Preferred Language
Articles
/
jeasiq-2231
Planning the Production of the Electrical Distribution Converter (400KV/11) Using Time Series Methods and Goal Programming in the Fuzzy Environment
...Show More Authors

This Paper aims to plan the production of the electrical distribution converter (400 KV/11) for one month at Diyala Public Company and with more than one goal for the decision-maker in a fuzzy environment. The fuzzy demand was forecasting using the fuzzy time series model. The fuzzy lead time for raw materials involved in the production of the electrical distribution converter (400 KV/11) was addressed using the fuzzy inference matrix through the application of the matrix in Matlab, and since the decision-maker has more than one goal, so a mathematical model of goal programming was create, which aims to achieve two goals, the first is to reduce the total production costs of the electrical distribution converter (400 KV/11) and the second is to maximize the amount produced from them, where the fuzzy data of the mathematical model were processed using the ranking function. Through the results obtained to solve the mathematical model using the Lingo program, we find that the mathematical model has achieved both objectives, i.e. reduce the total production costs of the main product to less than (4464254500) Iraqi dinars and maximize the amount produced from the main product for more than (17000) parts per month

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Sep 30 2017
Journal Name
Al-khwarizmi Engineering Journal
Travel Time Prediction Models and Reliability Indices for Palestine Urban Road in Baghdad City
...Show More Authors

Abstract

     Travel Time estimation and reliability measurement is an important issues for improving operation efficiency and safety of traffic roads networks. The aim of this research is the estimation of total travel time and distribution analysis for three selected links in Palestine Arterial Street in Baghdad city. Buffer time index results in worse reliability conditions. Link (2) from Bab Al Mutham intersection to Al-Sakara intersection produced a buffer index of about 36%  and 26 % for Link (1) Al-Mawall intersection to Bab Al- Mutham intersection and finally for link (3) which presented a 24% buffer index. These illustrated that the reliability get worst for link

... Show More
View Publication Preview PDF
Crossref (11)
Crossref
Publication Date
Sun Dec 16 2018
Journal Name
Al-academy
The Overlap of Visions between the Scenographer and the Director in the Theatrical Show
...Show More Authors

After the spread of the function of the scenographer in the modern theater, his vision has become present in most of the theatrical works and because the director is the master of the work and the owner of the vision that appears in front of the audience, the overlap between the visions of each of them was required. This research is an attempt to detect the overlap and disengagement in the work of each of them.
The research is divided into a methodological framework that included the research problem, importance, limits, and purpose, and then the definition of terms. In the theoretical framework, the research dealt with two theoretical sections that pave the way for raising ideas related to this subject: the first section (scenography

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Mar 27 2020
Journal Name
Iraqi Journal Of Science
Comparison between Dipole-dipole and Pole-dipole Arrays in Delineation of Subsurface Weak Zones Using 2D Electrical Imaging Technique in Al- Anbar University, Western Iraq
...Show More Authors

The presence of natural voids and fractures (weak zones) in subsurface gypsiferous soil and gypsum, within the University of Al-Anbar, western Iraq. It causes a harsher problem for civil engineering projects. Electrical resistivity technique is applied as an economic decipher for investigation underground weak zones. The inverse models of the Dipole-dipole and Pole-dipole arrays with aspacing of 2 m and an n-factor of 6 clearly show that the resistivity contrast between the anomalous part of the weak zone and the background. The maximum thickness and shape are well defined from 2D imaging with Dipole-dipole array, the maximum thickness ranges between 9.5 to 11.5 m. It is concluded that the 2D imaging survey is a useful technique and more

... Show More
View Publication Preview PDF
Scopus (17)
Crossref (3)
Scopus Crossref
Publication Date
Sun Dec 14 2014
Journal Name
Molecular Crystals And Liquid Crysta
Synthesis and Mesomorphic Behavior of Two New Homologous Series Containing Azobenzene and 1,3,4-Oxadiazole Units
...Show More Authors

Two new nonsymmetrical mesogenic homologous series of terminal substituent ether (series [Vn]) and carboxy (series [VIn]) incorporating azobenzene and 1,3,4-oxadiazole group were synthesized. Both series have been All compounds thus isolated were purified and characterized by elemental analysis, Fourier Transform Infrared Spectroscopy, 1H NMR, along with thermal analysis and texture observation using Differential Scanning Calorimetry (DSC) and Polarizing Optical Microscopy (POM), respectively. All compounds of the first series exhibited liquid crystalline properties. The homologues [V1]-[V3] display a nematic mesophase, the compounds [V4]-[V7] exhibit a dimorphism behavior, nematic (N) and smectic A (SmA) mesophases, the compounds [V8] and

... Show More
Publication Date
Sat Jan 01 2011
Journal Name
Journal Of Engineering
TWO-PARAMETER GAMMA DISTRIBUTION AND LOG NORMAL DISTRIBUTION FOR DERIVATION OF SYNTHETIC UNIT HYDROGRAPH
...Show More Authors

Most available methods for unit hydrographs (SUH) derivation involve manual, subjective fitting of
a hydrograph through a few data points. The use of probability distributions for the derivation of synthetic
hydrographs had received much attention because of its similarity with unit hydrograph properties. In this
paper, the use of two flexible probability distributions is presented. For each distribution the unknown
parameters were derived in terms of the time to peak(tp), and the peak discharge(Qp). A simple Matlab
program is prepared for calculating these parameters and their validity was checked using comparison
with field data. Application to field data shows that the gamma and lognormal distributions had fit well.<

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Dec 30 2020
Journal Name
Journal Of Planner And Development
The Infrastructure and the Potential of the Tourism Industry in the Holy City of Najaf.
...Show More Authors

The infrastructure is one of the basic components of the tourism industry in Iraq in general and in Najaf in particular, in spite of there are obstacles and problems that which are hindered the development of tourism in Iraq, some of them are related to the  tourism industry itself, some are related to the security and political situation, and some are related to poor management of tourism. However, the infrastructure is considered the cornerstone of the success of the tourism industry in Iraq and other countries, if it is available, it can be a potential indicator of success, and on the contrary, it is a hindrance to go forward. The aim of this research is to shed light on the availability of requirements for the s

... Show More
View Publication Preview PDF
Publication Date
Sun Feb 02 2025
Journal Name
Modern Sport
Time out in basketball and it effect on playing for excellent degrees in Iraq
...Show More Authors

The value of time out as a time not count of official time form the game like four periods and extra time also it considered a great interest if used well thru the game , the importance of this problem is not using well the time out and when the coach ask for time out and how to invest this time legally to make good results also there is no observing system as the researcher see gives the reality image that the coach is successful lead the game when he takes time out . The goals of research that knowing on numbers of time out for excellent teams in Iraq (first &second) stages and putting special inventory reverse reality of asking time out (positive &negative) on playing basketball , the hypothesis of research that tell the time out effect

... Show More
View Publication Preview PDF
Publication Date
Sat Oct 22 2022
Journal Name
Aro-the Scientific Journal Of Koya University
Classification of Different Shoulder Girdle Motions for Prosthesis Control Using a Time-Domain Feature Extraction Technique
...Show More Authors

Abstract—The upper limb amputation exerts a significant burden on the amputee, limiting their ability to perform everyday activities, and degrading their quality of life. Amputee patients’ quality of life can be improved if they have natural control over their prosthetic hands. Among the biological signals, most commonly used to predict upper limb motor intentions, surface electromyography (sEMG), and axial acceleration sensor signals are essential components of shoulder-level upper limb prosthetic hand control systems. In this work, a pattern recognition system is proposed to create a plan for categorizing high-level upper limb prostheses in seven various types of shoulder girdle motions. Thus, combining seven feature groups, w

... Show More
View Publication Preview PDF
Crossref (1)
Clarivate Crossref
Publication Date
Thu Dec 01 2022
Journal Name
Ieee Transactions On Human-machine Systems
Myoelectric Control With Fixed Convolution-Based Time-Domain Feature Extraction: Exploring the Spatio–Temporal Interaction
...Show More Authors

View Publication
Scopus (13)
Crossref (13)
Scopus Clarivate Crossref
Publication Date
Fri Jul 01 2016
Journal Name
Journal Of Engineering
Determination of Mono-crystalline Silicon Photovoltaic Module Parameters Using Three Different Methods
...Show More Authors

For modeling a photovoltaic module, it is necessary to calculate the basic parameters which control the current-voltage characteristic curves, that is not provided by the manufacturer. Generally, for mono crystalline silicon module, the shunt resistance is generally high, and it is neglected in this model. In this study, three methods are presented for four parameters model. Explicit simplified method based on an analytical solution, slope method based on manufacturer data, and iterative method based on a numerical resolution. The results obtained for these methods were compared with experimental measured data. The iterative method was more accurate than the other two methods but more complexity. The average deviation of

... Show More
View Publication Preview PDF