Purpose: aims the study to show How to be can to enhance measurement management by incorporating a risk-based approach and the six sigma method into a more thorough assessment of metrological performance. Theoretical framework: Recent literature has recorded good results in analyzing the impact of Six Sigma and risk management on the energy sector (Barrera García et al., 2022) (D'Emilia et al. 2015). However, this research came to validate and emphasize the most comprehensive assessment of metrological performance by integrating Risk management based approach and Six Sigma analysis. Design/methodology/approach: This study was conducted in Iraqi petroleum refining companies. System quality is measured in terms of sigmas, and two indices—one for actualizing metrological risk and another for its management—are assessed. Findings: We find the all dimensions of the six sigma projects implemented facilitate the correction and adaptation of the main tasks aimed at improving the measurement management system. Research, Practical & Social implications: a risk-based approach and the six sigma method are can enhance the measurement management system and collect feedback on its performance. Originality/value: The merge a risk-based approach and the six sigma method its usefulness as a methodological tool for enhancing measurement management has been demonstrated.
In this study; a three-dimensional model was created to simulate groundwater in Al-Haydariyah area of the governorate of Al-Najaf. A solid model was created to utilize the cross sections of 25 boreholes in the research region, and it was made out of two layers: sand and clay. The steady-state calibration was employed in six observation wells to calibrate the model and establish the hydraulic conductivity, which was 17.49 m/d for sand and 1.042 m/d for clay, with a recharge rate of 0.00007 m/day. The wells in the research region were reallocated with a distance of 1500 m between each well, resulting in 140 wells evenly distributed throughout the study area and with a discharge of 5 l/s, and the scenarios were run for 1000
... Show MoreSewage water is a mixture of water and solids added to water for various uses, so it needs to be treated to meet local or global standards for environmentally friendly waste production. The present study aimed to analyze the new Maaymyrh sewage treatment plant's quality parameters statistically at Hilla city. The plant is designed to serve 500,000 populations, and it is operating on a biological treatment method (Activated Sludge Process) with an average wastewater inflow of 107,000m3/day. Wastewater data were collected daily by the Mayoralty of Hilla from November 2019 to June 2020 from the influent and effluent in the (STP) new in Maaymyrh for five water quality standards, such as (BOD5), (COD), (TSS), (TP)
... Show MoreThe results of the study showed the statistical significant difference (P≥0.05) for each of the relative weight of the yolk and egg whites, the relative weight of the shell and the Hauh unit, which is affected positively by the addition of ground fenugreek seed and Laurels leave to the quail bird's diet. There is also a statistically significant difference positively for each of the percentage of ash, protein and carbohydrates for qualis egg, while there is no significant difference for both the percentage of moisture and fat. The results of the mineral estimation showed an increase in each of the elements of iron, copper and cadmium from the addition of fenugreek and laurels leave, while there was no significant difference for
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreBackground: Febrile convulsions are the most frequent type of seizures in children under 6 years of age. Significant percentage of these children will later suffer from recurrence of febrile convulsion.Objectives: To identify the main risk factors for recurrent febrile convulsions in children.Methods: we carried out a case control study involving 89 children those who experienced first attack of febrile convulsions and 92 children with recurrent attack of febrile convulsions. The study was conducted in Central Children Teaching Hospital, Baghdad during the period 2006- 2007. Results: Compared to children with first attack of febrile convulsion, children with recurrent seizures were younger at onset (4- 12m) (67% vs. 44%), mainly male (70
... Show MoreBackground: Hashimoto's thyroiditis has been found to coexist with differentiated thyroid cancer in surgical specimens, but an association between the two conditions has been discounted by the medical literature. So, we performed this research to determine any potential relationship between Hashimoto's thyroiditis and the risk of developing differentiated thyroid cancer in clinical status. we assessed the related clinical factors linking these conditions, especially serum thyroid-stimulating hormone concentration, family history of thyroid disease, gender& young age group. Aim of study: to determine that hashimoto’s thyroiditis increases risk for differentiated thyroid carcinoma. Patients and method: This study is a Cross-sectiona
... Show MoreThe process of risk assessment in the build-operate transfer (BOT) project is very important to identify and analyze the risks in order to make the appropriate decision to respond to them. In this paper, AHP Technique was used to make the appropriate decision regarding response to the most prominent risks that were generated in BOT projects, which includes a comparison between the criteria for each risk as well as the available alternatives and by mathematical methods using matrices to reach an appropriate decision to respond to each risk.Ten common risks in BOT contracts are adopted for analysis in this paper, which is grouped into six main risk headings.The procedures followed in this paper are the questionnaire method
... Show More