Determine Optimal Preventive Maintenance Time Using Scheduling Method
...Show More Authors

In this paper, the reliability and scheduling of maintenance of some medical devices were estimated by one variable, the time variable (failure times) on the assumption that the time variable for all devices has the same distribution as (Weibull distribution.

The method of estimating the distribution parameters for each device was the OLS method.

The main objective of this research is to determine the optimal time for preventive maintenance of medical devices. Two methods were adopted to estimate the optimal time of preventive maintenance. The first method depends on the maintenance schedule by relying on information on the cost of maintenance and the cost of stopping work and access to the optimum time for maintenance, which achieves the lowest costs. The second method depends on the reliability function, which was to determine the optimal maintenance period, which then cost less Can. We also proved through this research that the method of scheduling is better than the method of relying on the reliability function because it depends heavily on the cost of maintenance.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Thu May 18 2023
Journal Name
Journal Of Engineering
Optimal Dimensions of Small Hydraulic Structure Cutoffs Using Coupled Genetic Algorithm and ANN Model
...Show More Authors

A genetic algorithm model coupled with artificial neural network model was developed to find the optimal values of upstream, downstream cutoff lengths, length of floor and length of downstream protection required for a hydraulic structure. These were obtained for a given maximum difference head, depth of impervious layer and degree of anisotropy. The objective function to be minimized was the cost function with relative cost coefficients for the different dimensions obtained. Constraints used were those that satisfy a factor of safety of 2 against uplift pressure failure and 3 against piping failure.
Different cases reaching 1200 were modeled and analyzed using geo-studio modeling, with different values of input variables. The soil wa

... Show More
View Publication Preview PDF
Crossref (11)
Crossref
Publication Date
Sun Sep 01 2013
Journal Name
International Journal Of Advanced Research In Computer Science And Software Engineering
Real Time Motion Detection in Surveillance Camera Using MATLAB
...Show More Authors

Surveillance cameras are video cameras used for the purpose of observing an area. They are often connected to a recording device or IP network, and may be watched by a security guard or law enforcement officer. In case of location have less percentage of movement (like home courtyard during night); then we need to check whole recorded video to show where and when that motion occur which are wasting in time. So this paper aims at processing the real time video captured by a Webcam to detect motion in the Scene using MATLAB 2012a, with keeping in mind that camera still recorded which means real time detection. The results show accuracy and efficiency in detecting motion

Preview PDF
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Mar 01 2020
Journal Name
Baghdad Science Journal
Indirect Spectrofluorometric Method for the Determination of Cefotaxime Sodium, Ciprofloxacin Hydrochloride and Famotidine in Pharmaceuticals Using Bromate-Bromide and Acriflavine Dye
...Show More Authors

An Indirect simple sensitive and applicable spectrofluorometric method has been developed for the determination of Cefotaxime Sodium (CEF), ciprofloxacin Hydrochloride (CIP) and Famotidine (FAM) using reaction system bromate-bromide and acriflavine (AF) as fluorescent dye. The method is based on the oxidation of drugs with known excess bromate-bromide mixture in acidic medium and subsequent determination of unreacted oxidant by quenching fluorescence of AF. Fluorescence intensity of residual AF was measured at 528 nm after excitation at 402 nm. The fluorescence-concentration plots were rectilinear over the ranges 0.1-3.0, 0.05-2.6 and 0.1-3.8 µg ml-1 with lower detection limits of 0.013, 0.018 and 0.021 µg ml-1 an

... Show More
View Publication Preview PDF
Scopus (12)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Wed Mar 18 2020
Journal Name
Baghdad Science Journal
Spectrophotometric and Reverse Flow Injection Method Determination of Nitrazepam in Pharmaceuticals Using O-Coumaric Acid as a New Chromogenic Reagent
...Show More Authors

            A spectrophotometric- reverse flow injection analysis (rFIA) method has been proposed for the   determination of Nitrazepam (NIT) in pure and pharmaceutical preparations. The method is based upon the coupling reaction of NIT with a new reagent O-Coumaric acid (OCA) in the presence of sodium periodate in an aqueous solution. The blue color product was measured at 632 nm. The variation (chemical and physical parameters) related with reverse flow system were estimated. The linearity was over the range 15 - 450 µg/mL of NIT with detection limits and limit of quantification of 3.425 and 11.417 µg mL-1 NIT,respectively. The sample throughput of 28 samples

... Show More
View Publication Preview PDF
Scopus (10)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Mon Jan 04 2021
Journal Name
Medico-legal Update
Knowledge and Practice of Pregnant Iraqi Women about COVID-19 Preventive Measures
...Show More Authors

View Publication
Crossref
Publication Date
Fri Dec 01 2023
Journal Name
Civil And Environmental Engineering
Managing the Utilization of Preventive Measures for Fire Resistance in the Hospitals
...Show More Authors
Abstract<p>The study analyzed the current situation of public hospitals in the capital of Baghdad exclusively and diagnosed the resources available; especially after the high demand for these hospitals as a result of the citizen’s need to review the hospital to take care of them, especially after the Corona pandemic. Eight major hospitals in Baghdad were selected to determine the current reality of providing fire safety tools or equipment and what are the preventive measures needed to reduce it. The results after practical study showed many defects and weaknesses in the current situation due to their reliance on the traditional management to manage and provide all preventive measures and safet</p> ... Show More
View Publication
Scopus (2)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Thu Oct 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
Project Scheduling By using Goals Programming – An Applied Research In Modern Village Project (Residential Building Aspectin In Wasit Governorate)
...Show More Authors

One of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit  governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building pro

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Oct 08 2023
Journal Name
European Scholar Journal
THE EFFECT OF AGILE MANUFACTURING STRATEGY ON TOTAL PRODUCTIVE MAINTENANCE
...Show More Authors

This research aims to analyze the impact of effective manufacturing strategy on total productive maintenance. Effective manufacturing focuses on improving product quality, increasing productivity, and reducing costs, while total productive maintenance focuses on maintaining machines and equipment in good operational condition and high efficiency. The research seeks to understand how to achieve integration between these two dimensions to achieve excellent performance in manufacturing operations. The study was conducted using the General Company for Battery Manufacturing as a research community, with a sample size of 60 individuals. The research found significant results, including the fact that using an effective manufacturing strategy leads

... Show More
Publication Date
Tue Nov 01 2022
Journal Name
Journal Of Engineering
Artificial Neural Network Model for Wastewater Projects Maintenance Management Plan
...Show More Authors

Wastewater projects are one of the most important infrastructure projects, which require developing strategic plans to manage these projects. Most of the wastewater projects in Iraq don’t have a maintenance plan. This research aims to prepare the maintenance management plan (MMP) for wastewater projects. The objective of the research is to predict the cost and time of maintenance projects by building a model using ANN. The research sample included (15) completed projects in Wasit Governorate, where the researcher was able to obtain the data of these projects through the historical information of the Wasit Sewage Directorate. In this research artificial neural networks (ANN) technique was used to build two models (cost

... Show More
View Publication Preview PDF
Crossref (2)
Crossref