Preferred Language
Articles
/
jih-1654
Optimum Time Schedule for Industrial Processes (II)
...Show More Authors

The  present study  deals  with successive  stages  of  productive

operations happened to produce a production within each stage befo re it  moves to the next one. ll cou ld  be deduced that this study is an extension  to what bas  been mentioned  in (1 ) .ln  (I),  the  optimum distribution of  di!Terent jobs of  workers and  machines  in  the productive operations has been st ud ied whi le the study  invol ves the optimum schedule for the succession of these operations presuming that thay have already been distributed on machines and workers (2).A mathematical form has been put for this study to define the "Object.ive Function " where the total work could be performed in the shortest time.

The incapability of tackling two works at same time by the workers

and machines,  and the inabi lity of beginning a new stage before the end of the precedi ng one, both were taken i nto consideration  . These conditions were put in such mathematical forms as - conditions - for the - Optimization Problem -.

The above mentioned operation was gcnerall y fonned  where iL   :an be  applied  lor  the optimum schedule  to  pursue operations  in  the

productive ones.

Then,  the virtual  application  in  printing which  has  already  been

displayed  in (I) as a  sample for  the optimum distribution  in  the productive operations.

The data gained in (I) "ere used as (inputs ) for the problem being solved.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Oct 02 2016
Journal Name
Journal Of Educational And Psychological Researches
The relationship between Intrinsic Motivation Academy and Time Management among University students
...Show More Authors

study aimed to recognize The relationship between Intrinsic Motivation Academy and Time Management among University students and measure Intrinsic Motivation Academy And Time Management for sample and Balancing Degrees of Basic Research on the two scales According to the Variable genders and Specialization, The sample consisted (350) students by (230) female (120) male , and the sample  responded scales of Intrinsic Motivation Academy for (Alwan & Attaat2009) and Time Management (Building tool), The Results of this study show that: There are statistically significant differences according to gender variable in Intrinsic Motivation Academy and Time Management in favor of the male, and there are statistica

... Show More
View Publication Preview PDF
Publication Date
Sun Sep 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
The Use of Replacement Models On Determine the Optimal Time to Replacement
...Show More Authors

Abstract:-

            The approach maintenance and replacement one of techniques of operations research whom cares of the failure experienced by a lot of production lines which consist of a set of machines and equipment, which in turn exposed to the failure or work stoppages over the lifetime, which requires reducing the working time of these machines or equipment below what can or conuct  maintenance process once in a while or a replacement for one part of the machine or replace one of the machines in production lines. In this research is the study of the failure s that occur in some parts of one of the machines for the General Company for Vege

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jul 01 2020
Journal Name
2020 42nd Annual International Conference Of The Ieee Engineering In Medicine & Biology Society (embc)
Recurrent Fusion of Time-Domain Descriptors Improves EMG-based Hand Movement Recognition
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Wed Jun 18 2025
Journal Name
Journal Of Physical Education
A Study of Actual Training Time Administration in Bedra Specialized Weightlifting Club
...Show More Authors

View Publication
Publication Date
Wed Jun 27 2018
Journal Name
Iraqi Journal Of Science
Accurate Three Dimensional Coordinates Measurements Using Differential GPS Real Time Kinematic Mode
...Show More Authors

The accurate 3-D coordinate's measurements of the global positioning systems are essential in many fields and applications. The GPS has numerous applications such as: Frequency Counters, Geographic Information Systems, Intelligent Vehicle Highway Systems, Car Navigation Systems, Emergency Systems, Aviations, Astronomical Pointing Control, and Atmospheric Sounding using GPS signals, tracking of wild animals, GPS Aid for the Blind, Recorded Position Information, Airborne Gravimetry and other uses. In this paper, the RTK DGPS mode has been used to create precise 3-D coordinates values for four rover stations in Baghdad university camp. The HiPer-II Receiver of global positioning system was used to navigate the coordinate value. The results wil

... Show More
View Publication Preview PDF
Scopus (3)
Scopus Crossref
Publication Date
Wed Jan 01 2020
Journal Name
Journal Of Mechanical Engineering Research And Developments
Real-time control of robotic hand by human hand at low cost
...Show More Authors

Scopus (3)
Scopus
Publication Date
Thu May 07 2015
Journal Name
Journal Of Infrared, Millimeter, And Terahertz Waves
Distinguishing Gasoline Engine Oils of Different Viscosities Using Terahertz Time-Domain Spectroscopy
...Show More Authors

View Publication
Scopus (27)
Crossref (24)
Scopus Clarivate Crossref
Publication Date
Fri Apr 01 2016
Journal Name
Communications In Nonlinear Science And Numerical Simulation
Simultaneous determination of time and space-dependent coefficients in a parabolic equation
...Show More Authors

View Publication
Scopus (22)
Crossref (11)
Scopus Clarivate Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu Mar 01 2018
Journal Name
Tribology International
Discriminating gasoline fuel contamination in engine oil by terahertz time-domain spectroscopy
...Show More Authors

View Publication
Scopus (15)
Crossref (13)
Scopus Clarivate Crossref