Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine whether the overrun of project cost and schedule significantly varied depending on project type, size, duration, location, and awarded years. The findings indicated that cost overruns are very common due to variation orders. 95.6% of the projects were studied being impacted, and overrun in project cost are also huge, with 16%. Time also overruns more common than cost overruns due to the variation orders. 98.7% of the projects were studied in Sulaimani were affected by time overrun with an average of 46.3% of initial duration observed. Findings also indicated that two out of five parameters measured in the analysis had a significant correlation with project cost overruns. Three out of five considered variables correlated with construction time overruns. 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Dec 22 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Cost Management of construction industries according to the fast-track method
...Show More Authors

Construction projects have become a changing dramatically in recent decades and that the goal of the beneficiaries of the implementation of structural project is to complete the work with less time and within the cost of the specific and the best possible quality may sometimes happen that highlights the importance of time on the rest of the items at the implementation of projects for various reasons, including the need to use the project as soon as possible possible change rapidly to customer's requests, but the high cost of the project represents the biggest obstacle for entrepreneurs with its effects on the quality and the time workers, and is a measure of those elements in monetary terms is the key to integration between them, so the

... Show More
View Publication Preview PDF
Publication Date
Thu Dec 31 2020
Journal Name
College Of Islamic Sciences
: Islamic law; perfection The rule of perfection in Islamic law and its impact on the creative construction of the individual and society: The rule of perfection in Islamic law and its impact on the creative construction of the individual and society
...Show More Authors

This research explains to us the role of the Islamic religion in the issue of accuracy in speech and work, and how it is closely related to human production in his life, and Islam affirms that his idea is mainly reflected in his production, and how it affects the perception of the meaning of creativity. Therefore, our Islam affirmed the accuracy in every word or work we do to build a society in which people enjoy high quality in ethics and dedication in their work so that the Islamic system depends on humanity to preserve our rights on the other hand the research discusses the deliberate default and how it reflects on our production and how it makes it less good.

View Publication Preview PDF
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq
...Show More Authors

Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public a

... Show More
View Publication Preview PDF
Publication Date
Sun Mar 15 2020
Journal Name
Al-academy
Time and Design Construction for Costumes in the Iraqi Theater Show: محمــود جبــاري حــافظ
...Show More Authors

The theatre costume with the rest of the theatre show elements constitute a system of the meaning relations that produce a visual image that helps the recipient to decipher the theatre scene, let alone the manifestation of time in its levels (past, present, future) through the design construction of the theatre elements among which is the theatre costume. In order to know the way of manifesting time through the formulation of the theatre costumes, the research question has been put as follows:  how to manifest time through the design construction for the theatre costumes unit, from which the research objective is derived as follows: Revealing the possibility of the designing unit of the costumes in manifesting the levels of time wit

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
E3s Web Of Conferences
Comparing the Design Alternatives Using Building Information Model (BIM) and Constructability in Iraqi Construction Projects
...Show More Authors

The Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After tha

... Show More
View Publication
Scopus Crossref
Publication Date
Wed Jul 01 2020
Journal Name
Journal Of Engineering
Examining sensitivity of financial performance at construction projects prequalification stage
...Show More Authors

Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial ‎requirements restrict the ‎contractors to meet minimum limits in financial criteria such as net worth, working capital and ‎annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Feb 01 2015
Journal Name
Journal Of Engineering
Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area
...Show More Authors

This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project.  Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.

... Show More
View Publication Preview PDF
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Application of Geographic Information System for Preparing the Bill of Quantities of Construction Projects
...Show More Authors

The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
An Applying the Delphi Technique for Eliciting Criteria in Equipment and Materials Used in Highway Construction Projects
...Show More Authors

This article aims to establish and evaluate standards for critical equipment and materials in highway projects in Iraq. Delphi technique has been used to analyze, explore, and discover the main criteria and sub-criteria that affect equipment and materials in highway construction projects in Iraq. To determine the correct response to the criteria presented in this study, a program (IBM, SPSS/V25) was used to assess the main criteria and sub-criteria using the mean score (MS) and standard deviation (SD) technique, as well as to check reliability using Cronbach's alpha factor (α). The experts' qualifications and the extent to which the person is ready to commit are both important factors in panel selection. The design of a

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Tue Nov 06 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Assessment of Factors Contributing to Abdominal Post-Operative Wound Infections in Sulaimani Teaching Hospital
...Show More Authors

Objectives: The study aims to assess some of the contributing factors to abdominal postoperative wound infection and
to find out the relationship between postoperative wound infections and some socio-demographic characteristics such as
age, gender, level of education, occupation and residential area.
Methodology: A descriptive study was carried out in Sulaimani Teaching Hospital (Kurdistan Region). The study has
started from January 15th up to October 31th, 2009. To achieve the study objectives, a purposive "non probability"
sample of (100) patients who have abdominal postoperative wound infection, Adult female and male patients who were
admitted to Sulaimani Teaching Hospital was selected.
The data were collected th

... Show More
View Publication Preview PDF