Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine whether the overrun of project cost and schedule significantly varied depending on project type, size, duration, location, and awarded years. The findings indicated that cost overruns are very common due to variation orders. 95.6% of the projects were studied being impacted, and overrun in project cost are also huge, with 16%. Time also overruns more common than cost overruns due to the variation orders. 98.7% of the projects were studied in Sulaimani were affected by time overrun with an average of 46.3% of initial duration observed. Findings also indicated that two out of five parameters measured in the analysis had a significant correlation with project cost overruns. Three out of five considered variables correlated with construction time overruns.
This article aims to establish and evaluate standards for critical equipment and materials in highway projects in Iraq. Delphi technique has been used to analyze, explore, and discover the main criteria and sub-criteria that affect equipment and materials in highway construction projects in Iraq. To determine the correct response to the criteria presented in this study, a program (IBM, SPSS/V25) was used to assess the main criteria and sub-criteria using the mean score (MS) and standard deviation (SD) technique, as well as to check reliability using Cronbach's alpha factor (α). The experts' qualifications and the extent to which the person is ready to commit are both important factors in panel selection. The design of a
... Show MoreIn this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the
... Show MoreThe research aims to show the role or extent of the impact of financing in its various forms on the municipal performance before and after the financial deficit through relying on the analytical research methodology of the research community represented by the Directorate General of Municipalities and the Directorate of Maysan municipalities as a sample of research (13) municipal institutions for a period of (8) years, Considering the completion of the final accounts of these years, which provides the necessary data for the study, in addition to the variation in the quality and amounts of grants allocated to municipal institutions during these years, which gives a clearer and more comprehensive picture of the reality of allocatio
... Show MoreDiscrete Krawtchouk polynomials are widely utilized in different fields for their remarkable characteristics, specifically, the localization property. Discrete orthogonal moments are utilized as a feature descriptor for images and video frames in computer vision applications. In this paper, we present a new method for computing discrete Krawtchouk polynomial coefficients swiftly and efficiently. The presented method proposes a new initial value that does not tend to be zero as the polynomial size increases. In addition, a combination of the existing recurrence relations is presented which are in the n- and x-directions. The utilized recurrence relations are developed to reduce the computational cost. The proposed method computes app
... Show MoreTotal quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. &n
... Show MoreIn Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due
... Show MoreThis research examines the impact of construction technology systems in contemporary architectural production through the study of the evolution in it systems, construction materials and methods of construction in addition to the digital revolution which provided possibilities of structural and architectural design in creating a distinct architectural product, as considered construction systems technology is the source of creativity in the architectural product, the research is assumed that the construction systems technology have achieved a structural innovation in production through the materials and methods of construction and digital design.
For Long time technology was connected to the
Software cost management is a significant feature of project management. As such, it needs to be employed in a project or line of work. Software cost management is integral to software development failures, which, in turn, cause software failure. Thus, it is imperative that software development professionals develop their cost management skills to deliver successful software projects. The aim of this study is to examine the impact of cost management success factors with project management factors and three agile methodologies – Extreme Programming (XP), Scrum and Kanban methodologies which are used in the Pakistani software industry. To determine the results, the researchers applied quantitative approach through an extensive survey on
... Show MoreThe research problem is that most of the construction projects exceed the planned value, due to the failure to implement the plans on time. The current study aims to monitor the implementation of the project and for each of the executed tasks of the table of quantities in order to detect deviations at the time they occur, evaluate the time and cost performance, and then identify the areas of waste and analyze the implementation of each task in order to diagnose the underlying problems and find possible and applicable solutions in the environment Iraqi. The research was applied in one of the companies specialized in the field of construction projects, and one of the most important conclusions reached is the possibility of applying
... Show More