Scheduling problems have been treated as single criterion problems until recently. Many of these problems are computationally hard to solve three as single criterion problems. However, there is a need to consider multiple criteria in a real life scheduling problem in general. In this paper, we study the problem of scheduling jobs on a single machine to minimize total tardiness subject to maximum earliness or tardiness for each job. And we give algorithm (ETST) to solve the first problem (p1) and algorithm (TEST) to solve the second problem (p2) to find an efficient solution.
The aim of the research is to identify the relationship between health anxiety associated with Coronavirus (Covid 19) and its relationship to health behavior among Baghdad University employees, as well as to identify the differences in health anxiety and health behavior according to the variables (gender, occupation, and age). To achieve the objectives of the research, a scale was designed to measure the health anxiety in addition to the adoption of the health behavior scale prepared by (Renner & Schwarzer, 2005). The two scales were applied to a sample of (277) academics and (206) employees, while the number of students was (667). The sample was chosen by electronic application from a number of colleges at Al-Jadiriyah Complex. Afte
... Show MoreThe Current Research Seeks To Identify The Possibility Of Unifying The Private Drinking Stations In The Session In A Single Station In Order To Prevent Pollution. In Order To Achieve The Goal Of The Current Research, The Researcher Followed The Descriptive Survey Approach. The Researcher Identified The Research Community As Working In Institutions Related To Drinking Water Filtering In The Governorate Of Baghdad, And In Order To Collect Data And Information Necessary To Answer The Study's Question (Is It Possible To Supply Private Drinking Stations With One Station?) Researcher Designed A Questionnaire Consisting Of (10) Paragraphs Measuring Aspects Of This Topic, And Applied It To A Sample Of Employees And Workers Amounted To (200) People,
... Show MoreA high percentage of existing buildings in Iraq are traditional buildings, yet there is approximately no such green building in Baghdad or other governorates. Most of these buildings require urgent upgrading to increase their performance (operationally, economically, and environmentally), also the building owners looking for identifying and implementing many of the green building measures to reduce the operational and maintenance costs of their buildings. The decision-makers need to support the possibility of achieving sustainable measures of existing building rating systems such as LEED or BREEAM, and that would require an optimization model. The goal of this study is to maximize the
Abstract
The common types of movement disorders are ; dystonia which is a syndrome of repetitive muscle contractions. While , Huntington disease is autosomal dominant progressive neurodegenerative disorder, which is characterized by involuntary movements (“chorea”).
Tetrabenazine therapy has been shown to effectively control this movements compared with placebo.
Design the proper dosing approach for patients treated with tetrabenazine with genotype polymorphisms and their hepatic effect on patients.
A prospective case controlled study was carried on 50 patients whom divided into 2 groups :first group involved 25 patients who had cho
... Show MoreEach sport has its own energy requirements that differ from the energy requirements of other sports, and a different method is used in each of them, so the trainer must first rely on the principle of privacy in training first, that is, privacy according to the working energy system, that is, he defines the controlling energy system In that event, and how the muscles use the available energy to perform according to the energy production systems. As we find the serving skill is the first volleyball skill with which the team starts the match in order to be able to gain points directly, through knowledge it turns out that there is a weakness in the skill performance, especially the skill of serving and being The key to victory for volle
... Show MoreFlow-production systems whose pieces are connected in a row may not have maintenance scheduling procedures fixed because problems occur at different times (electricity plants, cement plants, water desalination plants). Contemporary software and artificial intelligence (AI) technologies are used to fulfill the research objectives by developing a predictive maintenance program. The data of the fifth thermal unit of the power station for the electricity of Al Dora/Baghdad are used in this study. Three stages of research were conducted. First, missing data without temporal sequences were processed. The data were filled using time series hour after hour and the times were filled as system working hours, making the volume of the data relativel
... Show MoreFlexible job-shop scheduling problem (FJSP) is one of the instances in flexible manufacturing systems. It is considered as a very complex to control. Hence generating a control system for this problem domain is difficult. FJSP inherits the job-shop scheduling problem characteristics. It has an additional decision level to the sequencing one which allows the operations to be processed on any machine among a set of available machines at a facility. In this article, we present Artificial Fish Swarm Algorithm with Harmony Search for solving the flexible job shop scheduling problem. It is based on the new harmony improvised from results obtained by artificial fish swarm algorithm. This improvised solution is sent to comparison to an overall best
... Show MoreIn this paper, two of the local search algorithms are used (genetic algorithm and particle swarm optimization), in scheduling number of products (n jobs) on a single machine to minimize a multi-objective function which is denoted as (total completion time, total tardiness, total earliness and the total late work). A branch and bound (BAB) method is used for comparing the results for (n) jobs starting from (5-18). The results show that the two algorithms have found the optimal and near optimal solutions in an appropriate times.