Scheduling problems have been treated as single criterion problems until recently. Many of these problems are computationally hard to solve three as single criterion problems. However, there is a need to consider multiple criteria in a real life scheduling problem in general. In this paper, we study the problem of scheduling jobs on a single machine to minimize total tardiness subject to maximum earliness or tardiness for each job. And we give algorithm (ETST) to solve the first problem (p1) and algorithm (TEST) to solve the second problem (p2) to find an efficient solution.
Abstract
Disturbs the social system in any society specially in Iraq other than
other Islamic and Arabic countries. That is according to the abnormal
conditions that Iraq has past through as wars and blockage, and lastly the
invasion. Therefore it has been necessary to put this phenomenon under
study and analysis to discover Juvenile Delinquency is one of the most
prominent social phenomenon that the important reasons behind it, and trying
to treat what can be treated of the effects of it upon society.
This study is mainly concerned with the explaining the social factors
leading toward juvenile delinquency trying to crystallize the problem of the
study in the following question: (What are the psychological,
The Voluntary Obedience has great importance for the modern taxes systems and its management and this is meant the taxpayer whom in charge to pay of his taxes obligations voluntarily , he is very known of himself whereas he prepared his finishing accountings and present them as samples prepared by taxes management and settle the tax sum directly according to specified income , which has an impact to find end to tax evasion as result lead to increase the tax income and achieve the justice for the taxpayer and the state treasury
The advancements in horizontal drilling combined with hydraulic fracturing have been historically proven as the most viable technologies in the exploitation of unconventional resources (e.g., shale and tight gas reservoirs). However, the number of fractures, well timing, and arrangement pattern can have a significant impact on the project economy. Therefore, such design and operating parameters need to be efficiently optimized for obtaining the best production performance from unconventional gas reservoirs. In this study, the process of selecting the optimal number of fractures was conducted on a section of a tight gas reservoir model (based on data from the Whicher Range (WR) tight gas field in Western Australia). Then, the optimal number
... Show MoreThe Twofish cipher is a very powerful algorithm with a fairly complex structure that permeates most data parsing and switching and can be easily implemented. The keys of the Twofish algorithm are of variable length (128, 192, or 256 bits), and the key schedule is generated once and repeated in encrypting all message blocks, whatever their number, and this reduces the confidentiality of encryption. This article discusses the process of generating cipher keys for each block. This concept is new and unknown in all common block cipher algorithms. It is based on the permanent generation of sub keys for all blocks and the key generation process, each according to its work. The Geffe's Generator is used to generate subkeys to make eac
... Show MoreNowadays, cloud computing has attracted the attention of large companies due to its high potential, flexibility, and profitability in providing multi-sources of hardware and software to serve the connected users. Given the scale of modern data centers and the dynamic nature of their resource provisioning, we need effective scheduling techniques to manage these resources while satisfying both the cloud providers and cloud users goals. Task scheduling in cloud computing is considered as NP-hard problem which cannot be easily solved by classical optimization methods. Thus, both heuristic and meta-heuristic techniques have been utilized to provide optimal or near-optimal solutions within an acceptable time frame for such problems. In th
... Show MoreIn this work, the relationship between the ionospheric parameters (Maximum Usable Frequency (MUF), Lowest Usable Frequency (LUF) and Optimum working Frequency (OWF)) has been studied for the ionosphere layer over the Iraqi zone. The capital Baghdad (44.42oE, 33.32oN) has been selected to represent the transmitter station and many other cities that spread over Iraqi region have represented as receiver stations. The REC533 communication model considered as one of the modern radio broadcasting version of ITU has been used to calculate the LUF parameter, while the MUF and OWF ionospheric parameters have been generated using ASAPS international communication model which represents one of the most advanced and accurate HF sky wave prop
... Show MoreIn this work, the relationship between the ionospheric parameters (Maximum Usable Frequency (MUF), Lowest Usable Frequency (LUF) and Optimum working Frequency (OWF)) has been studied for the ionosphere layer over the Iraqi zone. The capital Baghdad (44.42oE, 33.32oN) has been selected to represent the transmitter station and many other cities that spread over Iraqi region have represented as receiver stations. The REC533 communication model considered as one of the modern radio broadcasting version of ITU has been used to calculate the LUF parameter, while the MUF and OWF ionospheric parameters have been generated using ASAPS international communication model which represents one of the most advanced and
... Show MoreIn this paper, we will illustrate a gamma regression model assuming that the dependent variable (Y) is a gamma distribution and that it's mean ( ) is related through a linear predictor with link function which is identity link function g(μ) = μ. It also contains the shape parameter which is not constant and depends on the linear predictor and with link function which is the log link and we will estimate the parameters of gamma regression by using two estimation methods which are The Maximum Likelihood and the Bayesian and a comparison between these methods by using the standard comparison of average squares of error (MSE), where the two methods were applied to real da
... Show MoreA (k,n)-arc A in a finite projective plane PG(2,q) over Galois field GF(q), q=p⿠for same prime number p and some integer n≥2, is a set of k points, no n+1 of which are collinear. A (k,n)-arc is complete if it is not contained in a(k+1,n)-arc. In this paper, the maximum complete (k,n)-arcs, n=2,3 in PG(2,4) can be constructed from the equation of the conic.