The Causes Influencing the Occurrence of Variation Orders in the Construction of Buildings
...Show More Authors

In the construction of buildings usually, problems occur because of the causes of change orders. The main causer of change orders is the owners, consultants, and contractors. These changes lead to conflicts among them which result in influencing building projects. Therefore, it is necessary to analyze the causes of change orders to reduce them and facilitate management. This paper determines the most critical factors that cause change orders from a different point of view, a consulting owner and a contractor, and a study of the reality of the management of change orders when constructing public buildings. The method employed in this research is a field survey using interviews with experts working in the construction of public buildings. Furthermore, the questionnaire was distributed manually and electronically.

In conclusion, it would appear that the causes of change orders have been hierarchically according to the viewpoint of the owner, contractor, and consultant. The analysis leads to the following conclusions: Agreement of viewpoints owners, contractors, and consultants on the critical causes of variation orders were: ( the difficult financial situation - change material specifications to benefit the project - technical necessity  - the nature of the site). Moreover, the point of view (owners and contractors) on the essential factors that cause change orders were: (preparing a bill of quantities is inaccurate - weak consultant guess ). In contrast, the consultant's point of view differs, as he considers these causes ineffective. It can be interpreted that the consultant sees these factors as insignificant because of his duty to implement the bill of quantities and designs. This research paper concludes that a complex causal relationship exists between the causes of change orders. The relative importance index (RII) for variation order causes varies among different groups' viewpoints (owners, contractors, and consultants).

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Sun Jan 01 2012
Journal Name
Conference
Identifying Causes of Variation in Construction Industry Based on Questionnaire
...Show More Authors

Publication Date
Sat May 01 2021
Journal Name
Journal Of Engineering
Variation Orders and Their Effects of Erbil Governorate Projects
...Show More Authors

Variation order plays an important role in calculating the final cost and time. The paper aims to determine the causes of variation orders in projects performed between 2007-2014 in Erbil governorate projects. Data was collected from contract documents. Performed in the Erbil governorate projects from 2007-2014. The study seeks to identify the most significant causes of delays by assessing the common causes of delays in terms of frequency, severity and 

important indices of owners, consultants and contractors related to&n

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Feb 12 2022
Journal Name
Engineering, Technology & Applied Science Research
Investigating the Causes of Poor Cost Control in Iraqi Construction Projects
...Show More Authors

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuat

... Show More
View Publication
Crossref (6)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of The Mechanical Behavior Of Materials
Identification of the main causes of risks in engineering procurement construction projects
...Show More Authors
Abstract<p>Many risks have adverse consequences for construction projects’ objectives such as quality, schedule, and cost. As engineering procurement construction (EPC) contracts gradually become one of the most common types used in implementing major large-scale construction projects, identifying common risk types and analyzing their root causes is important for developing measures to decrease and eliminate future risks in these types of contracts. The information about the main causes of risks was collected <italic>via</italic> well-structured questionnaires addressed to construction sector professionals and preparing lists of main potential risks in EPC/construction projects throu</p> ... Show More
View Publication
Crossref (1)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Ssrn Electronic Journal
Diagnoses of Delay Causes in Construction Projects During Disaster
...Show More Authors

Purpose: The aim of this study was to gain insight into causes of time delays and cost overruns in a selection of thirty case projects in Iraq. Delay factors have been studied in many countries/contexts, but not much data exists from countries under the conditions characterizing Iraq during the last 10-15 years.Design/methodology/approach: A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. For the case of the study, the participants in the projects provided data about the projects through the data collection tool distributed through the questionnaire directed to them. Statistical data analysis was used to build statistical relationships between time and cost d

... Show More
View Publication
Crossref
Publication Date
Sat Jun 30 2018
Journal Name
Proceedings Of The International Conference On Intelligent Science And Technology
The nature of intelligent system in buildings
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Wed Jul 05 2017
Journal Name
International Journal Of Science And Research (ijsr)
Assessing BIM Integration with Sustainable Requirement for Buildings Construction
...Show More Authors

View Publication
Crossref (4)
Crossref
Publication Date
Thu Apr 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
Using Project Management Maturity Model to Evaluate Construction Sector -Organizations. Case Study at the Department of buildings - Karkh first
...Show More Authors

The education sector suffers from many problems, including the scarcity of schools that can absorb the increasing number of students in light of the increasing population growth rate, as some regions suffer from a lack of opening of new schools or the expansion of existing schools to increase their capacity so that attention is required. The research sought to identify the level of maturity of project management at the research site (Building Department in Al-Karkh I/ Ministry of Education) Being responsible for educational projects and their implementation and to know that, the ten areas of the knowledge guide to project management PMBOK have been adopted according to the PM3 model (one of the models of maturity

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Aug 01 2020
Journal Name
Iop Conference Series: Materials Science And Engineering
Using BIM for Optimizing the Upgrading Cost to Convert the Traditional Buildings to Sustainable Buildings in Iraq
...Show More Authors
Abstract<p>A high percentage of existing buildings in Iraq are traditional buildings, yet there is approximately no such green building in Baghdad or other governorates. Most of these buildings require urgent upgrading to increase their performance (operationally, economically, and environmentally), also the building owners looking for identifying and implementing many of the green building measures to reduce the operational and maintenance costs of their buildings. The decision-makers need to support the possibility of achieving sustainable measures of existing building rating systems such as LEED or BREEAM, and that would require an optimization model. The goal of this study is to maximize the</p> ... Show More
View Publication
Scopus (3)
Crossref (3)
Scopus Crossref