Preferred Language
Articles
/
jih-3094
Solving the Multi-criteria, Total Completion Time, Total Earliness Time, and Maximum Tardiness Problem
...Show More Authors

Machine scheduling problems (MSP) are     considered as one of the most important classes of combinatorial optimization problems. In this paper, the problem of job scheduling on a single machine is studied to minimize the multiobjective and multiobjective objective function. This objective function is: total completion time, total lead time and maximum tardiness time, respectively, which are formulated as  are formulated. In this study, a mathematical model is created to solve the research problem. This problem can be divided into several sub-problems and simple algorithms have been found to find the solutions to these sub-problems and compare them with efficient solutions. For this problem, some rules that provide efficient solutions have been proved and some special cases have been introduced and proved since the problem is an NP-hard problem to find some efficient solutions that are efficient for the discussed problem 1// and good or optimal solutions for the multi-objective functions 1// ,, and emphasize the importance of the dominance rule (DR), which can be applied to this problem to improve efficient solutions.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Dec 01 2018
Journal Name
Al-khwarizmi Engineering Journal
Time Series Analysis of Total Suspended Solids Concentrations in Euphrates River in Al-Nasria Province
...Show More Authors

The monthly time series of the Total Suspended Solids (TSS) concentrations in Euphrates River at Nasria was analyzed as a time series. The data used for the analysis was the monthly series during (1977-2000).

The series was tested for nonhomogenity and found to be nonhomogeneous. A significant positive jump was observed after 1988. This nonhomogenity was removed using a method suggested by Yevichevich (7). The homogeneous series was then normalized using Box and Cox (2) transformation. The periodic component of the series was fitted using harmonic analyses, and removed from the series to obtain the dependent stochastic component. This component was then modeled using first order autoregressive model (Markovian chain). The above a

... Show More
View Publication Preview PDF
Publication Date
Mon Mar 07 2016
Journal Name
Iraqi Journal Of Market Research And Consumer Protection
Total Quality Management in the Qur'an: Total Quality Management in the Qur'an
...Show More Authors

The aim of this research is to clarify the importance of total quality management. Total quality management considered as a cultural process covering the various aspects of activities in society that helps human well-being, as well as the development of its efficiency and ability. They also have an effective role in achieving the desired goals that will benefit humanity. The concept of total quality management in the Qur'an is a broad, comprehensive and well integrated concept that aims to improve human life economically and socially. Quality in the Qur'an is a mean to achieve human beings happiness.
In this research we will highlight a successful story of quality management from Qur'an that ensures consumer protection and support of

... Show More
View Publication Preview PDF
Publication Date
Tue Jun 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
Using The Maximum Likelihood And Bayesian Methods To Estimate The Time-Rate Function Of Earthquake Phenomenon
...Show More Authors

In this research, we dealt with the study of the Non-Homogeneous Poisson process, which is one of the most important statistical issues that have a role in scientific development as it is related to accidents that occur in reality, which are modeled according to Poisson’s operations, because the occurrence of this accident is related to time, whether with the change of time or its stability. In our research, this clarifies the Non-Homogeneous hemispheric process and the use of one of these models of processes, which is an exponentiated - Weibull model that contains three parameters (α, β, σ) as a function to estimate the time rate of occurrence of earthquakes in Erbil Governorate, as the governorate is adjacent to two countr

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Mar 08 2021
Journal Name
Baghdad Science Journal
using collocation method for solving differential equations with time lag
...Show More Authors

in this paper the collocation method will be solve ordinary differential equations of retarted arguments also some examples are presented in order to illustrate this approach

View Publication Preview PDF
Publication Date
Mon Jan 20 2020
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Genetic Algorithm and Particle Swarm Optimization Techniques for Solving Multi-Objectives on Single Machine Scheduling Problem
...Show More Authors

In this paper, two of the local search algorithms are used (genetic algorithm and particle swarm optimization), in scheduling number of products (n jobs) on a single machine to minimize a multi-objective function which is denoted as  (total completion time, total tardiness, total earliness and the total late work). A branch and bound (BAB) method is used for comparing the results for (n) jobs starting from (5-18). The results show that the two algorithms have found the optimal and near optimal solutions in an appropriate times.

View Publication Preview PDF
Crossref
Publication Date
Sun Aug 24 2014
Journal Name
Wireless Personal Communications
Multi-layer Genetic Algorithm for Maximum Disjoint Reliable Set Covers Problem in Wireless Sensor Networks
...Show More Authors

View Publication
Scopus (22)
Crossref (14)
Scopus Clarivate Crossref
Publication Date
Sun Aug 01 2021
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Novel Heuristic Approach for Solving Multi-objective Scheduling Problems
...Show More Authors

    In this paper, we studied the scheduling of  jobs on a single machine.  Each of n jobs is to be processed without interruption and becomes available for processing at time zero. The objective is to find a processing order of the jobs, minimizing the sum of maximum earliness and maximum tardiness. This problem is to minimize the earliness and tardiness values, so this model is equivalent to the just-in-time production system. Our lower bound depended on the decomposition of the problem into two subprograms. We presented a novel heuristic approach to find a near-optimal solution for the problem. This approach depends on finding efficient solutions for two problems. The first problem is minimizing total completi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Nov 02 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Total Protein and Total Fucose in Sera of Patients with Thyroid Dysfunction and Control
...Show More Authors

Total protein and total fucose were determined in sera of thyroid

disorder patients.

Sera of (40) diagnosed by consultant hyperthyroidism, and 40 hypothyroidism  were analyzed  for  the above  parameter  for  control, sera of (40) normal individuals were used.

They   were   healthy   with    no  appearing   disorder   results   analysis revealed  no significant  differences  (P<0.05)  in  the (mean  Â±SD)  of total   protein   values  in   sera  of   hyper  and   hypothyroidism   were compared

... Show More
View Publication Preview PDF
Publication Date
Wed Apr 01 2015
Journal Name
Mathematical Methods In The Applied Sciences
An inverse problem of finding the time-dependent diffusion coefficient from an integral condition
...Show More Authors

View Publication
Scopus (28)
Crossref (21)
Scopus Clarivate Crossref
Publication Date
Wed Mar 29 2023
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Multi-Stage Hydraulic Fracturing Completion Design Based on Ball-and-Sleeve Method
...Show More Authors

This paper proposes a completion that can allow fracturing four zones in a single trip in the well called “Y” (for confidential reasons) of the field named “X” (for confidential reasons). The steps to design a well completion for multiple fracturing are first to select the best completion method then the required equipment and the materials that it is made of. After that, the completion schematic must be drawn by using Power Draw in this case, and the summary installation procedures explained. The data used to design the completion are the well trajectory, the reservoir data (including temperature, pressure and fluid properties), the production and injection strategy. The results suggest that multi-stage hydraulic fracturing can

... Show More
View Publication Preview PDF
Crossref