Given the importance of the phenomenon of bullying and its spread in the productions of animated films and the resulting impact on them, and the dominance of a large number of satellite channels that simulate different age stages and for both sexes. It is bullying others and their imitation of characters inspired by animated films with aggressive behavior that appears in them by imposing his authority by force on those who are weaker than him and in various methods that fall within the concept of bullying, and the interest of most satellite channels in this type of production that simulates different age groups, this research comes as an attempt A scientific method through which the researcher seeks to know the issue of the dramatic construction of bullying scenes in animated films and the drama embodied in their scenes by analyzing scenes from different samples in order to reveal them. Based on the foregoing, the research deals with an important aspect of the creative process in animation-oriented production, through the elements of the cinematic language, by identifying its expressive and semantic data. of job performance.
In this research for each positive integer integer and is accompanied by connecting that number with the number of Bashz Attabq result any two functions midwives to derive a positive integer so that there is a point
Many economic entities working in multiple industrial fields suffer fromlow techniques in using modern administrative means in their works. The mostused tool in measuring required procedures is to adopt and use quality costs. inspite of complications and bronchial of operations in construction projects, Theresearcher was able to find a structure to quality costs according to traditionclassification (prevention, Appraisal, failure) which enables the calculation ofthese costs and then analyze results and setting standards which can beimplemented in evaluating strategic performance for targeted project. and theforge research in theoretical fly to quality and costs concerning it inconstruction section , as well as strategically performance a
... Show MoreIn this paper, Nordhaus-Gaddum type relations on open support independence number of some derived graphs of path related graphs under addition and multiplication are studied.
Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show MoreConstruction is a hazardous industry with a high number of injuries. Prior research found that many industry injuries can be prevented by implementing an effective safety plan if prepared and maintained by qualified safety personnel. However, there are no specific guidelines on how to select qualified construction safety personnel and what criteria should be used to select an individual for a safety position in the United States (US) construction industry. To fill this gap in knowledge, the study goal was to identify the desired qualifications of safety personnel in the US construction industry. To achieve the study goal, the Delphi technique was used as the main methodology for determining the desired qualifications for constructio
... Show More