Background: Debonding and fracture of artificial teeth from denture bases are common clinical problem, bonding of artificial teeth to heat cure acrylic and high impact heat cure acrylic denture base materials with autoclave processing method is not well known. The aim of this study was to evaluate the effect of autoclave processing method on shear bond of artificial teeth to heat cure denture base material and high impact heat cure denture base material. Materials and methods: Heat polymerized (Vertex) and high impact acrylic (Vertex) acrylic resins were used. Teeth were processed to each of the denture base materials after the application of different surface treatments. The sample (which consist of artificial tooth attached to the denture base at 45 degree) are consist of (80) artificial teeth from the same model of central incisor, they were prepared , treated and bonded to the conventional heat cured and high impact acrylic denture base material then processed. Control group (Group A 40 samples) in which acrylic resins PMMA cured by conventional water- bath processing technique (74°C for 1.5 hours then boil for 30 minutes),the group was subdivided to 20 samples heat cure acrylic and 20 samples high impact acrylic. Experimentalgroups (Group B 40 samples) in which acrylic resins was cured by autoclave at 121°C, 210KPa. For 30min.the group subdivided to 20 samples heat cure acrylic and 20 samples high impact acrylic. For each subgroup, the 20 samples were subdivided according to surface treatment into: 1-Five acrylic teeth without any surface treatment (control). 2- Five acrylic teeth with diatoric preparation (retention grooves). 3- Five acrylic teeth conditioned with thinner. 4- Five acrylic teeth with retention grooves and thinner. Results: Statistical analysis revealed that chemical and mechanical treatment of acrylic teeth improved the shear bond with heat cure and high impact acrylicalsoautoclave processing improvedthe shear bond with acrylic teeth in high impact acrylic. Conclusion: Autoclave polymerization is suggested as alternative method for processing denture base resins. Autoclave polymerization can be easily performed in laboratory conditions. In High Impact Acrylic, there were highly significant differences of autoclave processing technique compared with water bath regarding the shear bond strength with acrylic teeth.
In this paper, a computational method for solving optimal problem is presented, using indirect method (spectral methodtechnique) which is based on Boubaker polynomial. By this method the state and the adjoint variables are approximated by Boubaker polynomial with unknown coefficients, thus an optimal control problem is transformed to algebraic equations which can be solved easily, and then the numerical value of the performance index is obtained. Also the operational matrices of differentiation and integration have been deduced for the same polynomial to help solving the problems easier. A numerical example was given to show the applicability and efficiency of the method. Some characteristics of this polynomial which can be used for solvin
... Show MoreHard water does not pose a threat to human health but may cause precipitation of soap or results stone in the boilers. These reactions are caused by the high concentrations of Ca and Mg. In the industry they are undesirable because of higher fuel consumption for industrial use .Electromagnetic polarization water treatment is a method which can be used for increasing the precipitation of Ca 2+ and CO3 2- ions in hard water to form CaCO3 which leads to decrease the water hardness is research has been conducted by changing the number of coil turns and voltage of the system. The spectroscopy electron microscope was used for imaging the produced crystals. Results of the investigation indicated that
... Show MoreThere is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.
Earned Value Method is used in the project o
... Show MoreThe Enhanced Thematic Mapper Plus (ETM+) that loaded onboard the Landsat-7 satellite was launched on 15 April 1999. After 4 years, the image collected by this sensor was greatly impacted by the failure of the system’s Scan Line Corrector (SLC), a radiometry error.The median filter is one of the basic building blocks in many image processing situations. Digital images are often distorted by impulse noise due to errors generated by the noise sensor, errors that occur during the conversion of signals from analog-to-digital, as well as errors generated in communication channels. This error inevitably leads to a change in the intensity of some pixels, while some pixels remain unchanged. To remove impulse noise and improve the quality of the
... Show MoreNanosilica was extracted from rice husk, which was locally collected from the Iraqi mill at Al-Mishikhab district in Najaf Governorate, Iraq. The precipitation method was used to prepared Nanosilica powder from rice husk ash, after treating it thermally at 700°C, followed by dissolving the silica in the alkaline solution and getting a sodium silicate solution. Two samples of the final solution were collected to study the effect of filtration on the purity of the sample by X-ray fluorescence spectrometry (XRF). The result shows that the filtered samples have purity above while the non-filtered sample purity was around The structure analysis investigated by the X-ray diffraction (XRD), found that the Nanosilica powder has an amorphous
... Show MoreIt is suitable to use precast steel-concrete composite beams to quickly assemble a bridge or a building, particularly in isolated regions where cast-in-situ concrete is not a practical option. If steel-concrete composite beams are designed to allow demountability, they can also be extremely useful in the aftermath of natural disasters, such as earthquakes or flooding, to replace damaged infrastructure. Furthermore, rapid replacement of slabs is extremely beneficial in case of severe deterioration due to long-term stressors such as fatigue or corrosion. The only way to rapidly assemble and disassemble a steel-concrete composite structure is to use demountable shear connectors to connect/disconnect the steel beams to/from the concrete slab. I
... Show MoreThe aim of this study is to propose reliable equations to estimate the in-situ concrete compressive strength from the non-destructive test. Three equations were proposed: the first equation considers the number of rebound hummer only, the second equation consider the ultrasonic pulse velocity only, and the third equation combines the number of rebound hummer and the ultrasonic pulse velocity. The proposed equations were derived from non-linear regression analysis and they were calibrated with the test results of 372 concrete specimens compiled from the literature. The performance of the proposed equations was tested by comparing their strength estimations with those of related existing equations from literature. Comparis
... Show MoreThis paper reports a study of the effects of steel plate diaphragms on shear lag in steel box girders within the elastic range of material property and without including the effect of plate buckling. STAAD.Pro program had been utilized to evaluate and determine top flange stress distribution and the actual effective flanges width in steel box girders with or without diaphragms. Shell elements had been used to model the flanges, webs, and diaphragms. Different numbers, thickness and types for the plate diaphragms have been used to determine their effects on the shear lag in the flange. Using diaphragms had affected slightly shear lag. The diaphragms number affected obviously the shear lag in the top flange, especially the magnitude of maximu
... Show MoreThis paper studies the effects of stiffeners on shear lag in steel box girders with stiffened flanges. A three-dimensional linear finite element analysis using STAAD.Pro V8i program has been employed to evaluate and determine the actual top flange stress distribution and effective width in steel box girders. The steel plates of the flanges and webs have been modeled by four-node isoparametric shell elements, while the stiffeners have been modeled as beam elements. Different numbers (4, 8, and 15) for the steel stiffeners have been used in this study to establish their effects on the shear lag and longitudinal stresses in the flange. Using stiffeners reduced the magnitude of the top flange longitudinal stresses about 40%, but did
... Show More