities is inaccurate - weak consultant guess ). In contrast, the consultant's point of view differs, as he considers these causes ineffective. It can be interpreted that the consultant sees these factors as insignificant because of his duty to implement the bill of quantities and designs. This research paper concludes that a complex causal relationship exists between the causes of change orders. The relative importance index (RII) for variation order causes varies among different groups' viewpoints (owners, contractors, and consultants).

Scopus Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Jun 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
The role of the learning organization in the behavior of the work teams \ exploratory research in the Rasheed Bank
...Show More Authors

This research aims to examine the relationship between learning organization and behavior of work teams. The variable of the learning organization took four dimensions depending on the study (sudhartna & Li, 2004): Common cultural values ​​, communication, knowledge transfer and the characteristics of workers. The behavior of teams was identified on the basis of realizing of the respondents of their organization to work as a team where the research relied concepts applied in the study (Hakim , 2005) , and chose to research the case of a service organization for the study and relied on four dimensions of coordination , cooperation , sharing of information , the performance of the team, and was a curriculum approach and des

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Thu Feb 24 2022
Journal Name
Journal Of Educational And Psychological Researches
The Role of the Faculty of Education in Serving the Community in the Light of the Vision of the Kingdom 2030 from the Faculty Members’ Point of View at the University of Jeddah
...Show More Authors

The study aimed at identifying the role of the Faculty of Education in the community service in light of vision of the Kingdom 2030 from the faculty members’ point of view at the University of Jeddah. The study used a descriptive method through a questionnaire administered to a sample of the faculty members.It concluded that the role of the College in serving the community is the development of the right habits in the family and the importance of establishing bridges of cooperation between the Faculty of Education and the surrounding environment and teaching special education teachers how to apply some methods of measurement to determine the needs of students with disabilities. The results also pointed out that there are no statistical

... Show More
View Publication Preview PDF
Publication Date
Thu May 02 2019
Journal Name
University Of Anbar Sport And Physical Education Sciences
The Effect of the Exercises of Retrieving the ball from the Net on the Development of the skill of Defending the stadium in the Volleyball
...Show More Authors

QA Sarhan, University of Anbar Sport and Physical Education Sciences, 2019

View Publication
Publication Date
Fri Apr 01 2016
Journal Name
Journal Of Engineering
A Program Applying Professional Safety Basics in Construction Projects
...Show More Authors

When industrial and  constructional renaissance started in the world, the great interest was going on towards the equipment’s,  which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry.

     The professional safety is concerned as restrict which

... Show More
View Publication Preview PDF
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Laboratory Investigation on Roller Compaction Technique in Concrete Construction
...Show More Authors

Roller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg a

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Mon Nov 09 2020
Journal Name
Construction Research Congress 2020
How to Improve Workforce Development and Sustainability in Construction
...Show More Authors

View Publication
Scopus (16)
Crossref (11)
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at cr

... Show More
View Publication
Crossref (9)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies l

... Show More
View Publication Preview PDF
Scopus (14)
Crossref (9)
Scopus Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering Science And Technology
GEOMETRIC NONLINEAR TIME DOMAIN SPECTRALMATCHING SEISMIC ANALYSIS OF BASE ISOLATED HIGHRISE BUILDINGS INCLUDING P-DELTA EFFECT
...Show More Authors

Time-domain spectral matching commonly used to define seismic inputs to dynamic analysis in terms of acceleration time history compatible with a specific target response spectrum is used in this study to investigate the second-order geometric effect of P-delta on the seismic response of base-isolated high-rise buildings. A synthetic time series is generated by adjusting reference time series that consist of available readings from a past earthquake of the 1940 El Centro earthquake adopted as an initial time series. The superstructure of a 20-story base isolated building is represented by a 3-D finite element model using ETABS software. The results of the base isolated building show that base isolation technique significantly reduces inter-s

... Show More
Publication Date
Tue Dec 22 2020
Journal Name
Lecture Notes In Civil Engineering
Geometric Nonlinear Synthetic Earthquake Analysis of Base Isolated Tall Steel Buildings Under Site-Specific Seismic Loading
...Show More Authors

View Publication
Scopus (2)
Crossref (1)
Scopus Crossref